Follow energy, matter and information through ZENIT’s Earth and Space designs. Rotate a model and select a stage to trace its flows, returns and safety checks.
Energy supplies homes, industry, water services, SafeSpots and mobility. Useful heat and measured feedback return to the system.
Supply energy
Renewables and existing sources supply useful work in the Earth model. Fusion is a future research pathway.
Route through SERAT
SERAT manages protected power distribution and thermal interfaces between sources, storage and services.
Serve communities
Homes, industry, water services and SafeSpots draw on the energy network. The mobility concepts can use conditioned hydrogen where a supply is available.
Recover useful heat
Heat returns to a service when its temperature, timing and quantity match demand. The system accounts for residual heat and losses.
Measure and adapt
LSI, NEXUS and infrared sensing support diagnosis and maintenance. Measured demand and equipment condition inform the next allocation.
Heat return
Recoverable heat can re-enter the service network through a suitable exchange or storage interface.
Feedback
Service and equipment readings inform the next SERAT allocation.
Heating forms plasma inside the vacuum vessel. Shaped coils provide the confinement field in the Earth plant model.
Protect the Fusion Island
The five GENI Inverse Shield boundaries surround the stellarator plasma and govern controlled outward transfers and fault containment. Local reactor protection has independent safety functions.
Extract heat
The primary cooling circuit carries heat through a controlled transfer boundary. Reactor materials remain within the plant’s contained circuits.
Convert and distribute
The SERAT Energy Island supplies the turbine trains and useful-heat interfaces. The grid-scale facility evaluates dry cooling for compatible secondary loads and needs separate heat sinks for the main condenser and shutdown.
Supply qualified services
Qualified output can serve the grid and district heat customers. An optional external electrolysis module can use electricity when the supply permits.
GENI Inverse Shield cutaway
The shield boundaries sit inside the Fusion Island. Primary cooling carries heat to an isolated exchanger, where it transfers to the separate SERAT Energy Island.Open full size ↗Scroll the drawing sideways for its labels.
The Heat-Service Module matches available source heat to a specific customer temperature and demand.
Measure source and demand
Read the source temperature, available heat and required delivery conditions at the declared service boundary.
Choose the heat path
Use isolated direct exchange when the temperature difference supports it. Draw from storage or use a mapped heat pump when appropriate.
Store or deliver
Direct recovered heat can charge the reference store. Available heat is sent to the customer at the defined service temperature.
Meter the balance
Account for delivered heat, storage changes, compressor and auxiliary electricity, backup supply and losses.
Handle demand loss
If the customer stops taking heat, SERAT checks the available rejection path. The Earth Research Facility study uses four independently isolatable 4 MW dry cooler groups. At the assumed rating, one group out leaves 10.8 MW for dispatch after holding 10% in reserve.
Thermal storage
Directly recovered heat can serve a later demand when the store retains sufficient usable temperature and energy.
The engine loop removes heat from the combustion engine. A separate essential thermal loop serves electronics and safety-support loads.
Regulate circulation
Local SERAT control coordinates pumps, fans, bypass valves and sectional isolation using protected auxiliary power.
Recover compatible heat
Useful heat can support cabin warming or preheating when temperature and demand are compatible.
Reject excess heat
Radiators remove heat that the vehicle cannot use. The cooling paths maintain their separate duties.
Cool after shutdown
The design supports post-shutdown cooling and local isolation. Circulation returns to standby after the remaining thermal load is handled.
Coolant return
Each circuit recirculates its own coolant through the components it serves.
ZC-1 SERAT unit schematic
The SERAT drawing shows separate coolant circuits for the engine and essential electronics, with compatible heat routed to cabin warming or preheating.Open full size ↗Scroll the drawing sideways for its labels.
Follow readings across the proposed Earth Research Facility. The cutaway opens the NEXUS and LSI suite and traces links to the SafeSpot services, observation mast and independent safety island.
Measure campus conditions
SafeSpot instruments report water, ventilation and reserve power. The observation mast contributes infrared and environmental readings. Local nodes attach the source identity and measurement time.
Verify incoming readings
A gateway at the NEXUS and LSI suite adapts signals from existing instruments. The verification rack checks source, age, sequence, message integrity and plausibility. It flags stale or conflicting readings for review.
Give operators a local view
NEXUS correlates the readings that pass verification. LSI shows conditions and confidence at the operator consoles. An on-site recorder keeps the readings and decisions for review.
Share regional status
The reporting gateway sends selected facility status over campus fibre or a proposed microwave link at the observation mast. A separate voice radio supports emergency coordination.
Operate through link loss
Both regional data routes are down. Protected SERAT power sustains local monitoring and event recording in this scenario. AXIOM and hardwired protection retain authority for local isolation.
Recheck and reconnect
The operator confirms fresh readings and checks the restored link before resuming regional status reports. The time-stamped outage record stays available for review.
Local protection
The independent safety island issues protective trips on a dedicated circuit. The operations room can see their status in LSI.
Regional reporting
Fibre and microwave carry selected facility status. The operations team can use the separate voice radio for emergency coordination.
The cutaway uses the Earth Research Facility campus geometry. Telemetry equipment placement, routes and the link outage are illustrative.
Step inside the Earth Research Facility’s NEXUS and LSI suite. The cutaway follows SafeSpot and campus readings from the intake racks to the operator desks, the event recorder and regional reporting.
Receive campus readings
The intake cabinet receives local instrument feeds for water, ventilation, reserve power and the surrounding environment. A gateway adapts signals from existing equipment and preserves source identity and measurement time.
Check the evidence
The verification rack checks identity, age, sequence and integrity. NEXUS compares readings with physical limits and independent measurements, then passes on the confidence and any flags.
Read the LSI wall
The shared display groups water, air and reserve-power readings. Each panel shows the condition and the quality of its supporting data, so the operator can spot a change or a missing feed.
Review a stale reading
The water-level reading expires. The console flags its age and holds the affected status update while the operator asks for a fresh sample. AXIOM and hardwired protection remain available through their local paths.
Keep the event record
The protected recorder keeps the source, measurement time, stale-data flag and operator acknowledgement. A later reading adds to the record so the decision can be reconstructed.
Report verified status
After checking a fresh water-level reading, the operator clears the reporting hold. The regional gateway sends the selected facility status through the campus reporting network.
The room is a proposed fit-out of the campus NEXUS and LSI suite. The displays and stale-reading exercise use illustrative data.
Closed loops with low-freezing heat-transfer fluid
Warm
Individually regulated inlet, wing and tail zones
Two physically separated closed secondary loops.
ZA-1 anti-ice fluid routes
Heat crosses the exchanger wall. Each secondary fluid loop has its own supply and return paths for regulated anti-ice zones.Open full size ↗Scroll the drawing sideways for its labels.
Simulation result · Radiator-limited case. Cooling R4 gives Zorak 215.35 MW of available main-loop rejection with one radiator sector offline. After reserve, 193.82 MW is available for dispatch and the bypass fault model supports 1.07 kN of thrust. The separate KETS comparison holds fusion output at 213.19 MW. The archived full-output case exceeds the R4 rejection capacity.
Open Zorak’s R4 cooling rating
Study figures and assumptions
This earlier twin-drive case uses the ZENIT Fusion Working Values workbook and assumes 690,000 tonnes at departure, with 69,000 tonnes of propellant. Cruise speed gained is relative to departure. THD-1A thrust, propellant demand and cooling remain open.
Quantity
Value
Basis
Cruise speed gain
≈9,482 km/h
Equivalent speed in the departure frame.
Jet power and drive losses
45 GW / 30 GW
The study assumes 60% of drive electricity becomes exhaust kinetic power. The rest is counted as onboard heat.
Thrust and initial acceleration
1.80 MN / 2.61 mm/s²
Combined stern drive case at the modeled departure mass.
Exhaust speed and propellant flow
50 km/s / 36 kg/s
The scenario assumes an exhaust speed of 50 km/s relative to Zorak and calculates a propellant flow of 36 kg/s.
Total time under thrust
22.18 days
Departure and braking burns combined. Coasting time is additional.
Outverse electrical draw
Open
The study leaves 35 GWe after the propulsion allocation. The share needed for cooling, shield coils and other onboard loads remains open.
Outverse single-sector cooling
25 kW thermal
An earlier shield trial assumed this heat removal rate and a 25 kJ thermal buffer for one sector.
Historical fleet cruise target
0.01c (≈2,998 km/s)
Routine target from the separate 24 July formation concept. Feasibility remains open.
Each core heats onboard fuel into plasma and confines it with magnetic fields. Conversion equipment supplies conditioned electricity to the core’s power lane. Each core has independent shutdown and cooling.
Local Fuse A and B
Each source feeds its own Local Fuse Chamber. If a core trips, its chamber isolates the affected feed. Available output and cooling determine which loads the remaining lane can support.
Central Bidirectional Fuse
The central assembly coordinates the two feeds. Its separate protected lanes carry the available electrical output into the SERAT Power Corridor.
Separate SERAT trunks
SERAT checks available electrical power and cooling before releasing a propulsion allocation. The shield reserve and its coil drivers have a separate feed. Four main cooling chambers and two independent crew cooling chambers feed radiator panels that fold into separate hull bays. A shortage can reduce or hold a drive request.
Vector Accelerator
GENI coordinates the thrust request using the Central Magnetic Core reference. AXIOM retains final authority. The Vector Accelerator conditions the permitted electrical feed to the centreline corridor.
THD-1A centreline drive
The model shows a single corridor with a cyan stern outlet and amber bow outlet. Stern exhaust produces forward thrust. Bow exhaust produces braking thrust. The changeover waits for neutral readback and the burn ends at the confirmed stop.
Accelerate, coast, brake
After departure, Zorak can coast with both outlets idle while the reactors power ship systems. The arrival burn uses the bow outlet after a confirmed neutral interval.
Shield branch
SERAT supplies the coil reserve and local drivers, which power the distributed Outverse hull coils.
Reference and feedback
CMC supplies timing and a reference for coordination. NEXUS returns readings from the drives, hull and coils to GENI.
Onboard fusion supports long-duration operation while the fuel and cooling budgets allow. In the jet propulsion study, the drives also need their own propellant. Endurance depends on the available reserves and how much thrust the voyage requires.
Zorak propulsion and shield schematic
Separate SERAT feeds supply THD-1A and the Outverse coils. CMC provides timing to GENI. NEXUS receives the drive and field readings.Open full size ↗Scroll the drawing sideways for its labels.
Inspect the proposed defensive bay and its Weapon Fuse Chamber. Follow a simulated local review, trace electrical power to an inert test load, and see how the feed isolates after a fault.
Electrical test example · Assumed inputs
Isolated supply draw
15 kW
Inert test load
12 kW
Conversion heat
3 kW
Study figures and assumptions
The example assumes a steady 80% electrical conversion efficiency for two seconds. It illustrates branch power and energy accounting. Weapon output and the actual electrical draw of the defensive systems remain open.
Quantity
Value
Basis
Test interval
2 s
Selected for this electrical example.
Electrical energy supplied
30 kJ
24 kJ reaches the inert load and 6 kJ goes to conversion heat.
Zorak kinetic impact
100 kJ per hit
Assigned energy in the 6 November meteoroid simulation.
Energy transferred to the meteoroid
50 kJ
The scenario credited half of Zorak’s assigned hit energy to the target.
Power at impact
Open
The simulation gives no contact duration. A physical result would require measurements of both energy transfer and duration.
Review the local request
The vessel crew reviews the defensive request with data from NEXUS. Zorak can share status and coordinate with the fleet. Each vessel retains control of its own permission.
Check the permit
The simulation checks ZSA test scope, fresh local evidence and AXIOM’s authority. The modeled test circuit starts isolated and holds whenever a required condition is uncertain.
Inspect the isolation chamber
The dedicated Weapon Fuse Chamber protects the defensive branch. Its isolation boundary keeps faults within the branch and protects propulsion, the reactor, core SERAT distribution and essential life support.
Inspect the defensive modules
The schematic shows ZDE (Directed Energy Emitter), ZVI (Vector Interdiction System), point defence, the kinetic module and ZECM (electronic countermeasures). The symbols show how they relate to the isolated branch.
Meter the inert test load
This stage traces the isolated supply through the Weapon Fuse Chamber to a dummy load. Compare power entering the branch, power delivered to the load and heat from conversion.
Isolate and verify
On a modeled fault, the permit is withdrawn and the branch opens. Independent local feedback confirms its state. The event goes to the protected recorder for ZSA review before another test can be authorized.
Local authority
NEXUS supplies evidence. ZSA authorizes tests, and AXIOM retains the final physical veto.
Independent confirmation
Uncertain isolation feedback keeps the modeled branch on hold. The recorder retains the evidence for review.
Schematic placement and electrical figures are illustrative. The fleet qualification record covers logic and isolation in simulation. Vessel hardware and effector performance require physical qualification.
How could Zorak’s twin reactors power a long voyage? A proposed fuel loop recovers what the plasma did not use. Onboard stock replaces what fused or could not be reused.
Load and check the reserve
Before departure, record the verified fresh fuel and set aside a contingency reserve. Compare the available stock with the next leg’s expected demand. If it falls short, reduce planned power use or arrange a measured transfer at a compatible supply depot.
Meter both feeds
Each core would have its own metered feed and isolation. Verified recovered fuel joins fresh fuel at the feed. Vacuum, magnetic confinement, primary cooling and local protection must be ready before a core admits fuel.
Run Fusion A and B
Heating forms a plasma inside each core. Magnetic coils confine it. Some of the fuel nuclei fuse and release energy. The sealed exhaust system collects unburned fuel, ash and impurities from the plasma.
Recover unburned fuel
A proposed processor separates and checks the unburned fuel before sending it back to the feed. Ash and unsuitable material remain contained. A failed check isolates the affected return. If safe containment or verified fuel supply cannot be maintained, the affected core shuts down.
Convert fusion energy
A closed primary cooling circuit carries heat to the conversion equipment. Conversion produces electricity, and a heat-rejection path carries away the remaining heat. Fuel and exhaust stay inside the reactor’s process circuits.
Send power to SERAT
Conditioned electricity travels from each core through its Local Fuse and the corresponding lane of the Central Bidirectional Fuse to SERAT. SERAT routes propulsion power through the Vector Accelerator to the stern drives, with separate feeds for other ship systems.
Fuel return
Verified unburned fuel circulates back into the metered feed. The crew tracks both fresh stock and material held in the recovery equipment.
Drive propellant
The jet propulsion study budgets reaction mass separately. That is the material the drive would expel to push the ship.
Try the fuel balance
For every 100 units fed into a core, this example assumes 2% is consumed in fusion.
The rest goes to recovery. The units show proportions for one pass at steady operation.
Returned to the feed
93.1
Consumed in fusion
2.0
Held or removed from the loop
4.9
Fresh fuel for the next pass
6.9
Fresh stock covers the fuel consumed plus any unburned fuel held or removed from the loop.
Even at full recovery, the next pass needs 2 fresh units in this example.
The model illustrates a proposed fuel-recovery loop for each core, based on the CORAC study. Zorak’s fuel mix, recovery equipment, and time between resupply stops remain open design questions.
Explore the Qi Vanguard flagship’s proposed Telemetry Coordination Chamber (TCC). The deck cutaway shows the crew consoles, independent bus feeds, communications and protected recorder next to a mission operations passage.
Receive both bus feeds
The primary and secondary System Buses enter at separate interfaces. The QFTU-7 checks the readings and passes eligible reports and quality flags to the chamber.
Cross-check vessel health
The diagnostic console shows NEXUS assessments of vessel systems alongside the readings that support them. The crew can review conflicts and check the age of the evidence.
Read AXIOM authority
The centre console displays AXIOM’s authority state. In this example, AXIOM shows HOLD for a proposed change while a coolant reading is stale. The TCC crew can review the evidence. AXIOM retains physical authority.
Send fleet status
The communications console prepares selected, verified status for the Fleet State Package. The crew checks the recipient and link before sending the package.
Use the backup link
The primary outbound link drops. The crew checks the secondary conventional link before resuming status reports. Local bus monitoring and the independent safety path stay active in this scenario.
Reconstruct the event
The protected recorder retains the readings, AXIOM status and link change with timestamps. The crew can review their order at the reconstruction station while reporting continues over the backup link.
This proposed Zorak deck layout uses the original TCC positioning principles. The displays and link-loss exercise use illustrative data.
Follow the air the crew breathes through an Anorak-based cutaway. Trace the return ducts, see how the ship removes carbon dioxide and adds oxygen, then isolate a compromised zone.
Collect cabin air
Fans draw air back from occupied zones. Local sensors track oxygen partial pressure, carbon dioxide, cabin pressure, humidity, temperature and contaminants. NEXUS compares readings across zones and flags uncertain data.
Filter and scrub
Particle filters catch dust and aerosols. Trace-gas treatment and regenerable scrubbers remove contaminants and crew-exhaled carbon dioxide. The scrubbers send captured CO₂ to separate handling.
Recover water and heat
A cooling coil condenses moisture from the return air. The condensate goes to water treatment and quality checks. A sealed exchanger transfers cabin heat to SERAT while keeping cabin air and coolant in separate circuits. The plant adjusts humidity and supply temperature as needed.
Replenish breathable gas
In the fleet concept, a powered electrolyser can split verified water into oxygen and hydrogen. Oxygen enters the treated-air supply through a controlled feed. Hydrogen goes to a separate handling path. Stored oxygen provides backup, and a separate buffer-gas reserve supports pressure recovery after a leak is isolated.
Distribute and verify
Zone air-handling units recirculate treated air through habitation, command, and other occupied spaces. Anorak’s concept includes separate clean airflow for research and controlled ventilation for medical isolation and airlocks. Local instruments verify conditions before a zone returns air to the shared loop.
Isolate and restore
Local protection closes the laboratory’s supply and return. In this example, essential power keeps air circulating through the intact refuge, where stored oxygen is available as needed. Verify the fault is cleared and air quality and pressure are stable before reconnecting the laboratory.
Water recovery and oxygen
Cabin condensate joins the vessel’s life-support water treatment stream. The electrolyser uses verified water from a conditioned supply. Loop C keeps its dedicated hull-shield water inventory.
Protected services and heat
The proposed essential electrical feed supports ventilation, sensors and carbon dioxide removal. The electrolyser draws electricity when scheduled. A protected coolant loop carries heat from the sealed exchanger to external radiators. Cooling and reserve sizing depend on the crew, the refuge volume and the expected outage.
Carbon dioxide and botanical zones
The early fleet design includes a botanical section that can use some CO₂ where fitted. The mechanical scrubbers and verified oxygen supply remain the baseline. Captured gas and hydrogen each require a controlled recovery, storage or discharge path.
Fit to vessel and duty
The flagship and research ships can have several zones. Carrier refuge sizing includes crews from docked craft, and Norak’s includes passengers. Interceptors and shuttles need their own cabin protection for independent sorties, with a verified host interface where fitted.
This conceptual cutaway follows Anorak’s earlier atmosphere-management layout. NEXUS supervises, local protection can isolate a zone, and AXIOM retains final physical authority. ZSA qualifies the design. Airflow, gas inventories, electrical draw and endurance require vessel-specific verification.
The Integrated Hull Water Matrix (IHWM) routes shield water through Loop C to segmented cells around occupied areas. The retained water provides passive shielding.
Eligible wastewater and condensate pass through the vessel’s treatment and verification stages. Approved make-up water can enter the isolated Loop C filling interface.
Charge the Loop C reserve
The dedicated reserve supplies Loop C through its own manifold. Potable, hygiene, reactor cooling and emergency cooling circuits have separate fluid paths.
Fill the shielding cells
Protected branches fill segmented cells within the hull envelope around crew spaces and the assigned storm refuge. Water Control Center tracks fill and available reserve by zone.
Retain water and circulate
Water mass along exposure paths provides the shielding. Normal circulation can condition the water or equalize temperature. Filled, isolated cells retain their water during a pump or power loss.
Isolate a damaged branch
Local valves isolate a leak and retain water in the other cells. Collect suspect water in a sealed holding tank and flag the affected zone’s coverage for reassessment.
Verify coverage and restore
Confirm cell integrity, retained fill and exposure paths before returning a zone to the available refuge list. NEXUS supervises, AXIOM can hold operation, and ZSA owns qualification.
Shield-water return
Loop C returns conditioned water to its own reserve. Drawdowns and transfers must preserve the required fill around occupied zones.
SERAT heat exchange
A dedicated exchanger can transfer heat to the SERAT thermal path. Each fluid circuit stays isolated.
Crew dose and the required water depth depend on the vessel layout, the retained fill and the radiation environment. The vessel fits are design models with dose qualification pending.
Loop C refuge section
Supply and return valves can isolate a damaged branch while other cells retain water. The exchanger transfers heat across a boundary between the Loop C and SERAT fluids.Open full size ↗Scroll the drawing sideways for its labels.
Hull and field sensors report changes. NEXUS maps the reading and its location and marks missing readings as unassessed.
Locate the affected regions
Use the layer and sector map to identify the relevant addresses. The five layers run from L5 outside to L1 inside.
Check reference and reserve
GENI checks the accepted CMC reference and SERAT’s available power, reserve and cooling before coordinating a request.
Drive permitted coils
Local drivers regulate the distributed coils for the permitted field settings. AXIOM can veto the response.
Measure and inspect
Compare requested and measured field behaviour and monitor hull condition. Physical inspection can confirm a suspected impact or damage.
Recover the reserve
Use the qualified coil-energy recovery or discharge path. Account for remaining heat, recharge and residual exposure before the next request.
Sensor feedback
Field, thermal and hull readings feed the next GENI request through NEXUS.
The region map describes control geometry. Physical protection ratings require measured qualification.
Outverse 25-region map
Each layer uses five hull sectors. A region address identifies both its layer and sector, such as L5-FOR for the outer Fore region.Open full size ↗Scroll the drawing sideways for its labels.
The lunar plant meters fuel, recovers verified unburned material and sends conditioned electricity to SERAT.
Prepare the plant
Confirm vacuum, containment, verified fuel, confinement field, primary cooling and local protection while the SERAT tie is isolated.
Establish plasma
Admit metered fuel and heat it in the vessel. Confirm plasma conditions, exhaust handling and heat removal before connecting to SERAT.
Recover unburned fuel
The sealed exhaust cell checks recovered fuel before reuse. Reaction products, impurities and retained material stay in the accounted inventory.
Deliver power and reject heat
The closed primary loop transfers heat to conversion. Conditioned electricity reaches SERAT. The secondary hot loop feeds three independently isolatable lunar radiator banks. The refuge has a separately sized cooling and backup power path.
Stop or isolate
Stop feed and heating, isolate the affected circuit and open the SERAT tie. Independent local protection manages remaining field energy and heat.
Fuel return
Verified recovered fuel joins fresh make-up fuel at the metered feed.
Inspect support, access to connections, sensor mounts and the removal path on the unpowered article.
Verify electrical and sensor checks
Record continuity, insulation, probe positions and sensor calibration before controlled bench characterization.
Measure field and heat
Record repeatable field and temperature measurements with their inputs, positions and uncertainty.
Exercise local protection
Under ZSA-authorized tests, verify local isolation, discharge and recovery when feedback, cooling or supervision is lost.
Study coupling
Compare combined results from a second article with the separate measurements. Feed the field and heat evidence into the proposed site layout.
Design feedback
Measured clearances, field maps and thermal traces inform the next installation and control review.
CORAC coil-fit bench
Concept view of the unpowered fit check on Earth. Inspect the copper winding, support, disconnected leads and the separate field-probe mount.Open full size ↗
Six phases trace a proposed planetary-cruiser landing, from acquisition of the landing base to mechanical support.
Acquire
Identify the landing datum and establish a cleared approach route with the vessel’s guidance and propulsion available.
Align
Hold at stand-off. Verify route, pose and supported approach before closing the gap.
Near-pad hold
Keep support onboard while verifying the coupling profile and available resources at the checkpoint.
Capture entrance
In the nominal study, measured support from the base rises as onboard support falls. A failed check holds the transfer.
Stopped
After the modeled stop, reduce support to the parked load and transfer it into the mechanical cradle.
Parked
Verify seating before handing the parked load to mechanical support. The source demonstration distinguishes this from flight and contact qualification.
The Earth landing study applies to planetary cruisers such as Norak. Interceptors and Qi shuttles operate in space.
AGCM verifies route and docking geometry before the fleet commits to acceleration or a close approach.
Establish the reference
Bring guidance observations into a consistent reference frame with timestamps and declared uncertainty.
Verify the route
AGCM checks geometry, coordinate history and route legitimacy. Confirm resource margins and local safety conditions.
Align and approach
Use available propulsion within the pair’s approach envelope. Check fresh host-port translation and rotation in the agreed local approach frame, separately from visitor closing speed. When using the SFP-Min study protocol, GENI checks carrier and phase throughout the authorized window.
Hold or hand over
Hold for stale or excessive port motion, unresolved geometry, thermal limits or loss of lock. In the Trell replay, a 6° phase slip withdraws gate permission and returns the visitor to DOCK-HOLD. A retry requires a fresh authorized window.
Record measured state
Record observed alignment and independent capture confirmation. After DOCKED, verify each mission-required service, both vessels’ reserves and the receiver’s cradle and store. For a sample, match its crossing and receipt to the collection and lab record.
Guidance return
Updated measurements feed AGCM’s next route and alignment check.
Centri hosts the IT-Driver research interface and the FCMC-1 fleet readiness check. Zorak retains strategic command.
Define the research question
Record the proposed effect, what evidence could identify it and which mechanism details remain open.
Check each vessel through FCMC-1
Centri compares independent readbacks for the active formation and correction. The exercise holds for any out-of-limit vessel, missing or stale evidence, local AXIOM veto or loss of SERAT margins.
Review the evidence
Track study results and unresolved assumptions in the IT-Jump project record. The public record describes the project and role assignment.
IT-Jump is a long-term study. A controlled operating sequence awaits a detailed specification.
Explore the Qi Fleet Telemetry Unit cutaway. Follow a reading from the vessel’s sensors through the ZTIA checks, then see how it reaches operators, the event recorder and local safety systems.
Distributed vessel sensors and local nodes send readings such as coolant flow, pressure and position over the System Bus. The QFTU-7 receives the readings at its bus and sensor interfaces.
Identify and timestamp
Attach source identity, capture time, sequence number, expiry and a quality flag. A reading can look normal even after its time limit has passed.
Check integrity and plausibility
The concept has primary and secondary processing cores. Compare critical reports with independent sensors and physical limits. Flag stale or conflicting readings and quarantine suspect packets.
Route and interpret
The priority router distributes eligible reports. NEXUS interprets the evidence and reports its confidence. Selected status can be bundled into a Fleet State Package for authorized recipients.
Record the event
An isolated write path takes event data from the buffer to the protected event recorder. Keep the reading, its quality flags and the decision trace available for review.
Apply local safety limits
AXIOM validates any proposed physical action and local protection can act during link loss. The QFTU-7 provides monitoring and data. Record the local outcome and check fresh readings before restoring restricted operation.
Protected recording
The router sends event data through the buffer to the recorder on its isolated write path.
Local protection and feedback
Local sensors and safety controllers remain available to the equipment during a telemetry link loss. Fresh measurements go through the same checks on the next cycle.
The cutaway uses schematic geometry from the QFTU-7 design concept. Hardware and communications qualification remain open.
Original QFTU-7 cutaway
Original Qi Fleet Telemetry Unit concept artwork. Labels and specifications in the drawing are design proposals.Open full size ↗Scroll the drawing sideways for its labels.
The Qi fleet, Earth facilities and CORAC use isolated coolant branches and the same checks for heat load, remaining capacity and backup power. The final heat sink depends on the operating environment.
Collect the heat
Closed loops collect heat from propulsion, power conversion, science loads and occupied spaces. Essential crew and facility services have protected branches.
Transfer through an isolated exchanger
Heat crosses a sealed exchanger into a separate rejection loop. SERAT checks the receiving temperature and capacity before routing useful heat to a customer.
Reject heat to the environment
In vacuum, radiator panels need a verified view to space. On Earth, fans move outdoor air over dry cooler coils that carry secondary coolant.
Isolate a fault and derate
Local protection isolates the affected branch. SERAT checks remaining heat rejection, backup power and available storage, then recommends a lower load or HOLD when essential cooling falls short. NEXUS records the event and AXIOM retains the physical veto.
Coolant return
The cooled liquid returns through the same sealed loop. The hull-water circuit can exchange heat across its own exchanger and retain the water needed for passive shielding.
Zorak chambers
Four 28 × 16 × 8 m main chambers and two 12 × 8 × 5 m crew chambers feed separate fold-out panel bays. These dimensions reserve space in the proposed hull layout.
Earth and Moon
Earth Research screens four 4 MW dry cooler groups. Earth Fusion evaluates a dry branch for compatible secondary loads. CORAC uses fixed radiators and a protected refuge branch.
ZENIT checks identity, current duty assignment and the safety state before releasing a restricted operation.
Verify identity
Qi Fleet vessels validate crew eID locally. Earth SafeSpots use national eID for the first operator requesting activation.
Check assigned access
Check the current duty, qualification, credential status and required local procedure. Some critical work also requires an assigned key and AXIOM approval.
Use local power while available
The local reader can continue using current signed records while emergency power is available. Expired records hold new restricted requests.
Apply the manual procedure
During full power loss, designated mechanical releases support refuge and evacuation. Assigned crew use the local roster and authorized keys where the procedure permits.
Confirm safe restoration
Verify hatch conditions and local safety state. Restore critical operation only after the required checks and AXIOM approval.
Follow a stream across linked models. Each row identifies the working material that can return, the flow that crosses the system boundary, and the measurement or check that lets ZENIT’s concept account for it.
Heat passes through an exchanger to the SERAT Energy Island. The conversion train sends electricity and useful heat to users and rejects the remaining heat.
Compare plasma heating and losses with the plant’s electrical loads and export. Two fusion power balances