Skip to content
EARTH & SPACE / PROGRAM ATLAS

ZC-1 electronics cooling study

How SERAT responds to cooling loss

When coolant flow drops, a circuit can have enough electricity and still overheat. In the ZC-1 study, SERAT checks whether the dedicated electronics loop can remove the heat from essential equipment before recommending an optional load.

Cooling-loss simulation results

Scenario inputs · 120 W essential + 180 W optional

  • Optional load shed at 4 s
  • Optional load stays on
  • 60°C study limit

Coolant flow drops

With optional demand shed, simulated temperature peaks at 47.2 degrees Celsius at 120 seconds. With optional demand still running, the model reaches 60 degrees Celsius at 46.2 seconds.
The essential load stays within the study limit, peaking at 47.2°C. With the optional load left on, the model reaches 60°C at 46.2 s.

The pump stops

With the pump stopped, simulated temperature reaches 60 degrees Celsius at 29.3 seconds with both loads and 77.7 seconds when the optional load is shed.
Shedding extends the modeled time to the limit from 29.3 s to 77.7 s, a gain of 48.4 s. SERAT reports HOLD at the 4 s fault evaluation.

When does SERAT hold?

SERAT checks available power, usable reserve energy and cooling together. When essentials fit and the full load exceeds a limit, SERAT can recommend shedding optional demand and report DERATED. If essentials alone exceed a limit, or if coolant readings expire, it reports HOLD and blocks new requests. Independent local protection handles trips, and AXIOM retains the physical veto.

When can the load return?

In the reduced-flow case, normal flow returns at 120 s. SERAT readmits the optional load at 146 s, after verified cooling, temperature and reserve checks. A separate run shows that a ten-second recovery is too brief for readmission under the study rules.

Study inputs and model scope

The study begins at 37.5°C with a 25°C coolant inlet. It uses assumed cooling conductance for reduced flow and pump stop and applies the advised shed immediately at the 4 s report. The curves show modeled equipment temperature. Physical testing must establish the actual cooling response and the time from fault detection to confirmed load reduction.

Study reference · ZENIT SERAT Cooling-Loss Study R1, 13 November 2026.