# ZENIT Research Archive review

27 November 2026

Reviewed all **103 open entries** from website release 278 (382 total entries: 279 Done and 103 Undone).

**Completed:** eight bounded initial synthetic reference outputs covering 27 authored cases, with eight automated checks. These checks test the reference calculations and adverse fixtures; they are not independent validation.

**Still open:** the 103 parent research entries. Physical testing, actual measurements, participant trials, supplier/facility decisions, regulatory permissions and independent ZSA acceptance have not been completed by this desktop review.

[Published review](https://www.zeniteclipse.com/ZENIT_Research_Review) · [Undone archive](https://www.zeniteclipse.com/ZENIT_Research_Archive?status=undone)

## Initial reference outputs

### A neighbourhood that remembers heat

Scope: Ideal interval heat ledger. Cases: 3.

Storage shifts the invented 40 kWh surplus into later demand: backup falls from 40 to 0 kWh in this ideal case. No net electricity saving is established. A 45 °C source fails the example 60 °C service condition.

Assumptions:

- Invented three-interval source [60, 0, 0] kWh and demand [20, 30, 10] kWh.
- Ideal lossless storage, unlimited capacity/rate, and ideal resistive backup; pumps and exchanger performance are unassigned.
- Both comparisons deliver 60 kWh and begin/end with zero stored heat. Temperatures are example inputs.

[Results and raw inputs](https://www.zeniteclipse.com/ZENIT_Research_Review#study-heat-memory)

### A habitat that can explain itself

Scope: Six service-log interpretation fixtures. Cases: 6.

The replay retains missing, stale and dependent readings as unresolved. An observed zero remains a shortfall rather than being silently treated as missing. Human understanding remains untested.

Assumptions:

- All logs are invented and nonpersonal.
- The two-second freshness window is an example, not a specified equipment limit.
- No participants or independent reviewers have assessed the wording.

[Results and raw inputs](https://www.zeniteclipse.com/ZENIT_Research_Review#study-readable-habitat)

### Gardens between worlds

Scope: One 24-hour digital garden ledger. Cases: 1.

The example water account closes at 5 L: 12 L initial + 3 L supplied − 6 L uptake − 3 L evaporation − 1 L drain. Example electricity is 0.768 kWh. This establishes ledger consistency only.

Assumptions:

- Four six-hour intervals; water quantities are invented, not measured plant behaviour.
- Example lighting 0.040 kW for 18 hours and pump 0.002 kW for 24 hours.
- No food, oxygen, biomass, crop performance or wellbeing model.

[Results and raw inputs](https://www.zeniteclipse.com/ZENIT_Research_Review#study-gardens-between-worlds)

### An atlas of the unfamiliar

Scope: Six synthetic observation classifications. Cases: 6.

Known faults retain an instrument explanation; common processing and missing calibration remain unresolved. An independent unusual fixture becomes a candidate only, with no discovery claim.

Assumptions:

- Ordinary signals, unusual signals and instrument faults are authored fixtures.
- The replay knows the injected faults; this is not a blinded detection trial.

[Results and raw inputs](https://www.zeniteclipse.com/ZENIT_Research_Review#study-unfamiliar-atlas)

### Materials with a life story

Scope: Three illustrative strain histories. Cases: 3.

The invented temperature correction returns 300 to the historical 100 microstrain, leaves a 30 microstrain residual in the second case, and refuses correction without a coefficient. Actual maintenance interpretation still needs inspection evidence.

Assumptions:

- Invented coefficient 10 microstrain/K and 20 °C reference; no material calibration.
- A residual is an inspection question, not a damage diagnosis or remaining-life prediction.

[Results and raw inputs](https://www.zeniteclipse.com/ZENIT_Research_Review#study-material-journals)

### A home before a home

Scope: Four route and service questions in an invented room graph. Cases: 4.

The graph locates two service points and retains a cabin route. Removing the sole systems-room connection leaves the air-filter route unavailable, exposing an access dependency for redesign and later walkthroughs.

Assumptions:

- Connections are illustrative and undimensioned.
- Graph access is distinct from human usability, fire escape, clearances and habitability.
- No participant trial or reserve duration is supplied.

[Results and raw inputs](https://www.zeniteclipse.com/ZENIT_Research_Review#study-home-before-home)

### The coastal commons

Scope: One fictional community resource map. Cases: 1.

All example loads require 14 kWh against 12 kWh available, a 2 kWh shortfall. The three declared essential loads total 9 kWh, leaving 3 kWh before any unmodelled costs. Map and list share the same account.

Assumptions:

- One illustrative interval with 12 kWh available; all loads are invented.
- No real town, clinical service, potable-water rating or emergency continuity claim.
- Heating, storage, losses and actual site conditions remain unassigned.

[Results and raw inputs](https://www.zeniteclipse.com/ZENIT_Research_Review#study-coastal-commons)

### Current cartography

Scope: Three passive-observation counterexamples. Cases: 3.

A shared injected periodic bias produces r = 1 in both channels; removing that known bias leaves flat residuals and undefined correlation. An independent repeated fixture remains a candidate; missing clock context remains unresolved.

Assumptions:

- All eight-sample series and timing/dependency labels are authored fixtures.
- Removing the known injected bias is a counterexample, not a validated artifact-removal method.
- No actual astronomical data, force, propulsion or travel evidence.

[Results and raw inputs](https://www.zeniteclipse.com/ZENIT_Research_Review#study-current-cartography)

## Review of all open entries

Every entry below retains **Undone** for its outstanding research scope. “Work completed” describes this review or a bounded initial output.

### Fusion Power Facility

ID: `project-earth-earth-fusion` · Earth · Research development

Source: [published record](https://www.zeniteclipse.com/#project/earth-fusion)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Design inputs and physical qualification

**Next step:** Freeze the plasma/fuel-cycle and conductor design basis against the existing 5.30 GWth / 2.00 GWe targets; close G1–G10 with traceable evidence before claiming an operating plant. Keep the single Earth core and separate Energy Island.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### SERAT Energy Island

ID: `project-earth-earth-serat` · Earth · Research development

Source: [published record](https://www.zeniteclipse.com/#project/earth-serat)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Measured bench evidence

**Next step:** Define actual source/customer temperatures and the concurrent electrical, useful-heat, store and rejected-heat accounts; compare matched useful service and matched starting/ending storage on a metered bench.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### ZC-1 · Hydrogen Car

ID: `project-earth-zc1` · Earth · Research development

Source: [published record](https://www.zeniteclipse.com/#project/zc1)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Design inputs and physical qualification

**Next step:** Complete the civilian vehicle requirements, hydrogen inventory and pressure-integrity evidence register; independently review the combustion drivetrain and vapour-regulation interfaces before vehicle testing or performance claims.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### ZA-1 · Hydrogen Jet

ID: `project-earth-za1` · Earth · Research development

Source: [published record](https://www.zeniteclipse.com/#project/za1)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Design inputs and physical qualification

**Next step:** Retain 350–420 passengers and 39,000 ft as targets; establish mass, operating envelope and heat duties, select a qualified secondary-loop fluid, and obtain independent airworthiness review of the two isolated anti-ice loops.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### ZA-P01 · Propeller Aircraft

ID: `project-earth-zap01` · Earth · Research development

Source: [published record](https://www.zeniteclipse.com/#project/zap01)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Design inputs and physical qualification

**Next step:** Define this aircraft’s own mission, mass, nacelle and turbine/gearbox/propeller interfaces; obtain platform-specific evidence rather than inheriting ZA-1 ratings.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### ZH-1 · Hydrogen Helicopter

ID: `project-earth-zh1` · Earth · Research development

Source: [published record](https://www.zeniteclipse.com/#project/zh1)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Design inputs and physical qualification

**Next step:** Reconcile the dual hydrogen, triplex-control and reserve-shaft architecture into a configuration-specific requirements and fault register; independent aircraft certification evidence remains required.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### ZP-1 · Passenger Boat

ID: `project-earth-zp1` · Earth · Research development

Source: [published record](https://www.zeniteclipse.com/#project/zp1)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Design inputs and physical qualification

**Next step:** Complete the passenger/load, stability and essential-service requirements, then obtain marine review of storage zoning, detection, ventilation, isolation, fire protection and evacuation.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### ZB-1 · Sports Boat

ID: `project-earth-zb1` · Earth · Research development

Source: [published record](https://www.zeniteclipse.com/#project/zb1)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Design inputs and physical qualification

**Next step:** Keep 17.5 × 4.8 m, 24 t, 10 persons and 35–40 kn as concept references; establish mass/loading and stability evidence, then independently assess the proposed operating envelope.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### ZCS-1 · Hydrogen Cruise Ship

ID: `project-earth-zcs1` · Earth · Research development

Source: [published record](https://www.zeniteclipse.com/#project/zcs1)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Design inputs and physical qualification

**Next step:** Reconcile the original four-engine/two-engine-room and four isolated hydrogen-block layout with current passenger and hotel-service loads; keep auxiliary pump-jet count and ratings unassigned until naval-architecture evidence exists.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### LSI · Infrastructure Intelligence

ID: `project-earth-earth-lsi` · Earth · Research development

Source: [published record](https://www.zeniteclipse.com/#project/earth-lsi)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent review and usability

**Next step:** Replay withheld, nonpersonal campus records in conventional-log and explanation views; independently review missing/conflicting readings, uncertainty and operator comprehension. The new six-fixture study is an initial example only.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### SafeSpots & Resilient Facilities

ID: `project-earth-earth-safespots` · Earth · Research development

Source: [published record](https://www.zeniteclipse.com/#project/earth-safespots)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Site and measured service evidence

**Next step:** Choose a specific facility and outage case, define actual essential loads and service durations, and reconcile measured reserve energy and recovery needs for its selected SafeSpot scope.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### Earth Medical & Hospital Research

ID: `project-earth-earth-medical` · Earth · Research development

Source: [published record](https://www.zeniteclipse.com/#project/earth-medical)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent clinical research review

**Next step:** Define the question and evidence standard for each named medical concept, then obtain independent clinical and ethics review before any efficacy, protocol or treatment-capacity claim.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### Integrated Infrared Systems

ID: `project-earth-earth-ir` · Earth · Research development

Source: [published record](https://www.zeniteclipse.com/#project/earth-ir)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Calibration and measured observations

**Next step:** Select each host’s actual detector, field of view and environment; establish calibration, timestamp/uncertainty handling and independent reference measurements for each diagnostic use.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### ZENIT Academy & Learning

ID: `project-earth-earth-academy` · Earth · Research development

Source: [published record](https://www.zeniteclipse.com/#project/earth-academy)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent review and usability

**Next step:** Map the published facility-outage learning exercise to explicit learning goals and review its factual basis; use withheld tasks and actual learner feedback before claiming educational benefit.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### Long-term Earth Research

ID: `project-earth-earth-research` · Earth · Research development

Source: [published record](https://www.zeniteclipse.com/#project/earth-research)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Design inputs and independent review

**Next step:** Turn each broad energy, infrastructure and environmental question into a bounded hypothesis with declared inputs, comparison, evidence requirement and review criterion; retain unknowns and ordinary outcomes.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### Norak-class Earth landing base

ID: `project-earth-norak-base` · Earth · Research development

Source: [published record](https://www.zeniteclipse.com/#project/norak-base)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Physical interface qualification

**Next step:** Reconcile the R3 fit/R4 reference geometry with the current Norak/Marak configuration; independently establish cradle compatibility, structural and soil limits, cooling and accepted support handover before landing claims.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### AXIOM

ID: `system-axiom` · Shared · System research

Source: [published record](https://www.zeniteclipse.com/#project/axiom)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent protection qualification

**Next step:** Create a phase-specific permission/veto and fault matrix, then independently verify that supervisory permission cannot inhibit autonomous protection or remove unrelated essential/flight support.

**Source evidence boundary in release 278:** The source records a framework, concept or requirement. Installed implementation and independent validation are not recorded as complete.

### NEXUS

ID: `system-nexus` · Shared · System research

Source: [published record](https://www.zeniteclipse.com/#project/nexus)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent review and measured replay

**Next step:** Run withheld source/version and sensor-quality cases with an independent reviewer; verify that stale, conflicting and missing records remain visible and supervisory loss cannot suppress local protection.

**Source evidence boundary in release 278:** The source records a framework, concept or requirement. Installed implementation and independent validation are not recorded as complete.

### SERAT

ID: `system-serat` · Shared · System research

Source: [published record](https://www.zeniteclipse.com/#project/serat)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Measured bench evidence

**Next step:** Reconcile concurrent source, essential/optional load, cooling, store and discharge traces; count reserves once and obtain measured equipment envelopes before integrated allocation acceptance.

**Source evidence boundary in release 278:** The source records a framework, concept or requirement. Installed implementation and independent validation are not recorded as complete.

### GENI

ID: `system-geni` · Shared · System research

Source: [published record](https://www.zeniteclipse.com/#project/geni)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Physical interaction qualification

**Next step:** Tie each requested setting to a measured actuator/field state and separately measured effect, with hull-specific power/cooling limits. Preserve the distinct Earth Inverse and Space 25-region geometries.

**Source evidence boundary in release 278:** The source records a framework, concept or requirement. Installed implementation and independent validation are not recorded as complete.

### ZENIT Safety Authority

ID: `system-zsa` · Shared · System research

Source: [published record](https://www.zeniteclipse.com/#project/zsa)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent acceptance and governance

**Next step:** Establish the actual independent review roles and configuration-linked hazard, test, deviation and anomaly records; an independent authorized reviewer must sign each acceptance decision.

**Source evidence boundary in release 278:** The source records a framework, concept or requirement. Installed implementation and independent validation are not recorded as complete.

### Infrared sensing · ZIR-R1

ID: `system-ir` · Shared · System research

Source: [published record](https://www.zeniteclipse.com/#project/ir)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Calibration and measured observations

**Next step:** Obtain detector calibration, field-of-view and timestamp/uncertainty records for each use; compare against independent measurements and keep diagnostic advice separate from qualified protection.

**Source evidence boundary in release 278:** The source records a framework, concept or requirement. Installed implementation and independent validation are not recorded as complete.

### Telemetrics

ID: `system-telemetrics` · Shared · System research

Source: [published record](https://www.zeniteclipse.com/#project/telemetrics)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Measured replay and independent review

**Next step:** Replay source identity, sequence, integrity, stale/missing samples and link-loss cases using measured campus traces; retain event records and independently review gateway behaviour.

**Source evidence boundary in release 278:** The source records a framework, concept or requirement. Installed implementation and independent validation are not recorded as complete.

### LSI

ID: `system-lsi` · Earth · System research

Source: [published record](https://www.zeniteclipse.com/#project/lsi)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent review and usability

**Next step:** Compare ordinary logs and LSI-style explanations on withheld nonpersonal service cases with actual participants and independent interpretation; retain uncertainty without transferring physical authority to the display.

**Source evidence boundary in release 278:** The source records a framework, concept or requirement. Installed implementation and independent validation are not recorded as complete.

### Independent Local Protection

ID: `system-local-protection` · Earth · System research

Source: [published record](https://www.zeniteclipse.com/#project/local-protection)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent protection qualification

**Next step:** Demonstrate the configuration-specific protection chain under loss of supervisory network, main AC and workstation, including protected local power and measured restart conditions.

**Source evidence boundary in release 278:** The source records a framework, concept or requirement. Installed implementation and independent validation are not recorded as complete.

### Qi Vanguard Fleet

ID: `project-space-qi-fleet` · Space · Research development

Source: [published record](https://www.zeniteclipse.com/ZENIT_Space#project/qi-fleet)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Physical qualification by vessel

**Next step:** Maintain the 18-vessel configuration and source-specific power arrangements; obtain per-vessel and formation evidence for concurrent loads, docking and the 0.075c design target. Norak/Marak planetary operation needs its own evidence.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### Centri · Fleet coordination and recovery

ID: `project-space-centri` · Space · Research development

Source: [published record](https://www.zeniteclipse.com/ZENIT_Space#project/centri)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Design inputs and physical qualification

**Next step:** Freeze the current longitudinal CFH-M1 reference and local interface inventory; independently assess its power, heat, structure, recovery and coordination paths. Historical passes and dimensions confer no current hull ratings.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### Norak · QAC-1 planetary cruiser

ID: `project-space-norak` · Space · Research development

Source: [published record](https://www.zeniteclipse.com/ZENIT_Space#project/norak)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Physical interface qualification

**Next step:** Reconcile the current Gen 2 cruiser model with its source revision and base; establish actual mass/CG, entry heating, stability, actuator limits and mechanical support handover before planetary-operation claims.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### Vessel Power & Propulsion

ID: `project-space-space-power` · Space · Research development

Source: [published record](https://www.zeniteclipse.com/ZENIT_Space#project/space-power)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Measured bench evidence

**Next step:** Create a vessel-specific concurrent source/load, thermal and propellant account through the protected lanes, MCC and MAGTRANS interfaces; use measured inputs and independent review before assigning propulsion or braking capability.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### CMC & Vessel Reference

ID: `project-space-space-cmc` · Space · Research development

Source: [published record](https://www.zeniteclipse.com/ZENIT_Space#project/space-cmc)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Calibration and measured observations

**Next step:** Recover the dimensional/reference specification for the selected hull and verify transforms, timestamps and independent reference dependencies. CMC remains a reference rather than a power source.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### Outverse & Aurora Shield

ID: `project-space-space-outverse` · Space · Research development

Source: [published record](https://www.zeniteclipse.com/ZENIT_Space#project/space-outverse)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Physical interaction qualification

**Next step:** Retain five layers × five sectors; measure each proposed interaction and its energy/thermal account by hazard and hull configuration. Neither valid control logic nor coil feedback establishes protection.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### Drone allocation and R21 planning

ID: `project-space-space-drones` · Space · Research development

Source: [published record](https://www.zeniteclipse.com/ZENIT_Space#project/space-drones)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Physical interface qualification

**Next step:** Reconcile the 62 assigned drones and 74 planned berths against each host’s actual geometry, services, restraints and maintenance access. Empty berths do not establish spare aircraft or operational availability.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### Navigation & AGCM

ID: `project-space-space-navigation` · Space · Research development

Source: [published record](https://www.zeniteclipse.com/ZENIT_Space#project/space-navigation)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Calibration and measured observations

**Next step:** Validate timestamped geometry, uncertainty and reference-frame transforms with independent observations; verify hold/abort advisories on withheld cases without substituting route clearance for force or support capacity.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### Vessel Medical & Survival

ID: `project-space-space-medical` · Space · Research development

Source: [published record](https://www.zeniteclipse.com/ZENIT_Space#project/space-medical)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent clinical and life-support review

**Next step:** Define crew services, clinical scope and qualified medical-equipment exposure limits separately; measure essential-service and reserve requirements and obtain independent medical/life-support review.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### Space Infrared Integration

ID: `project-space-space-ir` · Space · Research development

Source: [published record](https://www.zeniteclipse.com/ZENIT_Space#project/space-ir)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Calibration and measured observations

**Next step:** Specify the detector, field of view, calibration, timing and environmental envelope by vessel, drone and science use; compare independent observations and retain uncovered hazards as unassessed.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### Frequency Travel

ID: `project-space-space-frequency-travel` · Space · Research development

Source: [published record](https://www.zeniteclipse.com/ZENIT_Space#project/space-frequency-travel)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent physical observation

**Next step:** Define the hypothesised coupling and a predeclared comparison with independently tracked motion, timing and complete force/energy accounting. Passive pattern correlation and shield settings establish no travel mechanism.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### IT-Jump Research

ID: `project-space-space-itjump` · Space · Research development

Source: [published record](https://www.zeniteclipse.com/ZENIT_Space#project/space-itjump)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Design inputs and independent evidence

**Next step:** Write a bounded, testable specification for IT-Jump and the Centri interface, preserving per-vessel readback and local permission. No demonstrated travel mechanism or physical validation is recorded.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### Atlas & Scientific Observation

ID: `project-space-space-atlas` · Space · Research development

Source: [published record](https://www.zeniteclipse.com/ZENIT_Space#project/space-atlas)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent observation review

**Next step:** Use withheld science records with calibrated provenance and measured resource costs; independently review observation questions and uncertainty while keeping mission authorization separate from the advisory planner.

**Source evidence boundary in release 278:** Further development and evidence remain open at the recorded stage. The published brief remains available at its original address.

### Fusion A / B · Major-vessel reference

ID: `system-fusion` · Space · System research

Source: [published record](https://www.zeniteclipse.com/ZENIT_Space#project/fusion)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Physical qualification by source

**Next step:** Produce a source-specific reactor/conversion and residual-heat evidence package; distinguish one source with two feeds from genuinely independent reactors and assess shared dependencies.

**Source evidence boundary in release 278:** The source records a framework, concept or requirement. Installed implementation and independent validation are not recorded as complete.

### Local Fuse A / B

ID: `system-local-fuse` · Space · System research

Source: [published record](https://www.zeniteclipse.com/ZENIT_Space#project/local-fuse)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent protection qualification

**Next step:** Define the actual protected source interface and independently verify fault containment and preservation of essential services against its accepted equipment envelope.

**Source evidence boundary in release 278:** The source records a framework, concept or requirement. Installed implementation and independent validation are not recorded as complete.

### Central Bidirectional Fuse

ID: `system-central-fuse` · Space · System research

Source: [published record](https://www.zeniteclipse.com/ZENIT_Space#project/central-fuse)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent protection qualification

**Next step:** Verify the two lanes’ real dependencies, isolation and bidirectional transfer account using accepted component ratings and measured disturbances; do not assume independence from a diagram.

**Source evidence boundary in release 278:** The source records a framework, concept or requirement. Installed implementation and independent validation are not recorded as complete.

### Vector Accelerator

ID: `system-vector` · Space · System research

Source: [published record](https://www.zeniteclipse.com/ZENIT_Space#project/vector)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Design inputs and measured evidence

**Next step:** Specify the conversion/command-conditioning interface and energy account with measurable input/output variables before assigning any thrust, speed or efficiency.

**Source evidence boundary in release 278:** The source records a framework, concept or requirement. Installed implementation and independent validation are not recorded as complete.

### Central Magnetic Core

ID: `system-cmc` · Space · System research

Source: [published record](https://www.zeniteclipse.com/ZENIT_Space#project/cmc)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Calibration and measured observations

**Next step:** Measure reference transforms and timing against independent witnesses; test disagreement, reference loss and controlled rejoining. Agreement is distinct from energy generation or protective effectiveness.

**Source evidence boundary in release 278:** The source records a framework, concept or requirement. Installed implementation and independent validation are not recorded as complete.

### Independent Reactor Safe Island

ID: `system-irsi` · Space · System research

Source: [published record](https://www.zeniteclipse.com/ZENIT_Space#project/irsi)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent protection qualification

**Next step:** Document the source-specific hardwired protection and residual-heat paths, their local supplies and shared dependencies; obtain independent evidence tied to the exact reactor configuration.

**Source evidence boundary in release 278:** The source records a framework, concept or requirement. Installed implementation and independent validation are not recorded as complete.

### AGCM

ID: `system-agcm` · Space · System research

Source: [published record](https://www.zeniteclipse.com/ZENIT_Space#project/agcm)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent review and measured replay

**Next step:** Use independently referenced geometry and timing records with withheld stale/conflicting cases; verify route/docking holds preserve local protection and required flight reserves.

**Source evidence boundary in release 278:** The source records a framework, concept or requirement. Installed implementation and independent validation are not recorded as complete.

### Gravity Control Chambers

ID: `system-gcc` · Space · System research

Source: [published record](https://www.zeniteclipse.com/ZENIT_Space#project/gcc)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Design inputs and independent evidence

**Next step:** Define an observable gravity-control hypothesis and an independent measurement/comparison that could falsify it; no validated mechanism, force rating or physical result is recorded.

**Source evidence boundary in release 278:** The source records a framework, concept or requirement. Installed implementation and independent validation are not recorded as complete.

### Next verification · NEXUS Evidence Checker

ID: `verification-nexus-evidence-checker` · Shared · Verification work

Source: [published record](https://www.zeniteclipse.com/ZENIT_Developments#nexus-evidence-checker)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent verification of existing prototype

**Next step:** An independent reviewer supplies a blinded set of current and superseded records plus misleading claims. Freeze the expected labels before execution, retain every false positive and missed issue, and verify source access controls outside this checker.

**Source evidence boundary in release 278:** The next verification is specified in the source and is not recorded as completed. The checker assesses supplied records; source truth and independent acceptance still need review.

### Next verification · SERAT Heat-Service Module

ID: `verification-serat-heat-service` · Earth · Verification work

Source: [published record](https://www.zeniteclipse.com/ZENIT_Developments#serat-heat-service)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent verification of existing prototype

**Next step:** Use an approved instrumented thermal bench with the actual source and customer temperature/demand maps. Record calibrated flow, temperature, electrical terminals, store inventory and rejected heat. Compare source-on/source-off cases at matched useful duty. Include loss of customer demand and equipment derating within the bench's approved limits.

**Source evidence boundary in release 278:** The next verification is specified in the source and is not recorded as completed. These are synthetic reference inputs. Actual source, customer and equipment maps are still required.

### Next verification · Joint Power and Thermal Reserve Scheduler

ID: `verification-joint-reserve-scheduler` · Shared · Verification work

Source: [published record](https://www.zeniteclipse.com/ZENIT_Developments#joint-reserve-scheduler)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent verification of existing prototype

**Next step:** Replay measured equipment traces in shadow mode, followed by an isolated controller-in-the-loop bench. Inject delayed resource reports, cooling loss, rejected energy return and competing reservations. Independently calculate accepted-load envelopes and retain shortfalls.

**Source evidence boundary in release 278:** The next verification is specified in the source and is not recorded as completed. The model uses fixed time slots and a conservative thermal approximation. Real resource envelopes remain open.

### Next verification · Outverse Diagnostic Hull Panel

ID: `verification-diagnostic-hull-panel` · Space · Verification work

Source: [published record](https://www.zeniteclipse.com/ZENIT_Developments#diagnostic-hull-panel)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent verification of existing prototype

**Next step:** Calibrate an instrumented coupon over temperature and load before a blinded set of benign localized disturbances. Independently measure event locations and inspect the coupon. Include temperature changes, vibration, invalid channels, timing bias, wave dispersion and multiple events.

**Source evidence boundary in release 278:** The next verification is specified in the source and is not recorded as completed. The reference model uses one isotropic wave speed and a two-dimensional panel. Material calibration and independent inspection are next.

### Next verification · CMC Independent Reference Witness

ID: `verification-cmc-reference-witness` · Shared · Verification work

Source: [published record](https://www.zeniteclipse.com/ZENIT_Developments#cmc-reference-witness)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent verification of existing prototype

**Next step:** Measure the actual reference transforms and timing chain, then apply blinded controlled disturbances on an independently instrumented bench. Include common frame-calibration error, shared upstream dependencies, clock errors and loss of each channel.

**Source evidence boundary in release 278:** The next verification is specified in the source and is not recorded as completed. Declared independence is a model input. It needs physical confirmation, calibrated reference transforms and measured timing.

### Next verification · Hydrogen Accountability Module

ID: `verification-hydrogen-accountability` · Earth · Verification work

Source: [published record](https://www.zeniteclipse.com/ZENIT_Developments#hydrogen-accountability)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent verification of existing prototype

**Next step:** First verify data and mass-accounting interfaces using an approved nonhazardous measurement surrogate. Hydrogen-specific testing then requires the actual qualified installation, calibrated reference inventory, controlled operating records and existing authorized safety procedures. Reconcile complete cycles and investigate all differences; perform matched-duty emissions measurement separately.

**Source evidence boundary in release 278:** The next verification is specified in the source and is not recorded as completed. An inventory difference calls for investigation. Actual tank metrology and emissions measurements are still needed.

### Next verification · Atlas Science Opportunity Planner

ID: `verification-atlas-science-planner` · Space · Verification work

Source: [published record](https://www.zeniteclipse.com/ZENIT_Developments#atlas-science-planner)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent verification of existing prototype

**Next step:** Use withheld observation records with independently reviewed science questions and measured resource costs. Compare predeclared planning baselines on the same opportunities. Reconcile predicted and realized uncertainty reduction, including incorrect priors and correlations. Keep navigation and real mission permission outside the planner.

**Source evidence boundary in release 278:** The next verification is specified in the source and is not recorded as completed. Information gain depends on the assumed priors and correlations. The planner handles up to 18 fixed-time opportunities.

### EarthScout

ID: `equipment-earthscout` · Earth · Equipment development

Source: [published record](https://www.zeniteclipse.com/ZENIT_Equipment#earthscout)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Calibration and usability

**Next step:** Build a non-safety prototype with traceable thermal/temperature/humidity calibration and timestamps; compare the combined display with separate readings on withheld inspection examples and actual user tasks.

**Source evidence boundary in release 278:** Development proposal. Measurement accuracy, usability and the value of the combined interface need prototype testing.

### AirWatch

ID: `equipment-airwatch` · Earth · Equipment development

Source: [published record](https://www.zeniteclipse.com/ZENIT_Equipment#airwatch)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Calibration and measured observations

**Next step:** Compare the proposed particle sensors with a traceable reference across declared local conditions; record weather, missing samples and uncertainty before any monitoring-performance claim.

**Source evidence boundary in release 278:** Development proposal. Sensor calibration, weather effects and data completeness must be evaluated; this is not a certified safety alarm or regulatory monitor.

### SERAT HeatPod

ID: `equipment-heatpod` · Earth · Equipment development

Source: [published record](https://www.zeniteclipse.com/ZENIT_Equipment#heatpod)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Measured bench evidence

**Next step:** Specify actual source and useful-demand temperatures, storage medium, losses and rejection path; compare matched useful service and matched inventories with calibrated heat/electrical measurements.

**Source evidence boundary in release 278:** Development proposal. The heat source, storage medium, useful demand, losses and rejection path must be defined. No capacity, saving or recovery efficiency is established.

### SafeSpot Pack

ID: `equipment-safespot` · Earth · Equipment development

Source: [published record](https://www.zeniteclipse.com/ZENIT_Equipment#safespot)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Measured service evidence

**Next step:** Define the kit’s actual essential loads and intended duration, then measure battery/output and auxiliary demand under that profile. Keep all endurance ratings open until supported.

**Source evidence boundary in release 278:** Development proposal. Load limits and endurance are not rated. The model does not establish emergency-service qualification or replace an approved emergency plan.

### Atlas Series EVA Suit

ID: `equipment-atlas-eva` · Space · Equipment development

Source: [published record](https://www.zeniteclipse.com/ZENIT_Equipment#atlas-eva)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent life-support qualification

**Next step:** Turn the illustration into a traceable suit and interface requirements record; independent engineering evidence is needed for pressure, life support, mobility, communications and anchor use.

**Source evidence boundary in release 278:** Refined concept illustration preserving the original design. Suit ratings and operational capability require engineering validation.

### Shipboard Outfit

ID: `equipment-shipboard-outfit` · Space · Equipment development

Source: [published record](https://www.zeniteclipse.com/ZENIT_Equipment#shipboard-outfit)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Material and usability evidence

**Next step:** Define the textile, belt, posture and sole functions separately; compare prototypes with ordinary clothing on declared tasks before assigning adaptive or ergonomic benefits.

**Source evidence boundary in release 278:** Refined concept illustration preserving the original design. Adaptive textile, posture and sole functions remain development proposals.

### Magnet conductor & architecture

ID: `gate-g1` · Earth · Open qualification gate

Source: [published record](https://www.zeniteclipse.com/#project/gate-G1)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** External qualification decision

**Next step:** Choose HTS, LTS or a hybrid reference route. Required record: Traceable trade study, limits, joints, protection and an explicit fallback. Decision point: Before the qualification design basis is frozen. The source gate remains not assessed; no permission or booking is claimed.

**Source evidence boundary in release 278:** The source-controlled gate remains open until its required evidence and acceptance decision are recorded.

### Dual-source strategy

ID: `gate-g2` · Earth · Open qualification gate

Source: [published record](https://www.zeniteclipse.com/#project/gate-G2)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** External qualification decision

**Next step:** Approve primary and alternative critical sources. Required record: Sample quality, capacity, lead time, independence and contractual fallback. Decision point: Before supplier down-selection. The source gate remains not assessed; no permission or booking is claimed.

**Source evidence boundary in release 278:** The source-controlled gate remains open until its required evidence and acceptance decision are recorded.

### Magnet tests & slots

ID: `gate-g3` · Earth · Open qualification gate

Source: [published record](https://www.zeniteclipse.com/#project/gate-G3)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** External qualification decision

**Next step:** Select facilities and reserve the required test sequence. Required record: Test matrix, specimen envelope, acceptance, booking and fallback. Decision point: Before detailed coil release. The source gate remains not assessed; no permission or booking is claimed.

**Source evidence boundary in release 278:** The source-controlled gate remains open until its required evidence and acceptance decision are recorded.

### Quench detection & protection

ID: `gate-g4` · Earth · Open qualification gate

Source: [published record](https://www.zeniteclipse.com/#project/gate-G4)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** External qualification decision

**Next step:** Approve detection, energy extraction and fault-insertion concept. Required record: Model-coil data, latency, redundant sensing and thermal/mechanical margin. Decision point: Before energized full-current model-coil work. The source gate remains not assessed; no permission or booking is claimed.

**Source evidence boundary in release 278:** The source-controlled gate remains open until its required evidence and acceptance decision are recorded.

### Norwegian tritium licensing basis

ID: `gate-g5` · Earth · Open qualification gate

Source: [published record](https://www.zeniteclipse.com/#project/gate-G5)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** External qualification decision

**Next step:** Resolve classification and required permissions with DSA / ZSA. Required record: Inventory, boundaries, waste, transport, emergency response and responsibilities. Decision point: Before site and fuel-cycle layout freeze. The source gate remains not assessed; no permission or booking is claimed.

**Source evidence boundary in release 278:** The source-controlled gate remains open until its required evidence and acceptance decision are recorded.

### Licensed tritium test access

ID: `gate-g6` · Earth · Open qualification gate

Source: [published record](https://www.zeniteclipse.com/#project/gate-G6)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** External qualification decision

**Next step:** Select a primary route and fallback. Required record: Written scope, inventory allowance, slot, transport, IP, waste and cost. Decision point: Before tritium-facing procurement. The source gate remains not assessed; no permission or booking is claimed.

**Source evidence boundary in release 278:** The source-controlled gate remains open until its required evidence and acceptance decision are recorded.

### Tritium accountancy & analysis

ID: `gate-g7` · Earth · Open qualification gate

Source: [published record](https://www.zeniteclipse.com/#project/gate-G7)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** External qualification decision

**Next step:** Approve the measurement and material-balance chain. Required record: Range, uncertainty, calibration, latency, data integrity and recovery. Decision point: Before process-control and safety-case freeze. The source gate remains not assessed; no permission or booking is claimed.

**Source evidence boundary in release 278:** The source-controlled gate remains open until its required evidence and acceptance decision are recorded.

### Integrated fuel-cycle demonstration

ID: `gate-g8` · Earth · Open qualification gate

Source: [published record](https://www.zeniteclipse.com/#project/gate-G8)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** External qualification decision

**Next step:** Approve staged evidence from components to integrated tests. Required record: Fuelling, guiding, separation, pumping, accountancy and off-normal tests. Decision point: Before integrated fuel-cycle design freeze. The source gate remains not assessed; no permission or booking is claimed.

**Source evidence boundary in release 278:** The source-controlled gate remains open until its required evidence and acceptance decision are recorded.

### Neutron & materials qualification

ID: `gate-g9` · Earth · Open qualification gate

Source: [published record](https://www.zeniteclipse.com/#project/gate-G9)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** External qualification decision

**Next step:** Approve irradiation and post-irradiation examination plan. Required record: Spectrum, dose, temperature, load and correlation to lifetime models. Decision point: Before materials and shielding basis freeze. The source gate remains not assessed; no permission or booking is claimed.

**Source evidence boundary in release 278:** The source-controlled gate remains open until its required evidence and acceptance decision are recorded.

### Norwegian industrial capability

ID: `gate-g10` · Earth · Open qualification gate

Source: [published record](https://www.zeniteclipse.com/#project/gate-G10)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** External qualification decision

**Next step:** Decide which critical capabilities to establish in Norway. Required record: RFI results, make/buy, expertise, security, investment and schedule. Decision point: Before procurement-strategy approval. The source gate remains not assessed; no permission or booking is claimed.

**Source evidence boundary in release 278:** The source-controlled gate remains open until its required evidence and acceptance decision are recorded.

### Feros · research evidence

ID: `combat-feros` · Earth · Concept evidence

Source: [published record](https://www.zeniteclipse.com/ZENIT_Earth_Combat#feros-engine)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Configuration evidence review

**Next step:** Reconcile the existing register with Feros R6: 48 crew, three decks, one source, two propellers, 12,000 kW total shaft target, 14 normal days and 72 additional emergency hours. Equipment capacities, actual consumption and independent acceptance remain unrecorded.

**Source evidence boundary in release 278:** The concept brief and illustrations are available. Vessel-specific physical ratings and qualification remain unresolved.

### Airos · research evidence

ID: `combat-airos` · Earth · Concept evidence

Source: [published record](https://www.zeniteclipse.com/ZENIT_Earth_Combat#airos-engine)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Configuration evidence review

**Next step:** Retain the existing hydrogen-combustion and generator/SERAT concept and its fictional walkthrough scope. Catalogue missing configuration evidence; no aircraft ratings or operational capability can be assigned from those walkthroughs.

**Source evidence boundary in release 278:** The concept brief and illustrations are available. Vessel-specific physical ratings and qualification remain unresolved.

### Battle Drones · research evidence

ID: `combat-drones` · Earth · Concept evidence

Source: [published record](https://www.zeniteclipse.com/ZENIT_Earth_Combat#drones-engine)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Configuration evidence review

**Next step:** Preserve the current unscaled R2 illustration and its individual battery/enclosed-fan/shield concept. Record the missing physical evidence separately from published graphics; no performance or combat-readiness rating is established.

**Source evidence boundary in release 278:** The concept brief and illustrations are available. Vessel-specific physical ratings and qualification remain unresolved.

### Next research · Outverse Shield architecture

ID: `evolution-outverse-architecture` · Shared · Published development question

Source: [published record](https://www.zeniteclipse.com/ZENIT_Evolutionary_Technology#outverse-architecture)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Next evidence from published development

**Next step:** Characterise each proposed interaction on an instrumented bench, then close force, energy and thermal accounts before assigning a physical protection rating.

**Source evidence boundary in release 278:** The architecture and offline software reference cover resource conflicts, sensor quality, coil faults and synthetic feedback. They do not demonstrate a physical field shield or protective effectiveness. The Space Outverse five-layer / 25-region arrangement is separate from the Earth reactor's five-layer GENI Inverse model. CMC provides a reference; it is not an energy source.

### Next research · Adaptive Descent and Landing Interface

ID: `evolution-adaptive-descent` · Shared · Published development question

Source: [published record](https://www.zeniteclipse.com/ZENIT_Evolutionary_Technology#adaptive-descent)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Next evidence from published development

**Next step:** Use recovered reference geometry and establish actual mass/CG, entry loads, heating and actuator limits. Account for shield-induced airflow changes, then qualify the final approach and mechanical handover separately.

**Source evidence boundary in release 278:** Low-fidelity descent studies and an interface model explore the sequence. No complete vessel descent, atmospheric qualification or field-assisted landing has been demonstrated. Entry energy must be managed before final base capture. The proposed field interaction has no verified force rating; mechanical support and an abort path remain necessary.

### Next research · SERAT Heat-Service and HeatPod

ID: `evolution-heat-service-heatpod` · Shared · Published development question

Source: [published record](https://www.zeniteclipse.com/ZENIT_Evolutionary_Technology#heat-service-heatpod)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Next evidence from published development

**Next step:** Use actual source and customer temperature maps on a metered thermal bench, comparing equal useful service and equal initial and final storage.

**Source evidence boundary in release 278:** A working offline reference prototype accounts for heat, electricity, storage and unmet demand using synthetic inputs. HeatPod remains an equipment concept; measured installation savings are not established. Useful heat, losses, auxiliaries and changes in stored energy all enter the account. Loss of customer demand must leave a separate rejection or derating path available.

### Next research · Outverse Diagnostic Hull Panel

ID: `evolution-diagnostic-hull-panel` · Shared · Published development question

Source: [published record](https://www.zeniteclipse.com/ZENIT_Evolutionary_Technology#diagnostic-hull-panel)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Next evidence from published development

**Next step:** Calibrate a real material coupon across temperature and load, then compare blinded event locations with independent measurements and inspection.

**Source evidence boundary in release 278:** In the selected synthetic cases, all twenty deliberately biased timing cases remain uncertain. A fitted position or an anomaly does not confirm damage or a successful shield interception. The reference uses a two-dimensional panel and one isotropic wave speed. Missing, stale or poorly calibrated readings must remain unassessed or uncertain.

### Next research · Joint Power and Thermal Reserve Scheduler

ID: `evolution-joint-reserve-scheduler` · Shared · Published development question

Source: [published record](https://www.zeniteclipse.com/ZENIT_Evolutionary_Technology#joint-reserve-scheduler)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Next evidence from published development

**Next step:** Replay measured equipment traces in shadow mode, including cooling loss, delayed reports and competing reservations, before an isolated controller bench.

**Source evidence boundary in release 278:** The offline prototype rejects the reference high-heat load even though electrical power alone fits. Selected synthetic cases also expose essential-capacity shortfalls. This is an advisory model using fixed time slots and a conservative thermal approximation. It has no actuator connection or demonstrated survival capability.

### Next research · CMC Independent Reference Witness

ID: `evolution-cmc-reference-witness` · Shared · Published development question

Source: [published record](https://www.zeniteclipse.com/ZENIT_Evolutionary_Technology#cmc-reference-witness)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Next evidence from published development

**Next step:** Verify separate power, timing and data dependencies, then introduce known timing and reference faults on an isolated bench and retain every disagreement.

**Source evidence boundary in release 278:** Two hundred selected agreement and fault cases produce the expected advisory states in the offline prototype. The declared independence of the witnesses has not been physically verified. CMC remains separate from the fusion reactor. A planning HOLD does not disable independent local protection; AXIOM retains final physical authority.

### What qualifies as an equilibrium lock?

ID: `space-review-valley-lock` · Space · Evidence limit

Source: [published record](https://www.zeniteclipse.com/ZENIT_Space_Systems_Research_Report#valley-lock)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent physical observation

**Next step:** Define the response and units and independently measure its response to bounded disturbance; distinguish a restoring equilibrium from a maximum or plateau with the same near-zero derivative.

**Source evidence boundary in release 278:** The slides supply a candidate lock rule. A measured restoring response and independent confirmation are still needed before it can support an operating decision.

### Measure protection for each hazard

ID: `space-review-shield-score` · Space · Unverified hypothesis

Source: [published record](https://www.zeniteclipse.com/ZENIT_Space_Systems_Research_Report#shield-score)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Hazard-specific physical evidence

**Next step:** Replace no measurements with an uncalibrated score: define each hazard and measure the relevant flux, residual dose or heat load with uncertainty at representative locations. A single detector cannot establish crew protection.

**Source evidence boundary in release 278:** The score has no calibrated relationship to protection. CORAC’s published example found 0.24% more protons at one detector in its steady-field simulation. A single detector cannot establish a crew dose.

### Where the recovered energy goes

ID: `space-review-heat-recovery` · Space · Unverified hypothesis

Source: [published record](https://www.zeniteclipse.com/ZENIT_Space_Systems_Research_Report#heat-recovery)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Measured bench evidence

**Next step:** Define the recovery fraction’s input/output boundary and interval; meter full-duty useful output, auxiliaries, stored-energy change and rejected heat before assigning a sustained recovery percentage.

**Source evidence boundary in release 278:** In Trell’s one-second reference circuit, each route delivered 0.3230 J, while the inductive route drew 0.6461 J more from the source. That comparison measures an electrical cost in one model. A sustained operating balance requires a full duty cycle and metered losses.

### A common reference and a new message

ID: `space-review-signal-delay` · Space · Evidence limit

Source: [published record](https://www.zeniteclipse.com/ZENIT_Space_Systems_Research_Report#signal-delay)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent physical observation

**Next step:** Use a blinded choice made after synchronization, preserve independent timestamps and account for ordinary signal paths; demonstrate receipt of new information rather than a prearranged schedule.

**Source evidence boundary in release 278:** Distance-independent delivery through a shared field remains a ZENIT hypothesis without a demonstrated channel. A blinded choice made after synchronization, with ordinary signal paths controlled and timestamps preserved, would distinguish a new message from a predictable schedule.

### An equilibrium candidate with independent witnesses

ID: `connected-lock-witness` · Shared · Proposed bench acceptance plan

Source: [published record](https://www.zeniteclipse.com/ZENIT_Connected_Research#lock-witness)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent bench or exposure evidence

**Next step:** Define R, its units, the controlled variable and a bounded laboratory disturbance. Predeclare a settling band, observation interval, repeatability rule and independent witness checks appropriate to that apparatus. Compare minima, maxima and plateaus, then assess restoring behavior. No numerical hardware thresholds are assigned here.

**Source evidence boundary in release 278:** Define R, its units, the controlled variable and a bounded laboratory disturbance. Predeclare a settling band, observation interval, repeatability rule and independent witness checks appropriate to that apparatus. Compare minima, maxima and plateaus, then assess restoring behavior. No numerical hardware thresholds are assigned here.

### Field studies, hull water and occupied spaces

ID: `connected-occupied-exposure` · Space · Proposed exposure assessment plan

Source: [published record](https://www.zeniteclipse.com/ZENIT_Connected_Research#occupied-exposure)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Independent bench or exposure evidence

**Next step:** Define the incident particle spectrum, geometry, material areal density, exposure interval and calibrated detector response. Include relevant secondary particles and uncertainty. Compare matched calculations and then qualified measurements at occupied locations. CORAC’s single-detector proton-count example and the uncalibrated GENI score establish no crew-dose reduction.

**Source evidence boundary in release 278:** Define the incident particle spectrum, geometry, material areal density, exposure interval and calibrated detector response. Include relevant secondary particles and uncertainty. Compare matched calculations and then qualified measurements at occupied locations. CORAC’s single-detector proton-count example and the uncalibrated GENI score establish no crew-dose reduction.

### Verify the receiving interface for each host

ID: `fleet-research-host-fit` · Space · Open engineering check

Source: [published record](https://www.zeniteclipse.com/ZENIT_Qi_Fleet_Research#host-fit)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Vessel-specific interface or physical evidence

**Next step:** Fronak’s cutaway sends a sealed canister out through a two-boundary lock. The adopted Trell operation uses external docking and sends the sealed canister inward. Anorak’s existing model sends an equipment pallet to a receiving fixture. The public models establish layouts and transfer order. No Trell–host pair in this register has a qualified physical interface.

**Source evidence boundary in release 278:** The public models establish layouts and transfer order. No Trell–host pair in this register has a qualified physical interface.

### Qualify cold storage and sample acceptance

ID: `fleet-research-cold-reserve` · Space · Open engineering check

Source: [published record](https://www.zeniteclipse.com/ZENIT_Qi_Fleet_Research#cold-reserve)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Vessel-specific interface or physical evidence

**Next step:** The CORAC procedure holds onward transfer when acceptance evidence is incomplete and routes a known seal failure or temperature excursion to quarantine. Trell’s recovered design includes science and cargo space. Trell’s refrigeration capacity, permitted duration and specimen-specific limits are open. The tabletop cases use condition labels and assume no numerical limits.

**Source evidence boundary in release 278:** Trell’s refrigeration capacity, permitted duration and specimen-specific limits are open. The tabletop cases use condition labels and assume no numerical limits.

### Anorak · Equipment supply

ID: `fleet-research-role-anorak` · Space · Proposed operation

Source: [published record](https://www.zeniteclipse.com/ZENIT_Qi_Fleet_Research#role-anorak)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Vessel-specific interface or physical evidence

**Next step:** Use Trell as the proposed receiver for a replacement instrument pallet. Check the loaded pallet against Trell’s hatch, guides and restraints. Obtain independent receiving-fixture confirmation before release.

**Source evidence boundary in release 278:** Check the loaded pallet against Trell’s hatch, guides and restraints. Obtain independent receiving-fixture confirmation before release.

### Centri · Readiness and recovery

ID: `fleet-research-role-centri` · Space · Proposed operation

Source: [published record](https://www.zeniteclipse.com/ZENIT_Qi_Fleet_Research#role-centri)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Vessel-specific interface or physical evidence

**Next step:** Compare the visitor’s and host’s timestamped accounts when a receipt is late or conflicts. Keep the original movement under its original ID. Reconcile the two local observations and refer conflicts to their operators. Coordination alone cannot confirm physical capture or custody.

**Source evidence boundary in release 278:** Reconcile the two local observations and refer conflicts to their operators. Coordination alone cannot confirm physical capture or custody.

### Zorak · Medical handover

ID: `fleet-research-role-zorak` · Space · Proposed operation

Source: [published record](https://www.zeniteclipse.com/ZENIT_Qi_Fleet_Research#role-zorak)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Vessel-specific interface or physical evidence

**Next step:** Study Trell as the sending vessel for a crew handover through that shuttle. Verify both interfaces, route clearance and receiving-team availability. The medical team accepts the handover.

**Source evidence boundary in release 278:** Verify both interfaces, route clearance and receiving-team availability. The medical team accepts the handover.

### Ranok · Reserve research

ID: `fleet-research-role-ranok` · Space · Proposed operation

Source: [published record](https://www.zeniteclipse.com/ZENIT_Qi_Fleet_Research#role-ranok)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Vessel-specific interface or physical evidence

**Next step:** Retain Ranok as a candidate alternate receiving laboratory if Fronak is unavailable. Obtain host acceptance, port geometry, isolation and storage evidence before assigning a diversion.

**Source evidence boundary in release 278:** Obtain host acceptance, port geometry, isolation and storage evidence before assigning a diversion.

### CORAC · Lunar sample origin

ID: `fleet-research-role-corac` · Space · Proposed operation

Source: [published record](https://www.zeniteclipse.com/ZENIT_Qi_Fleet_Research#role-corac)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Vessel-specific interface or physical evidence

**Next step:** Deliver selected sealed samples to Trell in orbit through a separate, compatible surface-to-orbit craft. Qualify that first handoff and preserve custody through every leg. Trell’s proposed role begins in orbit.

**Source evidence boundary in release 278:** Qualify that first handoff and preserve custody through every leg. Trell’s proposed role begins in orbit.

### Atlas · Survey choices

ID: `fleet-research-role-atlas` · Space · Proposed operation

Source: [published record](https://www.zeniteclipse.com/ZENIT_Qi_Fleet_Research#role-atlas)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Vessel-specific interface or physical evidence

**Next step:** Compare a second drone observation with returning the first sample to Trell. Define the observation window, drone reserve and sample storage deadline before scheduling another pass.

**Source evidence boundary in release 278:** Define the observation window, drone reserve and sample storage deadline before scheduling another pass.

### SERAT · Science load scheduling

ID: `fleet-research-role-serat` · Space · Proposed operation

Source: [published record](https://www.zeniteclipse.com/ZENIT_Qi_Fleet_Research#role-serat)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Vessel-specific interface or physical evidence

**Next step:** Delay optional sample analysis when cooling is scarce. Preserve crew services and the proposed sample store within demonstrated capacity. Meter source demand, delivered load, temperature history and actual cooling margin for the same interval.

**Source evidence boundary in release 278:** Meter source demand, delivered load, temperature history and actual cooling margin for the same interval.

### Qi Fleet design qualification

ID: `fleet-research-qi-fleet-redesign-qualification` · Space · Open physical qualification

Source: [published record](https://www.zeniteclipse.com/ZENIT_Qi_Fleet_Designs#qualification)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Vessel-specific interface or physical evidence

**Next step:** Verify propulsion, structural loads, cooling, shielding and planetary flight by vessel. Per-vessel and formation evidence remains open under the ZENIT Safety Authority.

**Source evidence boundary in release 278:** Per-vessel and formation evidence remains open under the ZENIT Safety Authority.

### KETS validation by vessel

ID: `fleet-research-kets-qualification` · Space · Open physical qualification

Source: [published record](https://www.zeniteclipse.com/ZENIT_Qi_Fleet_Research#kets-motion)

**Work completed:** Reviewed the published source, retained its evidence boundary, and recorded a specific next evidence step. This is a desktop review, not execution of the outstanding physical or independent work.

**Evidence needed:** Vessel-specific interface or physical evidence

**Next step:** Measure available charged-particle power, auxiliary demand, thermal limits and net gain on each candidate hull. Validate independent KCS cooling, hardware bypass and preservation of protected loads on each vessel.

**Source evidence boundary in release 278:** Validate independent KCS cooling, hardware bypass and preservation of protected loads on each vessel.

### A neighbourhood that remembers heat

ID: `unexplored-heat-memory` · Earth · Unexplored research proposal

Source: [published record](https://www.zeniteclipse.com/ZENIT_Unexplored#heat-memory)

**Work completed:** Completed a bounded initial synthetic reference exercise, with reproducible inputs, results and checks. Human, observational and physical follow-up remain open.

**Evidence needed:** Measured bench evidence

**Next step:** Use actual source/customer temperatures, demand traces, storage characteristics, auxiliary electricity and losses to replace ideal inputs; compare matched useful duty and matched inventories before claiming a benefit.

**Source evidence boundary in release 278:** A new proposed direction. Its first study has not been carried out. Heat sharing and storage are the proposed subject. No new source of energy or measured ZENIT saving is claimed.

### A habitat that can explain itself

ID: `unexplored-readable-habitat` · Shared · Unexplored research proposal

Source: [published record](https://www.zeniteclipse.com/ZENIT_Unexplored#readable-habitat)

**Work completed:** Completed a bounded initial synthetic reference exercise, with reproducible inputs, results and checks. Human, observational and physical follow-up remain open.

**Evidence needed:** Independent review and usability

**Next step:** Freeze a withheld nonpersonal log set, compare conventional logs with explanations using actual participants and independent review, and retain missed changes and incorrect explanations.

**Source evidence boundary in release 278:** A new proposed direction. Its first study has not been carried out. This is a proposed observation and explanation study. It supplies no autonomous safety authority or demonstrated habitat capability.

### Gardens between worlds

ID: `unexplored-gardens-between-worlds` · Shared · Unexplored research proposal

Source: [published record](https://www.zeniteclipse.com/ZENIT_Unexplored#gardens-between-worlds)

**Work completed:** Completed a bounded initial synthetic reference exercise, with reproducible inputs, results and checks. Human, observational and physical follow-up remain open.

**Evidence needed:** Measured biological observations

**Next step:** Choose a bounded observational garden and record actual conditions, water, electricity and plant outcomes. Test any food, oxygen or wellbeing claim separately.

**Source evidence boundary in release 278:** A new proposed direction. Its first study has not been carried out. The garden is a new research proposal. It is not counted as an established oxygen source or a replacement for life-support equipment.

### An atlas of the unfamiliar

ID: `unexplored-unfamiliar-atlas` · Space · Unexplored research proposal

Source: [published record](https://www.zeniteclipse.com/ZENIT_Unexplored#unfamiliar-atlas)

**Work completed:** Completed a bounded initial synthetic reference exercise, with reproducible inputs, results and checks. Human, observational and physical follow-up remain open.

**Evidence needed:** Independent review and observations

**Next step:** Use withheld observations and fault labels reviewed independently, compare the interfaces, and seek repeatable independently confirmed observations before a discovery claim.

**Source evidence boundary in release 278:** A new proposed direction. Its first study has not been carried out. This proposal concerns scientific observation and evidence. No new phenomenon, mission result or automatic discovery capability is established.

### Materials with a life story

ID: `unexplored-material-journals` · Shared · Unexplored research proposal

Source: [published record](https://www.zeniteclipse.com/ZENIT_Unexplored#material-journals)

**Work completed:** Completed a bounded initial synthetic reference exercise, with reproducible inputs, results and checks. Human, observational and physical follow-up remain open.

**Evidence needed:** Calibration and independent inspection

**Next step:** Obtain real material calibration and independent inspection outcomes; compare interpretation with and without history and retain residuals as questions rather than diagnoses.

**Source evidence boundary in release 278:** A new proposed direction. Its first study has not been carried out. The proposed result is a research record and interpretation study. No material-life extension or new structural rating is claimed.

### A home before a home

ID: `unexplored-home-before-home` · Space · Unexplored research proposal

Source: [published record](https://www.zeniteclipse.com/ZENIT_Unexplored#home-before-home)

**Work completed:** Completed a bounded initial synthetic reference exercise, with reproducible inputs, results and checks. Human, observational and physical follow-up remain open.

**Evidence needed:** Independent review and usability

**Next step:** Turn the reference room graph into a dimensioned civilian walkthrough and run recorded participant maintenance/service-loss tasks with independent interpretation. Structural and life-support qualification stay separate.

**Source evidence boundary in release 278:** A new proposed direction. Its first study has not been carried out. This is a proposal for learning from a virtual environment. It establishes no construction-ready settlement or physical survival capability.

### The coastal commons

ID: `unexplored-coastal-commons` · Earth · Unexplored research proposal

Source: [published record](https://www.zeniteclipse.com/ZENIT_Unexplored#coastal-commons)

**Work completed:** Completed a bounded initial synthetic reference exercise, with reproducible inputs, results and checks. Human, observational and physical follow-up remain open.

**Evidence needed:** Site evidence and usability

**Next step:** Replace the fictional budget with locally reviewed site records and measured services; compare map and list comprehension with participants and retain unmodelled heating/water/continuity questions.

**Source evidence boundary in release 278:** A new proposed direction. Its first study has not been carried out. The coastal setting is illustrative. No real town, installed network or emergency-service capacity is claimed.

### Current cartography

ID: `unexplored-current-cartography` · Space · Unexplored research proposal

Source: [published record](https://www.zeniteclipse.com/ZENIT_Unexplored#current-cartography)

**Work completed:** Completed a bounded initial synthetic reference exercise, with reproducible inputs, results and checks. Human, observational and physical follow-up remain open.

**Evidence needed:** Independent physical observation

**Next step:** Obtain passive records with independent instrument, timing and processing provenance; predeclare artifact comparisons and independent repeatability checks before claiming an environmental signature.

**Source evidence boundary in release 278:** A new proposed direction. Its first study has not been carried out. Frequency Travel remains a research hypothesis. This new observation proposal adds no validated travel mechanism or movement capability.

## Provenance and limits

Source release: 278. Source commit: `67892137adec454e46974526967c2cb9d57cf430`.

This review uses the project’s own published records. It introduces no external-study endorsement, hardware rating, clinical result or patent-law conclusion. The MDI-1 Space Claims publication hold remains unchanged.

GENI retains its current name; CMC is a reference rather than a primary energy source. The vessel shield baseline remains five layers × five sectors (25 regions). Interceptors and wingless shuttles remain space-only; Norak and Marak retain separately qualified Earth-capable concept roles.
