Zorak’s KETS propulsion trial
The trial held fusion output at 213.19 MW with one main radiator sector out. It ramped up KETS diversion on Fusion A, then Fusion B, held 10 MW combined for two minutes and returned both KETS branches to bypass in sequence. The simulated run assumes that the diverted particles were surplus to plasma heating and that both KCS banks were ready at startup.
- Thrust at full pulse
- 1,086 N
- Peak main-loop heat
- 186.62 MW
- Peak heat stored in either buffer
- 0 MJ
Replay the pulse and bypass
One-second snapshots from the transient model. Peak figures in the report use the full calculation.
Both branches at full diversion
- KETS A / B diversion
- 5.00 / 5.00 MW
- Combined thrust
- 1,086 N
- Main-loop heat
- 181.81 MW
- Net electrical bus
- 67.51 MW
- KCS A / B heat load
- 1.55 / 1.55 MW
- Heat stored in buffer A / B
- 0.00 / 0.00 MJ
Trial outcomes
| Case | Outcome in the simulation |
|---|---|
| Planned pulse | 1,086 N at full pulse, versus 1,028 N in the bypass reference with KCS pumps off. Thrust rose 5.65%. Peak main-loop heat was 186.62 MW against a 193.82 MW limit after reserve, leaving 7.20 MW of headroom. KETS reached bypass at 160 s. During handover, thrust dipped to 1,015 N as the modeled conventional heat path caught up. Both converters reached the cooldown marker by 170.8 s. |
| Fusion A spare bank lost at 60 s | A went to bypass. Its primary radiator stayed available and the buffer absorbed 0.58 MJ at peak. A reached its cooldown marker at 75 s. B finished the pulse with thrust near 1,056 N after the electrical handover. |
| Warmer crew-cooling case | HOLD before KETS startup. The available crew train rejects 1.24 MW against a 1.33 MW demand, about 95 kW short. |
| Full plasma reheating at 10 MW | The heater would draw 12.50 MW and the modeled net bus would be 55.01 MW, below the 63.96 MW bypass reference. This screening case fails the net electrical gain check. |
What the transient model assumes
- Each branch ramps over 10 seconds. Each KCS loop has a 1.00 MW primary bank, a 0.55 MW spare bank and 100 MJ of usable buffer capacity. Bank ratings are net after reserve. The model charges 50 kW per branch to the bus for circulation and adds it to that loop’s heat.
- Separate KCS radiators reject converter heat. Electrical delivery losses remain on the main loop. The integration checks fusion input against stored heat, rejected heat, crew electricity and exhaust energy at each step.
- The conventional heat path and the converter’s heat release each use an assumed five-second response time. Varying both assumed responses from 3 to 15 seconds gave 0.35 to 1.53 MJ of buffer draw in the spare-bank failure.
- The cooldown marker means residual converter heat release has dropped to 5% of its full-load value and its buffer is discharged. Circulation continues through the replay. A measured cooldown requires converter and heat-exchanger temperatures, verified flow and evidence that the buffer is ready for another pulse.
References
Read the later ZENIT research note on Zorak’s modeled speed gain
The alpha particle behind KETS
- ZENIT · Zorak’s steady-state KCS rerun. Related public steady-state comparison
- NASA · Spacecraft thermal storage and heat rejection
- ITER · Burning-plasma self-heating