ZENITSimulation · 23 November 2026

Zorak’s KETS propulsion trial

The trial held fusion output at 213.19 MW with one main radiator sector out. It ramped up KETS diversion on Fusion A, then Fusion B, held 10 MW combined for two minutes and returned both KETS branches to bypass in sequence. The simulated run assumes that the diverted particles were surplus to plasma heating and that both KCS banks were ready at startup.

Thrust at full pulse
1,086 N
Peak main-loop heat
186.62 MW
Peak heat stored in either buffer
0 MJ

Replay the pulse and bypass

One-second snapshots from the transient model. Peak figures in the report use the full calculation.

Both branches at full diversion

On the normal run, both branches reach 5 megawatts by 20 seconds and return to zero by 160 seconds. Main-loop heat stays below the R4 limit.
Green shading marks the scheduled full-power interval. Amber marks the planned return to bypass.
KETS A / B diversion
5.00 / 5.00 MW
Combined thrust
1,086 N
Main-loop heat
181.81 MW
Net electrical bus
67.51 MW
KCS A / B heat load
1.55 / 1.55 MW
Heat stored in buffer A / B
0.00 / 0.00 MJ

Trial outcomes

CaseOutcome in the simulation
Planned pulse1,086 N at full pulse, versus 1,028 N in the bypass reference with KCS pumps off. Thrust rose 5.65%. Peak main-loop heat was 186.62 MW against a 193.82 MW limit after reserve, leaving 7.20 MW of headroom. KETS reached bypass at 160 s. During handover, thrust dipped to 1,015 N as the modeled conventional heat path caught up. Both converters reached the cooldown marker by 170.8 s.
Fusion A spare bank lost at 60 sA went to bypass. Its primary radiator stayed available and the buffer absorbed 0.58 MJ at peak. A reached its cooldown marker at 75 s. B finished the pulse with thrust near 1,056 N after the electrical handover.
Warmer crew-cooling caseHOLD before KETS startup. The available crew train rejects 1.24 MW against a 1.33 MW demand, about 95 kW short.
Full plasma reheating at 10 MWThe heater would draw 12.50 MW and the modeled net bus would be 55.01 MW, below the 63.96 MW bypass reference. This screening case fails the net electrical gain check.

What the transient model assumes

References

Read the later ZENIT research note on Zorak’s modeled speed gain

The alpha particle behind KETS