ZENIT research ·
KETS Field
How much forward motion does Zorak gain from one KETS boost once the ship has powered its engines and cooled both converters?
In the flagship’s design, the Kinetic Energy Transfer System (KETS) recovers energy from charged fusion particles. Electricity travels to the stern drives, which accelerate onboard propellant through the original twin nozzles.
One boost aboard Zorak
Zorak’s current reference is one on-demand command. Wing A begins recovery at the command, wing B joins ten seconds later, and both finish within 180 seconds. The ordinary engines keep running through cooldown. Another boost requires a fresh command.
In the reference run with a 35°C coolant inlet and unrestricted recovery, the boost added 1,828 N·s of forward impulse by five minutes compared with the same engines in bypass at the same propellant flow. Impulse is thrust accumulated over time. For Zorak and its docked load of 900,000 tonnes in total, this amounts to 2.03 micrometres per second of extra speed.
How much of Zorak’s boost does cooling preserve?
Zorak’s SERAT grid supplies a 50 kW cooling pump on each wing in the model. The temperature controller reduces recovery on both wings when either converter approaches its target. Pre-cooling might allow more recovery, but it also takes electricity from the drives and adds heat to the radiators.
Does pre-cooling pay for itself?
The 35°C inlet delivered 1,412 N·s of extra forward impulse. Actively chilling the inlet to 27.5°C delivered 413 N·s at an assumed chiller coefficient of performance (COP) of 6. At that setting the chiller moves six units of heat per unit of electricity. Both gains are relative to ordinary propulsion at the same propellant flow.
Both simulations start with the coolant and converters at 35°C and the same battery charge. The colder run uses 60 seconds of grid power to prepare. The 35°C case can boost immediately and waits through the same minute for comparison. Each then fires once for 180 seconds and spends 120 seconds in recovery. At the six-minute mark both loops and converters are back at 35°C. All cooling electricity comes from the propulsion bus. The batteries supply no energy in either run.
| Cooling case | Cooling and recovery electricity | Net impulse relative to bypass |
|---|---|---|
| 35°C inlet | 30.0 MJ | +1,412 N·s |
| 27.5°C inlet · COP 3 | 181.4 MJ | -519 N·s |
| 27.5°C inlet · COP 6 | 123.3 MJ | +413 N·s |
| 27.5°C inlet · COP 12 | 88.2 MJ | +975 N·s |
| 27.5°C inlet · COP 20 | 72.7 MJ | +1,222 N·s |
Where the electricity went and when chilling could break even
At COP 6 the pumps used 36.0 MJ, the chiller used 75.3 MJ and returning the coolant to 35°C used 11.9 MJ of electric heat after crediting residual heat. Both cases protected ship services. Each wing had the same 1.55 MW radiator allowance, including chiller waste heat. As either wing approached a temperature or rejection limit, the controller reduced recovery on both wings.
A separate run used 11.9 MJ of available ship waste heat to bring the coolant back to 35°C. With the electric reheat cost removed, the COP 6 case delivered 557 N·s over bypass. That still falls below the 35°C run. This assumes a heat exchanger can deliver that heat at the required temperature and rate.
The assumed coolant holds 1 MJ of heat per degree per wing. With that inventory and a 35°C hot-side interface, the electrically rewarmed case breaks even near COP 39.4. The ideal limit for lifting heat from 27.5°C to 35°C is 40.1. Halving the assumed coolant inventory lowers break-even to COP 27.8. Doubling it leaves no crossover within that ideal limit. Actual chiller power, coolant inventory and radiator performance still need measurement.
Earlier five-minute comparison at fixed coolant temperatures
These runs each start at the listed inlet temperature. Both pumps draw 100 kW in total throughout the 300 seconds. At a 35°C inlet, unrestricted recovery takes the converter to 72.5°C.
| Coolant inlet | Peak converter temperature | Extra impulse at 300 s |
|---|---|---|
| 35°C, unrestricted | 72.5°C | 1,828 N·s |
| 35°C, 65°C target | 65°C | 1,412 N·s (77.2% retained) |
| 27.5°C, 65°C target | 65°C | 1,828 N·s before additional cooling power |
In this earlier calculation, a constant additional cooling load of 116.6 kW across both wings for 300 seconds would use up the colder inlet’s advantage. That estimate assumes the inlet is already cold. The matched comparison above charges the drives for establishing it.
Could a shorter electrical route help?
Moving the electrical handoff closer to the stern drives produced the same impulse at 95% delivery efficiency. In a separate simulation, raising that efficiency to an assumed 97% added 265 N·s over the unrestricted reference boost. Measuring power at each end of the route would show whether it saves enough energy to produce that gain.
Earlier 50-minute fleet replay
This historical comparison repeated Zorak’s pulse ten times to estimate the thrust required by each major vessel. Each 300-second interval included ramps and cooldown. The fleet’s current operating reference uses the single on-demand command above.
| Formation result | Engines in bypass | Engines with KETS | Difference |
|---|---|---|---|
| Mean axial thrust required | 3,643.59 N | 3,665.12 N | +21.53 N (+0.59%) |
| Speed gained | 3.438023 mm/s | 3.458339 mm/s | 20.316 µm/s |
Both runs start at the same speed and use the same fleet mass. Zorak supplies the simulated acceleration history. The model uses the other nine vessels’ loaded masses to calculate how much thrust each would need to hold formation. Total reference mass is 3,179,380.1 tonnes. Delivered fleet thrust remains unmeasured.
How does KETS compare with Valley Lock and sails?
Valley Lock scans a candidate current, tunes the shields and tracks the formation as it follows the flow. Its physical thrust is unknown. In a separate Zorak wind-assist calculation, a 750 km/s stream at three protons per cubic centimetre adds 1.396 N on average after the shield’s power cost. That case assumes a slow departure, a 25 km added capture radius and sideways deflection. Synchronized KETS adds 6.095 N to Zorak over the same 50 minutes, or 4.37 times the modeled wind contribution. The fleet results above use engine thrust alone.
For a photon sail, thrust depends on the reflecting area, distance from the Sun and orientation. At Earth’s distance, an ideal mirror facing the Sun needs 2.37 km² to match the fleet’s 21.53 N KETS increment, or 403.65 km² to match its full 3,665.12 N engine-force requirement. The sail force in this comparison points away from the Sun. NASA solar-sail pressure reference
KETS article, trials and cycle
Compare the three pulse runs
Follow Zorak’s net electrical power and the heat held in its fullest branch buffer. Each trace ends when that run reaches its modeled cooldown marker.
- Nominal pulse
- Added converter heat
- Branch A spare-bank loss
| Run | Net ship power (MW) | Heat in fullest buffer (MJ) |
|---|---|---|
| Nominal pulse | 67.51 | 0.00 |
| Added converter heat | 66.91 | 4.52 |
| Branch A spare-bank loss | 64.18 | 0.00 |
The replay records whole seconds and each run’s exact cooldown time. At fractional seconds the table shows only readings recorded at that instant.
The replay data pairs each modeled reading with its elapsed time and case.
nominal is the reference pulse, addedHeat adds converter heat,
and lostSpare removes branch A’s spare cooling bank.
From particle energy to ship power
The idea began on Centri on 22 November 2026 with energy recovery from turbines and flywheels. Zorak’s two-core study moved the recovery point upstream. It asked whether some charged particles could deliver electricity before their energy became heat.
In the study’s assumed deuterium–tritium reaction, the alpha particle is an ordinary helium-4 nucleus. It carries about 3.5 MeV, while the neutron carries about 14.1 MeV. As confined alpha particles slow down, they heat the plasma. Drawing energy from them may increase the power the ship needs to supply that heat.
In Zorak’s design, each core has a converter and an independent bypass. Recovered electricity passes through the core’s Local Fuse Chamber, the corresponding central fuse lane and the SERAT power distribution system. The stern drives use the available power to expel propellant. A separate KCS cooling loop carries heat away from each converter.
Earlier Zorak pulse trials
The 23 November simulation held fusion output at 213.19 MW in both runs. At full pulse the two cores diverted 10 MW in total. With 70% conversion and 95% delivery, 6.65 MW reached the bus. The old thermal path lost 3.00 MW of generation and the two cooling pumps used 0.10 MW. That left 3.55 MW of extra electricity if the plasma could spare the diverted energy.
| Mode | Net ship power | What the model predicts |
|---|---|---|
| Bypass | 63.96 MW | The thermal path supplies the bus. Combined drive thrust is about 1,028 N. |
| Recovery with surplus | 67.51 MW | Combined thrust reaches about 1,086 N while both branches are at full pulse. |
| Recovery with full reheating | 55.01 MW | The heater draws 12.50 MW to put 10 MW back into the plasma. The electrical advantage disappears. |
Two runs answer different speed questions
| Run and assumed mass | Starting condition | KETS advantage |
|---|---|---|
| 160 s · 690,000 t | From rest. Both branches run at full power from 20 to 140 s. | About 8,160 N·s of extra impulse, equivalent to 0.0118 mm/s. |
| 180 s · 654,591 t | At the 0.075c formation cruise design target. Both branches run at full power from 20 to 160 s. | 0.01416 mm/s in the Earth departure frame. The active burn adds 0.29528 mm/s and the bypass burn adds 0.28112 mm/s. |
The historical conventional-drive benchmark begins at 9,482.44641 km/h. That number describes the starting motion. Ending diversion leaves the vessel moving. The current MAGTRANS design calls for bypass during a direction change. Its physical braking response remains open.
Cooling also takes time. In the 160-second nominal trial the model reaches its cooldown marker at 170.8 s from first diversion. In the replay where branch A loses its spare cooling bank at 60 s, it returns to bypass and its buffer peaks at 0.58 MJ. The separate 180-second nominal procedure reaches its cooldown marker at 190.8 s.
When does KETS break even?
At full pulse, Zorak diverts 10 MW of particle power. Some of that energy may need to go back into heating the plasma. At fixed fusion output, the model gains 3.55 MW of ship power if none needs replacing. Replacing it all leaves the ship with 8.95 MW less than in bypass. Both figures include 0.10 MW for the two cooling pumps.
Power balance at replacement
- Heater draw
- 2.50 MW
- Ship power versus bypass
- +1.05 MW
At 28.4% replacement, the heater uses the entire electrical gain. Centri’s proposed test would measure how much replacement heating the plasma actually needs.
What the Gen 2 target costs per wing
Gen 2 starts with a design question. How much spare particle power and cooling would one wing need to gain 99.91 MW net? The R1 calculation assumes zero replacement heating and a 50 kW auxiliary load. The R2 calculation asks what happens when the available source or cooling changes.
| Study condition | Result |
|---|---|
| R1 · Full net target | 273.863 MW of particle diversion and 82.209 MW of dedicated heat rejection. If 99.91 MW were simply delivered to the bus, the corresponding net gain would be 54.788 MW. |
| R1 · Earlier cooling allocation | At 1.55 MW of usable rejection, the 100 MJ thermal buffer fills after 7.343 s. Across 6,561 combinations of assumptions, 3,231 yield a positive mathematical solution. The grid assigns no probabilities. |
| R2 · Steady cooling limit | 40 MW of usable rejection supports 48.556 MW net under the assumed source conditions. |
| R2 · Heat after a cooling change | With a five-second heat-release lag, a drop to 40 MW calls for 242.667 MJ of external buffer. A 30-second total cooling loss with diversion isolated calls for 472.695 MJ. Both exceed the assumed 100 MJ. |
Electrical energy still arriving after isolation needs its own account. With a 0.25-second delay and a one-second rundown, R1 calculates 136.589 MJ of gross electrical feed. The thermal buffer holds heat. Neither account establishes a usable onboard battery reserve.
Zorak’s earlier Cooling R4 study sizes the shared main loop. Its one-sector-out case allows 193.82 MW of dispatch at the reference exposure. Gen 2’s 82.209 MW figure describes the dedicated converter loop per wing. Each loop needs evidence for its own load and conditions.
Follow-up cooling-fault comparison
The next question is whether ending particle diversion completely, while maintaining circulation, demands less buffer capacity than continuing at reduced power after a cooling fault. A separate working study examines how sensitive that comparison is to the time it takes the converter to release stored heat.
The power model passed 14 internal checks and the thermal model passed 17. Readers can rerun both calculations and inspect the result files. Physical source power, cooling capacity and drive performance still require measurements.
Where KETS fits in the Qi Fleet
In the Qi-Fleet power grid design, each of the 18 named vessels can isolate either machinery wing. Each wing has its own SERAT supply, KETS recovery, cooling and bypass. Zorak supplies the numerical reference. Each hull still needs its own power budget, cooling limits and qualification.
Ten major vessels fly independently in the modeled formation, including both cruisers and the mobilised reserve vessel. The eight docked interceptors keep their local drives in bypass and contribute no independent thrust. The 11 standard shuttles, four first-aid shuttles and 62 assigned drones are counted with the formation’s carried craft.
The four published transitions cover preparation, staged activation, return to bypass and cooldown. The reference procedure allows up to 180 seconds from first diversion through the final ramp. GENI checks readiness, NEXUS records the run and local AXIOM can end it early. Another pulse needs verified flow, temperature, buffer capacity and fresh clearance.
What Norak and Marak carry into descent
Both cruisers bypass particle diversion for atmospheric flight. In the return study, each wing ends the modeled space pulse with 100.82 MJ of residual converter heat. The immediate question is how to remove it when the space radiators stow.
For a 30-second handover with an initially empty 100 MJ buffer per wing, zero spare cooling fills the buffer at 20.07 s and needs 102.07 MJ by 30 s. Giving the wing 1 MW of spare cooling reduces peak storage to 81.56 MJ. At 5 MW spare the peak is 41.31 MJ. Entry and ship-service loads must already be deducted from that spare cooling.
What a separately powered approach fan could add
The fan comparison assumes that 1 MW of electrical power is available for 30 seconds per cruiser, or 8.33 kWh. It assumes 60% electrical-to-propulsive efficiency and holds other forces fixed.
| Cruiser | Reference approach | Added forward thrust | Equivalent speed gain |
|---|---|---|---|
| Norak | 3,816 t at 386 km/h, survey load | 5.6 kN | 0.16 km/h |
| Marak | 4,500 t at 366 km/h, provisional load | 5.9 kN | 0.14 km/h |
KETS afterburn remains unsolved. No measured KETS thrust or flight-speed change is on record. Both cruisers receive zero extra landing or go-around thrust credit. The fan estimate depends on verifying usable electrical storage after entry and the installed fan’s thrust.
What would change the conclusion?
- Establish the surplus. Compare recovery and bypass at matched fusion output. Measure diverted particle power, changes in plasma heating, heater demand and protected-bus output. Centri is the proposed first test platform.
- Measure electrical delivery. Record power at the converter output and at the stern drive on each wing to establish the route’s actual losses.
- Test the cooling loop under load. Record converter hot spots, coolant inlet and outlet temperatures, flow and all cooling equipment’s electrical draw. Test whether each loop can sustain a 27.5°C inlet while rejecting 1.55 MW, and account for the extra equipment’s waste heat through cooldown. The 65°C controller setting needs a hardware temperature rating.
- Measure forward impulse. Record calibrated axial force over one boost and cooldown and repeat with recovery bypassed at matched propellant flow and ship-service loads. Integrate the force difference and report its uncertainty. Each hull needs its own evidence before ZSA qualification.