Power and cooling
Per-wing account using the saved conversion and auxiliary assumptions.
Waiting to calculate
THE ZENIT PROGRAM / 27 NOVEMBER 2026
Two completed conditional studies of the Gen 2 per-wing target.
The JavaScript has already been run: 14 checks passed for the power account and 17 for the operating envelope. The calculations expose the source and cooling requirements behind the 99.91 MW net target.
KETS CALCULATIONS
The studies run on the server using their saved assumptions. Results appear below. These are conditional numerical studies; physical qualification remains open.
Preparing the calculations…
Per-wing account using the saved conversion and auxiliary assumptions.
Waiting to calculate
Transient rows use a five-second heat-release assumption; the authored cooling faults begin at 60 seconds.
Waiting to calculate
COMPLETED NUMERICAL STUDY / R1
Under the inherited assumptions, the net target requires 273.863 MW of particle diversion and 82.209 MW of dedicated KCS rejection per wing. Two identical wings sum to 199.82 MW net gain and 164.418 MW KCS duty; one wing cannot spend the other wing’s reserve.
| Per-wing quantity | MW |
|---|---|
| Diverted particle power | 273.863 |
| Converter electricity before delivery | 191.704 |
| Delivered converter electricity | 182.119 |
| Displaced thermal electricity | 82.159 |
| Additional auxiliary demand | 0.050 |
| Net electrical gain target | 99.910 |
| Dedicated KCS heat rejection | 82.209 |
| Change in main rejected heat | -182.119 |
The account uses 70% direct conversion, 95% delivery, 30% displaced thermal-electric output, 80% replacement-heater efficiency, and a favorable 50 kW fixed auxiliary load per wing. The nominal row assumes zero replacement heating. The bus balance is delivered converter output minus displaced thermal electricity, heater electricity and extra auxiliaries.
The KCS duty is not an equal increase in total vessel waste heat. In this fixed-reactor comparison, main rejected heat falls as energy leaves the earlier thermal path. The combined rejected-heat change balances the added bus electricity. Reactor/plasma response and the full plant remain outside this incremental account.
If 99.91 MW meant delivered converter electricity rather than net gain, the same assumptions would yield only 54.788 MW net. This check does not change the recorded net target.
The grid evaluates 6,561 authored parameter combinations: 3,231 have a positive algebraic root and 3,330 do not. They are sensitivity cases, not probabilities or accepted configurations. At 30% replacement heating, the nominal efficiencies give no positive diversion solution for the target.
| Usable KCS MW | Required external buffer MJ | 100 MJ reached after first diversion s |
|---|---|---|
| 1.550 | 12,875.971 | 7.343 |
| 40.000 | 6,342.938 | 16.703 |
| 80.000 | 310.434 | 65.003 |
| 82.209 | 0.000 | Not reached in this model |
| 90.000 | 0.000 | Not reached in this model |
With 1.55 MW of usable rejection, the 100 MJ allocation fills after about 7.343 seconds. Required buffer means the unbounded diagnostic peak; heat above the capped allocation is explicitly unaccommodated. A zero peak at a higher declared rejection rate does not qualify a physical radiator.
| Isolation delay s | Gross converter feed energy MJ | Using net gain as feed MJ | Omitted energy MJ |
|---|---|---|---|
| 0.25 | 136.589 | 74.933 | 61.657 |
| 2 | 455.297 | 249.775 | 205.522 |
The gross converter feed exceeds the net increment because displaced generation is subtracted only in the net comparison. The electrical dump/buffer screen does not model whole-wing shutdown, rotor or magnetic energy, primary generation, or the final heat destination. Its historical 1 GJ electrical buffer is separate from the 100 MJ thermal allocation.
The separate 87.5 MW turbine output is not credited to this net ledger. Converter heat alone is below that output even at ideal conversion; another declared heat input would require its own account.
COMPLETED NUMERICAL STUDY / R2
The reference takes the smallest diversion allowed by the net target, declared available particle surplus and usable KCS rejection. Data acceptance, protected-load acceptance and physical permission remain separate requirements. Docking and atmospheric operation request bypass.
| Declared condition per wing | Conditional net gain MW | Interpretation |
|---|---|---|
| Nominal assumed inputs | 99.910 | Calculated estimate under declared bounds |
| 80 MW usable KCS | 97.222 | Calculated estimate under declared bounds |
| 40 MW usable KCS | 48.556 | Calculated estimate under declared bounds |
| 200 MW declared particle surplus | 72.950 | Calculated estimate under declared bounds |
| 10 percent heating replacement | 65.677 | Calculated estimate under declared bounds |
| 30 percent heating replacement | 0.000 | Bypass requested; no gain credited |
| One percent extra auxiliary fraction | 94.035 | Calculated estimate under declared bounds |
| Missing particle observation | Unassessed | No operating estimate |
| Unaccepted observations | Unassessed | No operating estimate |
| Docking | 0.000 | Bypass requested; no gain credited |
| Atmospheric mode | 0.000 | Bypass requested; no gain credited |
| Protected loads unaccepted | Unassessed | No operating estimate |
Zero in a bypass row means no optional gain is credited by the request. It does not mean existing heat instantly disappears. Missing or unaccepted observations remain unassessed.
| Cooling event | Heat-release time s | Required external buffer MJ | Peak unrated converter heat MJ |
|---|---|---|---|
| Cooling decreases to 40 MW | 0 | 31.657 | 0.000 |
| Cooling lost for 30 seconds, diversion remains isolated | 0 | 63.119 | 0.000 |
| Cooling decreases to 40 MW | 5 | 242.667 | 410.762 |
| Cooling lost for 30 seconds, diversion remains isolated | 5 | 472.695 | 410.762 |
| Cooling decreases to 40 MW | 15 | 616.739 | 1,185.974 |
| Cooling lost for 30 seconds, diversion remains isolated | 15 | 1,079.241 | 1,185.924 |
At five seconds of heat-release lag, the 40 MW cooling case needs 242.667 MJ externally, exceeding the inherited 100 MJ allocation. For this authored event alone, pre-event derating to about 69.720 MW net fits the declared allocation. For a 30-second complete loss with diversion isolated, the analogous pre-event value is 20.846 MW net. These are conditional fault-case limits, not new vessel ratings.
The converter inventory is heat awaiting release and has no accepted physical capacity or temperature range. The external buffer diagnostic can exceed 100 MJ to expose a deficit; a physical 100 MJ buffer does not gain that capacity. Circulation continues while heat remains. Restoring cooling does not automatically restart isolated diversion.
Measure available particle surplus, heater and auxiliary demand, converter thermal mass and temperature limits, heat-release and isolation response, time-dependent usable rejection and buffer enthalpy. Complete the main thermal return, protected-service and independent protection accounts. AXIOM retains final physical permission and ZSA owns independent acceptance. These models calculate no new thrust, cruise or braking performance.
ALREADY EXECUTED / REPRODUCIBLE
Expand each study below to read the checks it passed.
14 internal checks passed.
17 internal checks passed.
The studies extend the project’s recorded KETS energy comparison, pulse trial and MAGTRANS protection demonstrator. Earlier pump, buffer and response values retain their reference scope; the electrical isolation timings are hypothetical when applied to particle diversion. No fleet-wide hardware capacity follows from this per-wing calculation.
The current Zorak study follows one command through cooldown and accounts for both grid-powered pumps. The earlier 50-minute fleet replay uses ten repetitions to estimate the thrust each major vessel would need to match the flagship.