Skip to the rules
EARTH & SPACE / PROGRAM ATLAS

The ZENIT Program / Reference

The ZENIT Rules

The principles Fredrik Sommerseth Olsen uses to make design decisions across ZENIT Earth and ZENIT Space.

28 November 2026

An open research notebook beside a spacecraft window

The two AXIOM laws

Equilibrium First

Keep the system stable and protect essential services. When two settings meet the same task and limits, prefer the one that needs less corrective energy over the same interval.

Field Primacy

GENI coordinates electromagnetic interactions. Define the boundary of the vessel or facility, then account for the energy, particles and momentum that cross it.

Who decides, and who acts?

NEXUS
Compares observations with the model and presents uncertainty.
CMC
Supplies the vessel’s checked magnetic and timing reference. The fusion core provides power separately.
GENI
Coordinates field requests against local observations, the reference and equipment limits.
SERAT
Allocates power, cooling and reserves. It accounts for recovered energy, losses and discharge.
Local AXIOM
Decides whether equipment may physically proceed. Independent protection can trip the affected equipment.
Local controllers
Apply a permitted setting and return the measured equipment state.
ZENIT Safety Authority
ZSA authorizes tests and owns anomaly closure, configuration acceptance and qualification.

Equilibrium First in the register · Field Primacy in the register

How the rules evolved

  1. The earliest related exchange recovered, dated in Oslo time, began with Fredrik’s question about auroral protection.

  2. January 2025

    On 3 January he explored magnetic fields and space travel. The 13 January Trell design conversation described a science and supply vessel. A presentation from 15 January records its mission and power concept.

  3. January–April 2026

    The early GENI–AXIOM framework examined pressure, frequency, a field signature for return, and the limits of heat storage and rejection. The proposed navigation effects remain research questions.

  4. July–August 2026

    July’s engineering baseline set out system responsibilities. On 27 July Fredrik named The ZENIT Program and its Earth and Space branches. The August register recorded 134 Earth and 117 Space claims and summarized them in 12 master statements per branch.

  5. November 2026

    The Space shield returned to five layers across five hull sectors. GENI R1 clarified local authority on 22 November. The fleet adopted twin machinery wings and Zorak’s synchronized pulse as design references. On 28 November Fredrik released the reviewed MDI-1 docking design entry.

Early magnetic studies · Program naming · The 24 August summaries

How a rule works on Zorak

All 18 named Gen 2 vessels require two machinery wings. During the reference IT-Jump formation, eight interceptors stay docked with both wings in bypass. Each host counts its carried mass once. After transit, GENI checks local readiness and AXIOM grants permission before each eligible vessel can boost.

In Zorak’s adopted model procedure, KETS and engine boost start together with standard Outverse active. Each wing uses the power left after essential services, plasma reheating and cooling. Norak and Marak keep their own cruiser layouts and use the synchronized pulse in orbital mode.

+1,828 N·sExtra forward impulse in the current Zorak simulation, including cooldown through 300 seconds. The command lasted 180 seconds. Each subsequent boost requires a new request.

The fleet’s 0.075c formation cruise figure is a design target. Crediting a wind assist requires overtaking wind and a net forward gain through cooldown. Delivered thrust still needs a physical measurement.

An open proposal for plasma heating

Fredrik’s “electrical friction fusion” idea asks whether electrical resistance could supply some of the plasma reheating already budgeted in the model. Count the power consumed and the heat delivered once. A propulsion benefit would require more forward impulse than the existing synchronized run on the same inputs, through cooldown. The proposal has no measured thrust gain.

Single-boost comparison · Earlier ten-pulse fleet study · MDI-1 docking decision

What carries over to Earth?

Start with the service a community already relies on. Make the smallest effective change, protect essential loads, isolate faults and retain a conventional fallback. Local authorities and qualified people keep their responsibilities. Each Earth facility or vehicle needs evidence for its own environment.

The Earth fusion concept uses one core, a separate SERAT Energy Island and five-layer GENI Inverse. The selected ZC-1 and ZA-1 designs use direct hydrogen combustion. Ordinary Earth vehicles retain conventional protection.

SafeSpot applies the refuge reserve rule before scheduling optional loads. Facility telemetry preserves the observation time and requires a fresh independent witness for recovery review. ZP-1’s berth study verifies capture and release separately. In the Feros-to-Airos shore study, one observed crossing and a matching receipt complete the sample handover.

Space methods adopted on Earth · Feros TSC software results

Browse rules by subject

Open a subject to read its rules and sources. Adopted records a project decision or target. Model only applies to a particular simulation. Proposed identifies an idea under review. Historical preserves earlier wording or a superseded configuration.

159 subject entries

Program authority and the GENI framework46
  • Adopted · Foundations

    GENI I · Equilibrium First (AXIOM Law 1)

    Protect stability and essential services first. Among settings that meet the same objective and safe limits, choose the one requiring the least corrective energy over the stated interval.

    GENI operating principles

  • Adopted · Foundations

    GENI II · Field Primacy (AXIOM Law 2)

    Use GENI to describe electromagnetic interactions. Include gravity, structure, heat and environment in the overall model. Record energy, particles and momentum crossing its boundary.

    AXIOM Law 2

  • Adopted · Foundations

    GENI III · Field interaction

    Calculate charged-particle forces from local electric and magnetic fields, particle charge and velocity. Field pressure alone does not establish the force on equipment or the whole vessel.

    GENI operating principles

  • Adopted · Foundations

    GENI IV · Plasma pressure and stability

    Use the plasma-to-magnetic pressure ratio as one diagnostic. Check geometry, gradients, disturbance response and equipment limits before accepting a stable setting.

    GENI operating principles

  • Adopted · Foundations

    GENI V · Geometry and timing

    Log field strength, direction, timing and geometry. A gain needs a stated input, baseline, output and uncertainty.

    GENI operating principles

  • Adopted · Foundations

    GENI VI · Shield evidence by hazard

    Assess radiation and thermal exposure separately. Compare matched conditions, record loads in adjoining regions and confirm the applied field with independent observations.

    GENI operating principles

  • Adopted · Foundations

    GENI VII · SERAT energy closure

    Define the system boundary and time interval. Balance supply, useful output, rejected heat or exhaust, and changes in storage. Credit recovered energy once, including conversion and discharge losses.

    SERAT energy closure

  • Adopted · Foundations

    GENI VIII · Vessel motion

    Use full instantaneous vessel mass, remaining propellant, exhaust direction and external forces. A proposed improvement needs measured exhaust momentum or a demonstrated external exchange.

    GENI operating principles

  • Adopted · Foundations

    GENI IX · Momentum accounting

    Include the vessel, working matter and fields. A sustained vessel momentum change requires momentum to cross that boundary through exhaust, radiation or another demonstrated interaction.

    GENI operating principles

  • Adopted · Foundations

    GENI X · Frequency studies

    Compare settings at the same operating demand. Record timing, injected changes, corrective energy, measured response, baseline and uncertainty.

    GENI operating principles

  • Adopted · Foundations

    GENI XI · Field fingerprint

    Keep the history of frequency, magnetic field and electric field for replay. A navigation or return claim also requires independent position and velocity in a stated frame.

    GENI operating principles

  • Adopted · Foundations

    GENI XII · Heat rejection

    Account for heat generated, stored, transported and rejected over the entire duty cycle. Credit recovered heat only at a temperature useful to its recipient.

    Thermal limits and redundancy

  • Adopted · Foundations

    GENI XIII · Essential services

    Protect cooling and life support with defined independent supplies and reserve budgets. Structural support attributed to fields requires evidence of loads, stresses and failure behaviour.

    Thermal limits and redundancy

  • Adopted · Foundations

    GENI XIV · Redundancy and degraded operation

    Count independent channels and shared failure points. Check available reserve energy and deliverable power separately. Isolate or hold the affected function, then verify its condition before restoration.

    Thermal limits and redundancy

  • Adopted · Foundations

    GENI XV · Fleet coordination

    Centri coordinates readiness, TCC displays and records reports, local AXIOM grants physical permission and Zorak authorizes formation changes. A fleet average cannot clear a local breach.

    Centri readiness example

  • Adopted · Authority and evidence

    NEXUS, GENI and CMC

    NEXUS compares observations with the digital twin and reports uncertainty. The vessel CMC supplies a checked timing and magnetic reference. GENI uses these inputs to request field settings.

    GENI and the local control chain

  • Adopted · Authority and evidence

    SERAT, AXIOM and local equipment

    SERAT allocates protected power, cooling and reserves. Local AXIOM grants physical permission. Local controllers apply permitted commands, return measured state and retain independent protection.

    GENI and the local control chain

  • Adopted · Authority and evidence

    Independent ZSA authority

    ZSA owns hazard tracking, test authorization, anomaly closure, configuration control and final program qualification. Keep this authority independent of command, NEXUS, propulsion and the reactor.

    ZENIT Safety Authority

  • Adopted · Authority and evidence

    Qualification evidence

    Time-align observations, requests, permission and independent equipment response. Document calibration, limits, uncertainty, repeatability, configuration, fault handling and unresolved anomalies for ZSA.

    Scope of independent acceptance

  • Adopted · Authority and evidence

    Check proposed changes against the baseline

    Identify the subsystem and whether the new drawing, simulation or description confirms, extends or conflicts with the baseline, or remains experimental. Preserve the accepted design while resolving discrepancies.

    Canonical framework · project archive

  • Adopted · Authority and evidence

    Identify the evidence tier

    Use established physics, engineering extrapolation and speculative project theory as distinct descriptions. A concept, calculation or software exercise establishes only what its own evidence supports.

    Physical readiness and the limits of evidence

  • Model only · Authority and evidence

    AXIOM conflicting and stale commands

    The reference scenarios hold incompatible requests and disagreement between local safety data and NEXUS. A stale authenticated request is rejected after state change. Recovery needs fresh evidence and, for conflicting movement requests, human resolution.

    AXIOM physical authority

  • Adopted · Authority and evidence

    Credential and permission

    Distinguish identity, role and permission for this particular action. A valid operator identity and a plausible report do not override local protection or AXIOM.

    Evidence and authority

  • Adopted · Authority and evidence

    Atlas and AGCM

    Atlas retains observations. AGCM checks reference geometry, coordinate history and route confidence before movement is proposed.

    AGCM and Atlas

  • Adopted · Authority and evidence

    Field Compression Monitor

    Provide the bridge with shield state and recovery status, including heat, current, reserve, phase and compression. Show a degraded condition explicitly.

    Field Compression Monitor

  • Adopted · Authority and evidence

    Close only the work actually completed

    A completed reference replay can close its own software task. Leave the larger question open when it still needs measurement, facility or supplier choices, human trials, permission or independent review.

    Research Archive review

  • Adopted · Authority and evidence

    External comparisons

    Use other programs as clearly identified benchmarks. Their equipment, flights and demonstration results establish no ZENIT equipment performance.

    External benchmarks

  • Adopted · Founder and publication

    Program name and branches

    On 27 July 2026 Fredrik adopted The ZENIT Program for the work previously called the ZENIT Project. Earth and Space are its two branches, each with its own scope.

    Program name and branches

  • Adopted · Founder and publication

    Founder attribution

    Credit Fredrik Sommerseth Olsen for the program’s design decisions. He identified the CMC as his contribution on 28 July 2026. This records project attribution, without deciding legal patent rights.

    Founder’s CMC record

  • Adopted · Founder and publication

    Current and historical names

    Use GENI for the current framework. Preserve GENI-X and GENI-10 in historical references and identify the revision when older artwork uses an earlier name.

    Historical and current GENI names

  • Adopted · Founder and publication

    Owner authority to retire a design

    Only Fredrik can authorize retirement. If an illustrated list omits a vessel or a study conflicts with the fleet record, preserve the design and document the discrepancy.

    Rekor design history

  • Adopted · Founder and publication

    Owner authority to publish

    A private draft is a review copy until Fredrik authorizes release. Apply the scope and exclusions of his approval to the named release.

    Founder approval · project archive

  • Adopted · Founder and publication

    Attribute and preserve public records

    Give each public entry a stable identifier, wording, source and evidence label. Retain withdrawn or superseded entries with their revision history. Leave conflicting source evidence visible.

    Claims coverage and source issues

  • Adopted · Founder and publication

    Public technical design and private legal wording

    Public technical summaries may report documented project choices and verified filing evidence. Draft patent clauses and correspondence stay owner-only. Review filings, publications and grants as distinct events.

    Patent Claims coverage

  • Adopted · Founder and publication

    MDI-1 publication exception

    Fredrik authorized the reviewed MDI-1 design entry for public release on 28 November 2026. Its public status records a founder decision for compatible hulls and leaves hardware qualification open.

    MDI-1 founder decision

  • Historical · Origins and earlier rules

    5–8 January 2025 · field and energy studies

    Early work linked solar supply, magnetic shielding and energy recovery. The research outline also covered onboard water, docking and energy allocation between craft.

    Early field and energy studies

  • Proposed · Origins and earlier rules

    Solar or interstellar plasma interaction

    The early proposal considered using external plasma for propulsion. A specific physical effect requires measured coupling and momentum transfer.

    Early plasma interaction proposal

  • Historical · Origins and earlier rules

    13–16 January 2025 · Trell

    The original mid-sized vessel was for scientific exploration and supply. Keep its design-conversation examples separate from its surviving 15 January presentation and later ZENIT reconstructions.

    Trell design history

  • Historical · Origins and earlier rules

    Original framework I–VI · equilibrium and field geometry

    The earlier fleet manuscript set out equilibrium, field primacy, GENI interaction, ratio-based stability, geometric amplification and a unified shield. GENI R1 later limited these claims to specified fields, equipment limits and measured effects.

    Historical fleet framework · project archive

  • Historical · Origins and earlier rules

    Original framework VII–X · momentum, frequency, docking and HAB-G

    The early model proposed field momentum management, frequency travel, a frequency handshake called SFP-Min and a habitable-mass gravity model called HAB-G. Current vessel motion uses full mass. Physical navigation and field effects still need evidence.

    SFP-Min and HAB-G docking study

  • Historical · Origins and earlier rules

    Original framework XI–XII · SERAT and DTPCS

    The manuscript paired energy redirection with a waste-heat conversion proposal called DTPCS. Current SERAT credits usable recovery once, defines its losses and includes safe rejection or discharge.

    Historical fleet framework · project archive

  • Historical · Origins and earlier rules

    Original framework XIII · early fleet roles

    Freyak held command and distribution, Kronak had the exploration role, and Jetnok and Araknok were assigned protective roles in the original framework. The current Qi-Fleet register governs present roles.

    Historical fleet framework · project archive

  • Historical · Origins and earlier rules

    Original framework XIV–XV · exports, fuel and planetary anchors

    The early fleet sourced exports from planets and moons. Its fuel doctrine used deuterium and helium-3 for energy, water or hydrogen for propellant, and ammonia for trade. Kerok represented agriculture and life, Roknok mining and industry.

    Historical fleet framework · project archive

  • Historical · Origins and earlier rules

    Original fleet invariants

    The early framework assumed vessels could be replaced and fleets relied on off-ship primary production. It gave field geometry precedence over magnitude as a design maxim. Current comparisons measure geometry together with field strength and limits.

    Historical fleet framework · project archive

  • Historical · Origins and earlier rules

    Growth and production capacity

    The early logistics summary admitted expansion only where stability improved, corrective energy fell and planetary production could sustain the larger system.

    Historical fleet framework · project archive

  • Historical · Origins and earlier rules

    21 January and 11 April 2026 · framework review

    The reviews recorded energy closure, thermal limits, redundancy and fleet timing. The April summary used numerators for proposed capability and denominators for limiting conditions. Treat that notation as a historical explanatory device.

    January and April framework review

Fleet roles and flight governance29
  • Adopted · Qi-Fleet

    Named fleet roster

    Count 18 named Gen 2 hulls. Zorak is the flagship. Derko, Herko and Sorko are carriers. Anorak and Fronak are research ships, with Ranok in reserve. Centri is the IT-Driver. Norak and Marak are planetary cruisers. The remaining eight are interceptors.

    Current Gen 2 roster

  • Historical · Fleet history

    Earlier fleet counts

    The October R1 design counted 14 crewed vessels. A later planning register counted 17 before Marak became the eighteenth. Preserve roster versions when quoting a count.

    Historical 17-ship R3 roster and revision note

  • Adopted · Interceptor carriage

    Host assignments

    Keep these interceptor pairs with their hosts for the reference transit: Araknok and Ferko with Zorak, Rekor and Jetnok with Derko, Zuma and Zarek with Herko, and Serko and Zotno with Sorko.

    Gen 2 interceptor host assignments

  • Adopted · Shuttles and drones

    Auxiliary craft accounting

    Keep the 11 standard shuttles, four first-aid shuttles and 62 assigned drones outside the 18 named-hull refit. Stowed craft stay aboard and contribute no independent thrust during the reference formation run.

    Auxiliary craft inventory and host services

  • Adopted · Fleet inventory

    Drone berths

    Plan for 62 assigned drones, 74 berths and 12 vacant positions. Berth capacity, assigned craft and availability are separate counts.

    Current drone berth plan

  • Historical · Fleet history

    Superseded drone berth plan

    The earlier R3 ledger showed 62 assigned drones, 82 berths and 20 unused positions. Use the relevant revision when comparing capacity.

    Historical four-host R3 berth plan

  • Adopted · Drone logistics

    Host-held spares

    Drones carry their installed cassettes. Their host stores spares, tooling and alternatives in its cassette logistics bays.

    August drone cassette rule

  • Adopted · Vessel roles

    Mission systems by hull

    Preserve carrier hangars and workshops, Anorak’s reference and protected science loads, Fronak’s laboratory power and custody work, Centri’s coordination role and Ranok’s modular reserve role when sizing a common refit.

    Gen 2 roles by vessel

  • Adopted · Norak and Marak

    Cruiser roles and surface access

    Norak is the survey cruiser with two roadsters, four survey drones and two orbital relays in its study. Marak is the logistics and rescue cruiser with two cargo bays, a patient-transfer area and access reserved for two roadsters.

    Norak and Marak cruiser profiles

  • Historical · Cruiser history

    Historical roadster exclusivity

    R3 gave Norak exclusive shipboard carriage of roadsters. Marak later acquired a design provision for two. A space reservation alone does not assign or transfer a roadster.

    Historical roadster assignment

  • Adopted · Flight scope

    Earth landing scope

    Reserve Earth landing for planetary cruisers such as Norak and Marak. Interceptors and wingless transfer shuttles dock in space. Keep earlier descent studies in their historical context.

    Space-only docking and cruiser Earth landing

  • Adopted · Norak and Marak

    Earth–Space handover

    Use rolling runway departure and wing-borne atmospheric flight for both cruisers in the concept. Isolate the outside-air combustion path from the fusion core. Close the atmospheric valve and end hydrogen combustion in Space Mode. Keep KETS boost inhibited in atmospheric flight.

    Earth–Space flight profiles

  • Model only · Cruiser study

    Loaded cruiser departure

    Use the actual loading configuration for mass, centre of gravity, clearance, rotation and available lift. Compare thrust with matched drag and weight at the stated flight condition. A single steady-climb point leaves takeoff distance and sustained performance open.

    The public runway summary gives design estimates. Detailed loaded-departure checks are in the separate cruiser study.

  • Adopted · Space vessels

    Loaded mass and departure changes

    Size planned power for the maximum qualified departure mass. Recheck the integrated vessel after changes to mass, storage, structure, crew, fuel or propulsion equipment. A relevant change requires a passing check before departure.

    August integrated systems checks (ZS-097–099)

  • Adopted · Space crew survival

    Fleet survival doctrine

    Treat the vessel as the primary habitable refuge. Isolate a fault while preserving healthy services, and distribute essential functions across zones. The August design expressly omitted escape pods.

    Crew survival and distributed services (ZS-102–105)

  • Adopted · QFTP-24

    Transition catalogue

    Use six categories for design reviews: propulsion, KETS, shield, docking, Earth–Space and IT-Jump. The 24 proposed transitions describe the workflow. Physical qualification remains open.

    QFTP-24 transition families

  • Adopted · IT-Jump

    IT-Jump carriage and release

    Keep interceptors docked during corridor transmission. Conventional boost remains inhibited through transmission and post-jump validation. Require propulsion release, GENI verification and fresh local AXIOM permission before independent boost. Docked guests stay in bypass.

    IT-Jump docking and release accounting

  • Proposed · IT-Jump

    IT-Jump evidence boundary

    Treat corridor transmission as a proposed mechanism. A post-release conventional impulse calculation provides no measurement of jump-field impulse or independent evidence of a working corridor.

    IT-Jump status and evidence

  • Model only · Fleet impulse model

    Formation bookkeeping

    The reference run has ten free-flying assemblies and eight docked guests when reserve Ranok participates. Count carried mass once in each host stack. Use each assembly’s all-up mass for a common acceleration; available thrust still needs hull-specific evidence.

    Matched formation comparison and all-up mass

  • Adopted · MDI-1

    Docking capture and release

    Use MDI-1 on compatible vessels: SCM-1 soft capture, an eight-point HCM-1 mechanical lock and ERM-1 controlled emergency release. MAGTRANS controls relative motion. Port magnetic assistance is supplementary. Physical qualification remains open.

    MDI-1 founder decision

  • Adopted · Docking

    Independent docking evidence

    Keep the gate request, its local readback and independent confirmation of capture separate. Each crew checks its own evidence. With lost approach lock, hold and obtain fresh permission before retrying. Keep numerical docking limits specific to the vessel/host pairing.

    Independent evidence of capture

  • Adopted · Docking

    Paired interface qualification

    Verify receiving geometry, clearance, pressure compatibility, capture loads, retention and independent readback for each proposed pair. Local AXIOM may withhold permission. ZSA reviews the pair’s own evidence.

    Receiving-interface review

  • Adopted · Trell and Fronak

    Sealed-sample handover

    Trell docks externally to Fronak. Both crews confirm capture and check the seal, temperature history and receiver readiness. Record actual crossing once. Match the receipt to the canister, transfer and receiver. Reconcile a lost receipt before further movement.

    Local capture evidence and sealed-sample receipt

  • Adopted · Cold samples

    Condition evidence before release

    Hold onward transfer if a required observation or temperature interval is missing. Route confirmed seal failure or temperature excursion to quarantine. Specify the specimen’s limits and the receiving store’s capacity for each case.

    Sample acceptance and cold-storage checks

  • Adopted · Trell research

    Trell essential power

    Keep essential services on the protected wired supply. Compare optional shield-pickup proposals at equal useful load, including electrical draw, losses, cooling and storage. Local host equipment needs its own evidence.

    Wired supply and shield pickup comparison

  • Proposed · CORAC

    CORAC lunar transport

    Lekor, Lomec and Larko share a proposed lunar lander design. The outpost study uses one outlying landing pad and three underground tow-in bays. Six seats and one tonne of sealed cargo are per-craft targets.

    CORAC lunar lander study

  • Proposed · CORAC and medical transport

    CORAC crew refuge

    The outpost design assigns two separately supplied refuges, each sized for its six-person crew. A gallery can isolate the science area. The proposed rescue handover leads from the refuge through compatible lunar transport and first-aid shuttle to Zorak Sick Bay.

    CORAC refuges and crew support

  • Adopted · Fleet records

    Combat-vessel records and review

    Use the approved roster, six class labels and six transition categories for consistent documentation. Report each vessel’s current evidence and outstanding anomalies separately. Historical checks and register consistency do not certify Gen 2 hardware or replace independent ZSA acceptance.

    Public Space Combat lists outstanding hull checks. The fleet documentation review has no public counterpart.

  • Adopted · Fleet coordination

    Authority for formation changes

    Zorak authorizes a formation change. Centri’s FCMC-1 coordinates readiness from fresh reports on each participating hull, and TCC records them. Physical permission stays with local AXIOM. An improvement in the fleet mean still requires a separate check of each hull.

    Centri formation readiness and local permission

Propulsion and shields33
  • Adopted · Space subsystems

    Energy and magnetic reference

    Keep the fusion plant, magnetic reference and field generators distinct. The CMC supplies reference and synchronization near the centre of mass; the distributed hull coils generate the requested fields.

    CMC and distributed hull coils

  • Adopted · Twin-core baseline

    Conditioned power distribution

    In the documented twin-core architecture, each core feeds a local fuse, then the central bidirectional fuse, SERAT power corridor and vector accelerator. Protect and condition the power before use.

    Major-vessel power sequence

  • Adopted · Vessel instrumentation

    Bridge and navigation instruments

    Carry FCM on every ZENIT bridge. AGCM checks geometry, coordinate history and route validity before acceleration or docking. Show commanded field state, measured coil state and protective effect separately.

    Bridge field monitoring and navigation

  • Adopted · Aurora / Space Outverse

    Original Aurora layout

    Use five concentric layers and five hull sectors on shielded space vessels. Fore, starboard, aft, port and combined dorsal–ventral give 25 controlled regions. The map also applies to shielded interceptors and shuttles.

    Restored vessel shield map

  • Adopted · Aurora / Space Outverse

    Duties of the five layers

    Assign outer to first contact, second outer to deflection, middle to load distribution, second inner to stabilization, and inner to crew and vessel protection. Actual protection needs hazard-specific evidence.

    Five Outverse layers

  • Adopted · Earth and Space

    Separate Earth shield geometry

    Earth fusion keeps the five-layer GENI Inverse architecture and facility-specific geometry. Apply the vessel’s 25-region map only where the space-vessel baseline governs.

    Earth and Space shield geometry

  • Historical · Historical vessel shield studies

    Earlier shield variants

    The 15-region, three-layer layout was superseded for space vessels on 10 November 2026. The 40-region hybrid remained a proposal. Historical artwork keeps its revision context.

    Shield restoration and earlier regions

  • Adopted · Shield watch

    Sensor-led protection

    Direct attention to the observed hazard and affected regions, preserve protected reserves elsewhere, and verify the local response. Mark stale, missing or conflicting readings unassessed.

    Related study · diagnostic hull panel

  • Adopted · Shield protection

    Magnetic energy and recovery

    Keep a rated path for stored magnetic energy, maintain local interlocks through loss of supervision, and verify margins and reference quality before restart. An isolated supply can still leave stored field energy and heat.

    Shield transitions and local protection

  • Adopted · Shield qualification

    Hazard-specific evidence

    Assess charged particles, entry heat, neutral debris and penetrating radiation separately. Keep appropriate passive protection, exposure monitoring and avoidance. A coil command or successful single-sector study establishes no fleet-wide protection rating.

    Evidence for each hazard

  • Adopted · Existing and future docking interfaces

    Inverse at docking ports

    Every craft that docks or receives a visitor requires inverse-mode provision at each assigned port. Use propulsion to match motion and local paired-port permission for supplementary final damping. Independent latch feedback confirms capture.

    Docking and local magnetic assistance

  • Adopted · Qi-Fleet ISM-1; R29.6 owner decision

    Inverse initiation and isolation

    The approved nine-phase ISIC-1 concept takes a request through diagnostics, CMC reference, SERAT reservation, AXIOM permission, regional preparation, controlled excitation, GENI verification and mode selection. Lost permission blocks startup or calls for protected discharge. Physical activation awaits qualification.

    ISIC-1 initiation sequence on Trell

  • Adopted · 18 named Gen 2 vessels

    Twin machinery wings

    Provide two independent machinery wings for each of the 18 named hulls. Each has a SERAT feed, locally powered MCC, MAGTRANS transmission, KETS recovery, KCS cooling, bypass and AXIOM isolation. The hull-specific fit and common-cause failures still require assessment.

    Twin-wing fleet decision

  • Adopted · Twin-wing qualification

    Independent ratings

    Use Zorak as the reference. Check propulsion power, force, cooling, isolation, mass and asymmetric loading separately for each hull. A shared core can still disable both wings.

    Hull-specific fit and ratings

  • Adopted · Zorak reference and eligible fleet wings

    Crew services and propulsion priority

    After propulsion release, start KETS and engine boost together. Each wing draws only its local surplus after protected services, plasma reheating and cooling. Hold the 25 Outverse regions at their routine settings in the reference run.

    Synchronized propulsion reference

  • Adopted · KETS study framework

    KETS energy accounting

    Count diverted particle power once; subtract displaced electricity, plasma-heating replacement, auxiliaries and cooling costs. Establish surplus against bypass with matched inputs. A thermal buffer stores heat until it can be rejected.

    Gen 2 KETS energy accounting

  • Adopted · Qi-Fleet mission modes

    KETS inhibition and release

    Hold conventional boost during IT-Jump, post-jump validation and docking. Release independently after GENI verification, fresh local AXIOM permission and confirmed margins. A docked guest’s wings stay in bypass; the cruisers use the recovery pulse in orbit.

    KETS and mission transitions

  • Adopted · MAGTRANS / KETS

    Changing propulsion direction

    Bypass KETS, transition through neutral, verify the drive lock and exhaust clearance. The reverse changeover grants no automatic right to restart the boost.

    MAGTRANS direction change

  • Adopted · Propulsion wings

    Fault containment

    Isolate the affected wing, protect ship services and sustain required cooling. Limit the companion wing to its allowed operating envelope. A fresh check and local clearance govern restart.

    Wing isolation and protected loads

  • Model only · Gen 2 KETS simulation

    Qualified thermal margins

    Count delayed converter heat and external KCS buffer demand separately. The software requests bypass in docking and atmospheric modes. Loss of a cooling path can leave a heat load after diversion has stopped.

    KETS thermal operating envelope

  • Model only · Zorak synchronized replay

    Reference comparison window

    Compare equal fusion input, chemical input, service demand and propellant over pulse, rundown and cooldown. The selected run uses 20% replacement of diverted plasma heat; the two recovery ramps may differ even though boost commands start together.

    Matched pulse and cooldown comparison

  • Model only · IT-Jump assembly accounting

    Formation force and speed

    Count each carried craft’s mass once and give stowed engines zero external drive. Project each independent assembly’s force along the shared travel axis. Impulse and mass yield a change in speed; absolute speed needs a starting speed and reference frame.

    Formation demand and carried mass

  • Adopted · Qi-Fleet formation cruise

    Retained cruise target

    Keep 0.075c (22,484.43435 km/s) as the maximum sustained formation cruise design target. Keep modeled pulse increments separate from that target and from achieved motion.

    Formation cruise model

  • Historical · Earlier cruise assumptions

    Retired conventional sizing case

    The earlier conventional sizing worksheet is a historical study. The fleet now uses the sustained formation target above.

    Owner’s speed correction · 24 November 2026

  • Historical · Earlier cruise assumptions

    Retired high-speed scenario

    The earlier high-speed travel calculation was retired when the sustained formation target was adopted.

    Owner’s speed correction · 24 November 2026

  • Adopted · Optional fleet simulation rule

    Forward wind assist

    Use standard Outverse by default. Optional forward assist requires a cleared independent outward departure, overtaking outward wind, credible coupling and a predicted full-window forward impulse larger than the drive cost. Equality, missing data and uncertain budgets retain standard Outverse.

    Forward wind-assist decision

  • Model only · Zorak wind sensitivity

    Wind coupling at cruise

    The reference wind is 400 km/s. At the retained outward cruise target the ship overtakes it, so the model credits zero forward wind assist. Effective collection area, physical coupling and a high-speed drag magnitude remain unmeasured.

    Related study · forward wind sensitivity

  • Model only · Zorak approach model

    Reverse and stop

    Measure stopping against the chosen target’s motion. Use reverse thrust to cancel closing speed, cut it at the target and use position hold for subsequent drift. Inverse-field braking remains experimental; instantaneous stopping has no established capability.

    Reverse and relative station keeping

  • Adopted · Zorak MIV concept

    Intake and reverse interlock

    If the proposed intake is fitted, close it and reduce its collection field before a direction change. Inhibit the outbound passage through neutral until reverse lock and exhaust clearance are confirmed.

    Intake direction-change requirement

  • Proposed · Zorak MIV and ECD

    Intake and emergency cooling

    Study the controlled intake/conditioning/outbound route separately from emergency cooldown discharge. Keep routine KETS heat on the KCS radiator path. Count capture drag and conditioning power before crediting any intake thrust.

    Intake and emergency discharge

  • Adopted · Orbital and Earth approach modes

    Cruiser operating environments

    Norak and Marak retain separate Earth-capable configurations. During atmospheric entry KETS boost stays inhibited. For orbital propulsion, use the space configuration with atmospheric intake closed and hydrogen combustion off. Verify entry heat, landing loads and runway performance per cruiser.

    Cruiser flight transitions

  • Proposed · 28 November discussion; existing reheat reference

    Electrical friction fusion

    Fredrik’s 28 November question proposes electrical resistance as a source of plasma reheating. Compare any future variant with the existing synchronized run using equal inputs; count delivered heat and machinery losses once. Additional thrust or a new approved cycle remains unestablished.

    Related study · existing plasma reheating

  • Historical · Project Trell antecedent

    Trell’s original rotating shield

    Trell’s 13–16 January 2025 design conversation and presentation preserve the early rotating shield and dynamo concepts. Keep example power allocations attached to their original assumptions; later numerical checks do not qualify the shield or fleet.

    Operation Trell design history

Earth facilities and vessels46
  • Adopted · Earth facilities

    Earth has its own technical authority

    A Space design or software result can inform an Earth study. To adopt it, identify the local service, hazards, evidence and responsible Earth authority. Shared names and similar physics are insufficient.

    Earth and Space design transfer

  • Adopted · Earth facilities

    Start with the local service

    Survey the existing site, identify what already works and where it is vulnerable, and choose the smallest isolated change that meets its need. Credit the existing infrastructure and its developers.

    Minimum effective local change

  • Adopted · Earth facilities

    Protect continuity and a conventional fallback

    Isolate faults by section, preserve a route to essential services after a single energy, control, heat or fuel fault, and retain a conventional fallback for every added function.

    Essential-service continuity

  • Adopted · Earth facilities

    Local people retain lawful authority

    Operators and the responsible authorities decide on public services and policy. AXIOM-Earth handles physical hazards. Clinical, scientific and civic decisions stay with the responsible people.

    People and lawful authority

  • Adopted · Earth facilities

    Qualify the actual site

    Assign the ZENIT designation only to a defined adaptation package. Qualify it for local conditions, seek public and regulatory review, and control its transfer to another site.

    Site-specific qualification

  • Adopted · Earth facilities

    Use the program’s regional reference order

    Compare relevant EU, EEA and Norwegian requirements first, then US and Chinese references where useful. Local legal authority governs each real site.

    Regional reference order

  • Adopted · Earth facilities

    Assign evidence-based facility maturity

    Use G0–G4 from conventional reference to operating qualification. G4 requires construction, regulatory review, tests and operational qualification.

    G4 operating qualification

  • Adopted · Earth facilities

    Adapt upgrade priorities to local conditions

    Use the development order for the 12 upgrade domains as a starting point. Local service needs can change their priority.

    Facility-specific priorities

  • Adopted · Earth facilities

    Keep local operation through loss of NEXUS

    Preserve safe local control and protection when remote supervision or communications are lost. Keep observation time, source, validity and confidence visible to operators.

    Local control after NEXUS loss

  • Proposed · Earth facilities

    Facility groups and regional settings

    Assign one primary facility group (A–L) and supporting groups as needed. The adaptation studies consider Nordic, arid, tropical, urban, rural, coastal, mountain, industrial and contaminated settings.

    Primary and secondary facility groups

  • Proposed · Earth facilities

    Earth status, coordination and power roles

    Use LSI for a human-readable infrastructure view and equipment history. NEXUS-Earth supports diagnosis and restoration. SERAT-Earth coordinates energy, heat and resource flows.

    Earth-system information and control

  • Proposed · Earth facilities

    Continuity states

    The proposed hospital HP0–HP3, water W0–W3 and energy E0–E3 scales progressively protect priority services, including local or mobile support during severe loss.

    Continuity states for energy supply

  • Adopted · Civil resilience

    Independent reserves

    Keep an emergency reserve independent of hydrogen supply. Separate generator banks across safety and control zones. Black start needs independent power sources, storage and control.

    Independent black-start supplies

  • Adopted · Civil resilience

    Clinical and public services

    Keep experimental medical work isolated from ordinary clinical care. Authorized clinicians make treatment decisions. Critical hospital services require independent power, cooling, data and control.

    Independent supply for critical hospital services

  • Adopted · Civil resilience

    Hydrogen supply boundaries

    Separate bulk storage and handling from patients and critical hospital equipment. Essential users need alternatives to single suppliers, storage zones, routes and regulators. A failed production line must leave others available.

    Hydrogen storage at hospitals

  • Adopted · Civil resilience

    Water release needs independent evidence

    Detect and treat contamination. Retain conventional treatment and obtain independent laboratory confirmation and authorization before critical release to use.

    Independent water-release evidence

  • Adopted · Civil resilience

    Essential thermal services

    Treat heating and cooling as essential where local climate threatens continuity. Preserve life safety, shelter, water, communications and other essential services before optional loads.

    Thermal service continuity

  • Proposed · Earth fusion

    One core and a separate SERAT island

    Study a one-core, stellarator-derived Earth facility with a separate SERAT Energy Island and optional hydrogen production. The 5.30 GW thermal and 2.00 GW net-electric figures are design targets.

    Earth fusion architecture

  • Proposed · Earth fusion

    Earth GENI Inverse

    The five layers cover plasma equilibrium, charged exhaust, neutron/heat/fuel recovery, magnetic/electrical containment and outer plant protection. The facility model uses a separately referenced timing system with three proposed anchors.

    Earth GENI Inverse layers

  • Proposed · Earth fusion

    Ground test geometry

    The research-facility concept places 25 test stations across five sectors. Geometry alone gives no measured protective envelope.

    Ground-station layout

  • Adopted · Earth fusion

    Authorize transfers across the facility envelope

    Detect and classify each outward transfer, obtain independent authorization and contain propagation of faults across layers.

    Earth Inverse transfer rules

  • Adopted · Earth fusion

    Bound water, heat and hydrogen recovery

    The adopted integration work uses modular hydrogen production, treated water, partial recovery and oxygen co-product handling. Complete recycling, unlimited fuel and sustained net export require independent evidence.

    Partial recovery and hydrogen integration

  • Adopted · Earth fusion

    Qualification before plant-performance claims

    Qualify the architecture, protection systems and operating states, and obtain regulatory review. The selected research baseline describes a conceptual plant.

    Plant performance evidence

  • Adopted · Earth fusion

    Keep independent fusion test hold points

    WP3 R1 requires independent ZSA hold points for planned quench-protection and fuel-accountancy tests. Plasma-facing materials also require actual tests. Planning alone confers no qualification.

    Independent test hold points

  • Adopted · Earth fusion

    Use the ten critical-capability decisions

    Record the reference technology, alternatives, test facilities, protection evidence, regulatory route, backup sources, metrology, integrated testing, materials evidence and domestic capability decision at the relevant gate.

    Critical capability and qualification gates

  • Adopted · Earth vehicles

    Direct hydrogen combustion

    ZC-1 and ZA-1 use direct hydrogen combustion in the founder’s design. The earlier electric-motion ZC-1 drawing is superseded.

    Hydrogen-combustion decision

  • Adopted · Earth vehicles

    ZA-P01 drive

    Keep hydrogen combustion in the nacelle and route the mechanical drive through the turbine, gearbox and shaft to the propeller.

    ZA-P01 engine and propeller

  • Adopted · Earth vehicles

    Partial exhaust-water recovery

    Treat ZC-1 water recovery as partial. Measure actual recovery and water quality and establish safe discharge conditions before claiming performance.

    Partial water recovery

  • Adopted · Earth vehicles

    Conventional vehicle protection

    Ordinary Earth vehicles retain conventional protection. ZP-1’s marine hydrogen safeguards must be independently verifiable. Special facility or vessel shield concepts require their own case.

    Conventional vehicle protection

  • Proposed · Earth vehicles

    Separate primary drive and reserve

    ZH-1’s concept separates its primary hydrogen drive and emergency reserve. Its earlier hybrid-main-drive direction was withdrawn.

    ZH-1 drive and reserve

  • Proposed · Earth vehicles

    ZA-1 anti-ice heat

    SERAT-DTAI-A1 proposes two separated secondary loops to deliver recovered heat for wing anti-icing. Qualification remains open.

    ZA-1 anti-icing study

  • Proposed · Earth vehicles

    Marine drives remain vessel-specific

    ZP-1 studies hydrogen-driven waterjets. The ZB-1 concept specifies twin hydrogen engines. The ZCS-1 study assigns two engine rooms and twin controllable-pitch propellers.

    ZP-1 waterjet concept

  • Model only · Earth adaptation

    SafeSpot reserve first

    Carry CORAC’s reserve rule into the shelter model. Budget lighting, communications and ventilation controls first, retain the reserve floor, then admit complete optional work blocks by priority.

    SafeSpot refuge reserve study

  • Model only · Earth adaptation

    Heat service and fallback

    Match heat delivered, ambient conditions and starting and ending thermal/storage states when comparing recovery. Account for unused source heat through a confirmed independent fallback or reduce the source.

    HeatPod recovery and fallback

  • Model only · Earth adaptation

    Facility recovery review

    Preserve the original observation time after a delay. Only a fresh report, agreeing independent local reading and local AXIOM clearance qualify a case for review. A receipt alone cannot clear equipment.

    Facility telemetry recovery review

  • Model only · Earth adaptation

    ZP-1 shore connection

    In the berth model, require seat, latch, independent confirmation and local clearance to energize. Movement or a new session clears previous confirmations. Release requires local clearance, isolation and independent zero-energy evidence.

    ZP-1 shore-connection replay

  • Adopted · Feros and Airos

    Separate propulsion and services

    Feros has a selected one-core freshwater-steam design. Its propeller shaft-power target and the service generator’s electrical output have separate accounts. Both depend on the same steam supply.

    Feros power and service architecture

  • Adopted · Feros and Airos

    Protect occupied services

    The Feros design covers 48 people. Protected emergency life support, local indications, independent breathing support and residual-heat removal continue through normal-source loss. Distinguish the startup supply and emergency electricity.

    Feros protected reserve

  • Adopted · Feros and Airos

    Keep target and evidence distinct

    Report shaft power, service electricity, combined-cycle efficiency, propeller efficiency and delivered thrust separately. The 12 MW shaft target and Trell’s assumed wired efficiency do not supply a Feros efficiency or thrust measurement.

    Feros efficiency and thrust evidence

  • Adopted · Feros and Airos

    Airos generator boundary

    Airos uses hydrogen-combustion propulsion with an engine-driven SERAT generator. Keep propulsion and electrical output distinct. An installed generator rating and aircraft performance require separate evidence.

    Airos propulsion and generation

  • Model only · Feros and Airos

    Independent temperature reference

    Compare probe spread separately from agreement against a synchronized, independently calibrated reference. Agreement among the three study probes alone cannot show accuracy.

    Feros shore sample comparison

  • Model only · Feros and Airos

    Custody across shore desks

    Record one receiving-desk observation of crossing and a later matching receipt. Early, duplicate and mismatched records cannot complete a second transfer.

    Feros and Airos shore handover

  • Model only · Feros and Airos

    Matched meter windows

    Compare the same run, time window and metering boundary. Source minus SERAT branch is unassigned until other branches, storage and losses are measured.

    Airos ground-service meters

  • Model only · Feros and Airos

    TSC sample acceptance

    Accept a fresh, matching sample with its unit, including a legitimate zero. Altered, missing, duplicate, stale or unitless messages preserve the last accepted reading and its original timestamp. Physical acoustic reception remains open.

    Feros six-case telemetry replay

  • Historical · Historical Earth decisions

    Superseded Feros accommodations

    The 150-berth drawing is archived. R2 briefly removed sleeping quarters. R3 restored quarters beside the mess and kitchen on the middle deck for the 48-person concept.

    Feros R2 and R3 accommodations

  • Historical · Historical Earth decisions

    Earth fusion design freeze

    The earlier freeze retained Integrated Architecture R3 as its reference. Later qualification planning continued to use that history.

    Earth fusion design freeze

Research records and operational safeguards5
  • Adopted · Founder instruction

    Review ZENIT’s own work before outside studies

    Scan the project for prior decisions and work on the question first. Fredrik approves each proposed study. A website release follows its own owner authorization.

    Founder’s project instruction · 23 November 2026

  • Adopted · People and access

    Role and task authorization

    A person’s access rank describes the role. The security level belongs to the area or task. A valid identity still needs a current duty assignment and task authorization. An offline signed record is usable only within its validity period.

    Hierarchy · identity and task checks

  • Model only · Black-start study

    Keep essential services on independent local protection

    Essential loads retain local, uninterrupted supply in the black-start model. Medical and environmental services take precedence over propulsion. Isolate a tripped core from backfeed and reconnect loads in stages.

    SERAT black-start study

  • Model only · Network recovery

    Keep critical safety loops local

    Each critical command or telemetry path needs a fallback. In the network study, central NEXUS loss suspends propulsion and transmission while containment and life support stay local. Return authority in stages after reconciling the actual state.

    NEXUS bus and local protection study

  • Adopted · Research record

    Record an unresolved source discrepancy

    Keep the identifiable historical wording and the newer evidence side by side. The August summary counts 14 original withdrawals and identifies 13. The recovered campaign supports a revised critical interruption of 3.3750%; the earlier 2.941% and separate brownout figures still lack matching data.

    Claims reconciliation and historical source issues

Claims and supporting records

A founder decision documents intent. A software replay shows what happened under its inputs. Physical qualification requires measurements, uncertainty and independent review. The dated public register includes historical records and open discrepancies, including the unidentified fourteenth withdrawal in the August summary.

Search the project claims · Review source coverage · Patent Claims