EARTH & SPACE / PROGRAM ATLAS

Model Atlas

Explore ZENIT’s Earth and Space designs in 3D, from hydrogen vehicles and fusion facilities to the Qi fleet.

NorakQAC-1 planetary cruiser

Browse models

35 models

Models depict proposed architecture and system relationships. Physical performance and qualification depend on the evidence in each project record.

System maps

Select a diagram to inspect each system and its connections.

THE DIAGRAM COLLECTIONR2 / 10 NOV 2026
01 / SHARED DIAGRAM

One programme. Two connected branches.

Start with the Earth and Space programmes, then follow their main areas of work.

Select a block to explore its role
One programme. Two connected branches.Start with the Earth and Space programmes, then follow their main areas of work. A programme map groups areas of work. Its connectors describe scope, not energy transfer or a chain of physical command.THE ZENIT PROGRAM: The ZENIT Program is the common project framework. Its Earth and Space branches share named principles and system roles, while retaining distinct application requirements.01 / POWERTHE ZENITPROGRAMEarth + Space architectureZENIT Earth Program: Earth brings together energy, hydrogen mobility, infrastructure and environmental understanding. Earth plant and vehicle requirements are not automatically Space requirements.02 / POWERZENIT EarthProgramEnergy · mobility · infrastructureZENIT Space Program: Space brings together the Qi Vanguard Fleet, vessel systems, scientific exploration and long-term research concepts. The diagrams describe the project architecture, not operational spacecraft.03 / DATAZENIT SpaceProgramExploration · vessels · researchEnergy & useful heat: The Earth facility uses a single-core planning baseline and separates the Fusion Island from the SERAT Energy Island. Useful heat recovery needs compatible temperatures, demand and a retained rejection path.04 / POWEREnergy &useful heatFusion Facility · SERATHydrogen mobility: ZC-1, ZA-1 and the marine concepts apply hydrogen-focused mobility within their own operating and safety requirements. The current ZC-1 drivetrain reference is hydrogen combustion.05 / POWERHydrogenmobilityRoad · air · marine conceptsInfrastructure & knowledge: Infrastructure work covers human-readable information, sensing, essential services and resilience. LSI explains system state; it does not replace independent safety authority.06 / DATAInfrastructure& knowledgeLSI · sensing · resilient servicesQi Vanguard Fleet: The current planning register has 17 crewed entries: Zorak, Centri, three research vessels including Ranok in reserve, three carriers, eight interceptors and Norak. The R3 register assigns 62 drones across Zorak, Anorak, Fronak and Norak.07 / DATAQi VanguardFleetFlagship · carriers · researchVessel power & reference: Fusion provides primary energy; protected fuse stages and SERAT distribute it. CMC provides the vessel reference and GENI handles field-control interfaces. These roles remain separate.08 / FIELDVessel power& referenceFusion · SERAT · CMC · GENIShielding & exploration: The Outverse reference uses five concentric layers across five controlled hull sectors, for 25 coordinated regions. Propulsion, shielding and advanced travel concepts retain their stated evidence and qualification limits.09 / FIELDShielding& explorationOutverse · navigation · science
Scope / physical relationship

Swipe across the diagram to explore it, or open the full-size view.

SELECTED SYSTEM

THE ZENIT PROGRAM

The ZENIT Program is the common project framework. Its Earth and Space branches share named principles and system roles, while retaining distinct application requirements.

Read the complete text version
  1. THE ZENIT PROGRAM

    The ZENIT Program is the common project framework. Its Earth and Space branches share named principles and system roles, while retaining distinct application requirements.

  2. ZENIT Earth Program

    Earth brings together energy, hydrogen mobility, infrastructure and environmental understanding. Earth plant and vehicle requirements are not automatically Space requirements.

  3. ZENIT Space Program

    Space brings together the Qi Vanguard Fleet, vessel systems, scientific exploration and long-term research concepts. The diagrams describe the project architecture, not operational spacecraft.

  4. Energy & useful heat

    The Earth facility uses a single-core planning baseline and separates the Fusion Island from the SERAT Energy Island. Useful heat recovery needs compatible temperatures, demand and a retained rejection path.

  5. Hydrogen mobility

    ZC-1, ZA-1 and the marine concepts apply hydrogen-focused mobility within their own operating and safety requirements. The current ZC-1 drivetrain reference is hydrogen combustion.

  6. Infrastructure & knowledge

    Infrastructure work covers human-readable information, sensing, essential services and resilience. LSI explains system state; it does not replace independent safety authority.

  7. Qi Vanguard Fleet

    The current planning register has 17 crewed entries: Zorak, Centri, three research vessels including Ranok in reserve, three carriers, eight interceptors and Norak. The R3 register assigns 62 drones across Zorak, Anorak, Fronak and Norak.

  8. Vessel power & reference

    Fusion provides primary energy; protected fuse stages and SERAT distribute it. CMC provides the vessel reference and GENI handles field-control interfaces. These roles remain separate.

  9. Shielding & exploration

    The Outverse reference uses five concentric layers across five controlled hull sectors, for 25 coordinated regions. Propulsion, shielding and advanced travel concepts retain their stated evidence and qualification limits.

Connections

  • THE ZENIT PROGRAM → ZENIT Earth Program (Scope / physical relationship)
  • THE ZENIT PROGRAM → ZENIT Space Program (Scope / physical relationship)
  • ZENIT Earth Program → Energy & useful heat (Scope / physical relationship)
  • ZENIT Earth Program → Hydrogen mobility (Scope / physical relationship)
  • ZENIT Earth Program → Infrastructure & knowledge (Scope / physical relationship)
  • ZENIT Space Program → Qi Vanguard Fleet (Scope / physical relationship)
  • ZENIT Space Program → Vessel power & reference (Scope / physical relationship)
  • ZENIT Space Program → Shielding & exploration (Scope / physical relationship)
02 / SHARED DIAGRAM

Information, control and independent safety.

See how NEXUS, AXIOM, ZSA and local protection have different responsibilities.

Select a block to explore its role
Information, control and independent safety.See how NEXUS, AXIOM, ZSA and local protection have different responsibilities. Dashed red denotes acceptance/configuration oversight, not a real-time data bus. The independent Earth protective-trip path can act without supervisory permission.limits / holddirect protective actionSensors & telemetry: Measurements carry identity, timing and quality information. Missing, stale or conflicting data must remain visible; a received message is not automatically an authorized command.01 / DATASensors &telemetryObservations with quality flagsNEXUS: NEXUS interprets telemetry, supports diagnosis and recommends coordinated action. It cannot override AXIOM, ZSA acceptance or autonomous local protective trips.02 / DATANEXUSSupervisory digital twinLocal controllers: Local controllers apply accepted configuration and operating limits. Supervisory requests remain constrained by the local protection design and AXIOM's permitted envelope.03 / SYSTEMLocalcontrollersConstrained operation requestsPhysical systems: Physical equipment is the controlled system. Its safety case depends on its actual configuration and evidence, not the completeness of a digital diagram.04 / POWERPhysicalsystemsPlant · vehicle · vesselZENIT Safety Authority: ZSA owns independent test authorization, hazard-log and anomaly closure, configuration control and final acceptance. This is a governance and evidence role, separate from real-time supervision.05 / SAFETYZENIT SafetyAuthorityTest acceptance & configurationAXIOM: AXIOM retains final physical constraint authority in the framework. In the Earth magnet-protection baseline it may impose a more conservative hold, but may not block an autonomous protective trip.06 / SAFETYAXIOMPhysical constraints & safe holdIndependent local protection: The Earth qualification baseline requires local protection to act without NEXUS or the plant network. The later SERAT requirements preserve that independent trip path; AXIOM cannot suppress a required autonomous trip.07 / SAFETYIndependentlocal protectionAutonomous protective actionPeople & LSI: LSI and human-facing views explain measurements, uncertainty and consequences. They support understanding and decisions without acquiring an independent right to defeat protection.08 / DATAPeople & LSIHuman-readable understanding
Information / control requestAcceptance / configuration oversightScope / physical relationshipIndependent protection / constraint

Swipe across the diagram to explore it, or open the full-size view.

SELECTED SYSTEM

NEXUS

NEXUS interprets telemetry, supports diagnosis and recommends coordinated action. It cannot override AXIOM, ZSA acceptance or autonomous local protective trips.

Read the complete text version
  1. Sensors & telemetry

    Measurements carry identity, timing and quality information. Missing, stale or conflicting data must remain visible; a received message is not automatically an authorized command.

  2. NEXUS

    NEXUS interprets telemetry, supports diagnosis and recommends coordinated action. It cannot override AXIOM, ZSA acceptance or autonomous local protective trips.

  3. Local controllers

    Local controllers apply accepted configuration and operating limits. Supervisory requests remain constrained by the local protection design and AXIOM's permitted envelope.

  4. Physical systems

    Physical equipment is the controlled system. Its safety case depends on its actual configuration and evidence, not the completeness of a digital diagram.

  5. ZENIT Safety Authority

    ZSA owns independent test authorization, hazard-log and anomaly closure, configuration control and final acceptance. This is a governance and evidence role, separate from real-time supervision.

  6. AXIOM

    AXIOM retains final physical constraint authority in the framework. In the Earth magnet-protection baseline it may impose a more conservative hold, but may not block an autonomous protective trip.

  7. Independent local protection

    The Earth qualification baseline requires local protection to act without NEXUS or the plant network. The later SERAT requirements preserve that independent trip path; AXIOM cannot suppress a required autonomous trip.

  8. People & LSI

    LSI and human-facing views explain measurements, uncertainty and consequences. They support understanding and decisions without acquiring an independent right to defeat protection.

Connections

  • Sensors & telemetry → NEXUS (Information / control request)
  • NEXUS → Local controllers (Information / control request)
  • Local controllers → Physical systems (Scope / physical relationship)
  • AXIOM → Local controllers (Independent protection / constraint)
  • ZENIT Safety Authority → AXIOM (Acceptance / configuration oversight)
  • NEXUS → People & LSI (Information / control request)
  • Independent local protection → Physical systems (Independent protection / constraint)
03 / EARTH DIAGRAM

One core. Two distinct islands.

Follow the planning-level electricity and useful-heat interfaces of the Earth facility.

Select a block to explore its role
One core. Two distinct islands.Follow the planning-level electricity and useful-heat interfaces of the Earth facility. Functional interfaces, not a construction drawing. Electrical and thermal outputs need a common energy ledger. Planning targets are not measured plant performance.FUSION ISLANDSERAT ENERGY ISLANDcompatible rejected heatlocal protective pathSingle plasma fusion core: One steady-state stellarator-derived core confines fuel plasma. Heat transfers from reactor components to the conversion interface. The thermal design target is 5.30 GW.01 / POWERSingle plasmafusion core5.30 GWth design targetElectrical conversion: Conversion is shown as a functional interface rather than a selected thermodynamic cycle or machine. Its detailed hardware, efficiency and qualification require evidence.02 / POWERElectricalconversionFusion Island interfaceSERAT protected distribution: SERAT manages protected distribution and thermal interfaces from its separate Energy Island. Island separation includes ownership, fault containment and compatible indirect interfaces.03 / POWERSERAT protecteddistributionSeparate Energy IslandGrid & useful loads: The 2.00 GWe grid value is the facility's planning target. The new power/thermal upgrade does not establish a higher plant rating or measured savings.04 / POWERGrid &useful loads2.00 GWe planning targetCompatible heat source: Heat recovery begins with an actual source/sink inventory. Record temperature, timing, fluid, pressure and available heat before choosing direct exchange or a heat-pump temperature lift.05 / HEATCompatibleheat sourceTemperature & duty recordedIsolating heat exchange: Use compatible, owned indirect interfaces across the Fusion/SERAT boundary. A heat pump is conditional on a useful demand and its full electrical and auxiliary input; no universal COP is assigned.06 / HEATIsolating heatexchangeDirect exchange / qualified liftUseful heat customer: Credit useful heat at the customer boundary. Match supply to demand and required delivery/return temperatures, and avoid counting one recovered stream twice.07 / HEATUseful heatcustomerMeter heat actually deliveredRejection or source derating: Retain a qualified rejection or source-derating route when useful demand, a pump or a recovery interface is unavailable. Internally moving heat does not make it disappear.08 / HEATRejection orsource deratingRetained fallback pathIndependent plant protection: Quench protection, fuel-cycle requirements and independent ZSA acceptance retain their own evidence gates. The power/thermal addendum does not close physical qualification.09 / SAFETYIndependentplant protectionWP3 gates remain open
Heat transferElectrical / power interfaceIndependent protection / constraint

Swipe across the diagram to explore it, or open the full-size view.

SELECTED SYSTEM

Isolating heat exchange

Use compatible, owned indirect interfaces across the Fusion/SERAT boundary. A heat pump is conditional on a useful demand and its full electrical and auxiliary input; no universal COP is assigned.

Read the complete text version
  1. Single plasma fusion core

    One steady-state stellarator-derived core confines fuel plasma. Heat transfers from reactor components to the conversion interface. The thermal design target is 5.30 GW.

  2. Electrical conversion

    Conversion is shown as a functional interface rather than a selected thermodynamic cycle or machine. Its detailed hardware, efficiency and qualification require evidence.

  3. SERAT protected distribution

    SERAT manages protected distribution and thermal interfaces from its separate Energy Island. Island separation includes ownership, fault containment and compatible indirect interfaces.

  4. Grid & useful loads

    The 2.00 GWe grid value is the facility's planning target. The new power/thermal upgrade does not establish a higher plant rating or measured savings.

  5. Compatible heat source

    Heat recovery begins with an actual source/sink inventory. Record temperature, timing, fluid, pressure and available heat before choosing direct exchange or a heat-pump temperature lift.

  6. Isolating heat exchange

    Use compatible, owned indirect interfaces across the Fusion/SERAT boundary. A heat pump is conditional on a useful demand and its full electrical and auxiliary input; no universal COP is assigned.

  7. Useful heat customer

    Credit useful heat at the customer boundary. Match supply to demand and required delivery/return temperatures, and avoid counting one recovered stream twice.

  8. Rejection or source derating

    Retain a qualified rejection or source-derating route when useful demand, a pump or a recovery interface is unavailable. Internally moving heat does not make it disappear.

  9. Independent plant protection

    Quench protection, fuel-cycle requirements and independent ZSA acceptance retain their own evidence gates. The power/thermal addendum does not close physical qualification.

Connections

  • Single plasma fusion core → Electrical conversion (Electrical / power interface)
  • Electrical conversion → SERAT protected distribution (Electrical / power interface)
  • SERAT protected distribution → Grid & useful loads (Electrical / power interface)
  • Electrical conversion → Compatible heat source (Heat transfer)
  • Compatible heat source → Isolating heat exchange (Heat transfer)
  • Isolating heat exchange → Useful heat customer (Heat transfer)
  • Isolating heat exchange → Rejection or source derating (Heat transfer)
  • Independent plant protection → Single plasma fusion core (Independent protection / constraint)
04 / EARTH DIAGRAM

Protected power. Clear priorities.

A readable redraw of the recovered ZPA-UNIFIED v2.0 power-network concept.

Select a block to explore its role
Protected power. Clear priorities.A readable redraw of the recovered ZPA-UNIFIED v2.0 power-network concept. The map shows electrical relationships. Separate thermal and system-bus networks, local protection and AXIOM constraints remain in force. No hardware ratings are assigned by this redraw.synchronizationExisting & new sources: The recovered design connects compatible legacy and new sources through owned interfaces. This does not imply every source is renewable or that all listed technologies are installed.01 / POWERExisting &new sourcesHydro · solar · wind · storageSource interface & protection: Each source needs its own conversion, protection, metering and local-control envelope. The modern SERAT addendum adds explicit acceptance of returned power and bounded buffering.02 / POWERSource interface& protectionIsolation · conversion · meteringController A: Controller A is one lane of the redundant bidirectional coordination concept. Redundancy and fail-operation must be demonstrated for a selected installation.03 / POWERController AIndependent operating laneController B: Controller B supplies the separate coordination lane. A synchronization link informs coordination without turning local safety into a network-dependent function.04 / POWERController BIndependent operating laneElectrical spine A: Spine A is one protected electrical distribution path. Electrical, thermal and data networks retain separate physical and functional boundaries.05 / POWERElectricalspine AProtected AC / DC distributionElectrical spine B: Spine B is shown as a separately protected alternative path. The drawing does not establish a fault-current rating, changeover time or automatic permission to parallel sources.06 / POWERElectricalspine BRedundant distribution pathA · Grid services: The recovered architecture places curtailable grid export and grid services in Domain A. This is a project priority allocation, not a universal rule for every facility.07 / POWERA · GridservicesLowest reference priorityB · Industry & mobility: Domain B groups contracted industrial and mobility services. Its own controllers, protection, reserve limits and restart requirements define the installation.08 / POWERB · Industry& mobilityHigh reference priorityC · Community & households: Domain C groups homes, buildings, heating, water and community services. Local reserve ownership prevents the same bounded reserve being promised to multiple loads.09 / POWERC · Community& householdsVery high reference priorityD · Emergency reserve: Domain D protects essential hospital, emergency, communications, water and shelter services in the recovered priority concept. Exact capacity and operating restrictions remain installation-specific.10 / SAFETYD · EmergencyreserveHighest reference priority
Alternative protected power pathInformation / control requestElectrical / power interface

Swipe across the diagram to explore it, or open the full-size view.

SELECTED SYSTEM

D · Emergency reserve

Domain D protects essential hospital, emergency, communications, water and shelter services in the recovered priority concept. Exact capacity and operating restrictions remain installation-specific.

Read the complete text version
  1. Existing & new sources

    The recovered design connects compatible legacy and new sources through owned interfaces. This does not imply every source is renewable or that all listed technologies are installed.

  2. Source interface & protection

    Each source needs its own conversion, protection, metering and local-control envelope. The modern SERAT addendum adds explicit acceptance of returned power and bounded buffering.

  3. Controller A

    Controller A is one lane of the redundant bidirectional coordination concept. Redundancy and fail-operation must be demonstrated for a selected installation.

  4. Controller B

    Controller B supplies the separate coordination lane. A synchronization link informs coordination without turning local safety into a network-dependent function.

  5. Electrical spine A

    Spine A is one protected electrical distribution path. Electrical, thermal and data networks retain separate physical and functional boundaries.

  6. Electrical spine B

    Spine B is shown as a separately protected alternative path. The drawing does not establish a fault-current rating, changeover time or automatic permission to parallel sources.

  7. A · Grid services

    The recovered architecture places curtailable grid export and grid services in Domain A. This is a project priority allocation, not a universal rule for every facility.

  8. B · Industry & mobility

    Domain B groups contracted industrial and mobility services. Its own controllers, protection, reserve limits and restart requirements define the installation.

  9. C · Community & households

    Domain C groups homes, buildings, heating, water and community services. Local reserve ownership prevents the same bounded reserve being promised to multiple loads.

  10. D · Emergency reserve

    Domain D protects essential hospital, emergency, communications, water and shelter services in the recovered priority concept. Exact capacity and operating restrictions remain installation-specific.

Connections

  • Existing & new sources → Source interface & protection (Electrical / power interface)
  • Source interface & protection → Controller A (Electrical / power interface)
  • Source interface & protection → Controller B (Electrical / power interface)
  • Controller A → Controller B (Information / control request)
  • Controller A → Electrical spine A (Electrical / power interface)
  • Controller B → Electrical spine B (Electrical / power interface)
  • Electrical spine A → A · Grid services (Electrical / power interface)
  • Electrical spine A → B · Industry & mobility (Electrical / power interface)
  • Electrical spine A → C · Community & households (Electrical / power interface)
  • Electrical spine A → D · Emergency reserve (Electrical / power interface)
  • Electrical spine B → A · Grid services (Alternative protected power path)
  • Electrical spine B → B · Industry & mobility (Alternative protected power path)
  • Electrical spine B → C · Community & households (Alternative protected power path)
  • Electrical spine B → D · Emergency reserve (Alternative protected power path)
05 / SPACE DIAGRAM

Power generation is separate from reference.

Follow QVCO-R1 while keeping the CMC and GENI interfaces outside the primary-energy chain.

Select a block to explore its role
Power generation is separate from reference.Follow QVCO-R1 while keeping the CMC and GENI interfaces outside the primary-energy chain. Read the folded power chain from Fusion A/B through local isolation, central coordination and SERAT to the Vector Accelerator and main propulsion. CMC and GENI links are reference/control interfaces.Fusion A: Fusion A converts energy from confined fuel plasma and feeds its own Local Fuse Chamber. Local shutdown and cooling sit at the source.01 / POWERFusion AConfined plasma · lane AFusion B: Fusion B has its own confined fuel plasma and feeds a separate protected lane. Reactor independence and source ratings require class-specific evidence.02 / POWERFusion BConfined plasma · lane BLocal Fuse A: The local fuse stage isolates and conditions lane A before central coordination. It preserves the adopted chamber order.03 / POWERLocal Fuse ASource-level isolationLocal Fuse B: Lane B retains its own local isolation interface. Fault containment must be checked against the selected source and installation.04 / POWERLocal Fuse BSource-level isolationCentral Bidirectional Fuse: The central bidirectional chamber coordinates the protected source lanes. It is followed by the SERAT Power Corridor; it does not replace the independent source safety paths.05 / POWERCentralBidirectional FuseTwo protected lanesSERAT Power Corridor: SERAT supplies protected and prioritized vessel loads. The later conversion addendum attaches bounded converters and local buffers at compatible protected branches without reordering QVCO-R1.06 / POWERSERAT PowerCorridorSeparated distribution trunksVector Accelerator: The Vector Accelerator receives conditioned power within the conceptual propulsion chain, with distinct GENI control and CMC reference inputs. No demonstrated thrust, speed or efficiency is assigned.07 / FIELDVectorAcceleratorConceptual conditioning stageMain propulsion: The working major-vessel architecture describes two stern propulsion assemblies and separate hull manoeuvring thrusters. These remain conceptual project records.08 / FIELDMainpropulsionStern thrust assembliesCMC: The Central Magnetic Core supports vessel reference, synchronization and compensation. It is neither the fusion source nor an additional energy supply.09 / FIELDCMCVessel reference · not a reactorGENI: GENI coordinates the authorized field-control interface. Power comes from the protected SERAT path; a control or reference link is not another source of energy.10 / FIELDGENIField interaction & control
Information / control requestReference / field interfaceElectrical / power interface

Swipe across the diagram to explore it, or open the full-size view.

SELECTED SYSTEM

SERAT Power Corridor

SERAT supplies protected and prioritized vessel loads. The later conversion addendum attaches bounded converters and local buffers at compatible protected branches without reordering QVCO-R1.

Read the complete text version
  1. Fusion A

    Fusion A converts energy from confined fuel plasma and feeds its own Local Fuse Chamber. Local shutdown and cooling sit at the source.

  2. Fusion B

    Fusion B has its own confined fuel plasma and feeds a separate protected lane. Reactor independence and source ratings require class-specific evidence.

  3. Local Fuse A

    The local fuse stage isolates and conditions lane A before central coordination. It preserves the adopted chamber order.

  4. Local Fuse B

    Lane B retains its own local isolation interface. Fault containment must be checked against the selected source and installation.

  5. Central Bidirectional Fuse

    The central bidirectional chamber coordinates the protected source lanes. It is followed by the SERAT Power Corridor; it does not replace the independent source safety paths.

  6. SERAT Power Corridor

    SERAT supplies protected and prioritized vessel loads. The later conversion addendum attaches bounded converters and local buffers at compatible protected branches without reordering QVCO-R1.

  7. Vector Accelerator

    The Vector Accelerator receives conditioned power within the conceptual propulsion chain, with distinct GENI control and CMC reference inputs. No demonstrated thrust, speed or efficiency is assigned.

  8. Main propulsion

    The working major-vessel architecture describes two stern propulsion assemblies and separate hull manoeuvring thrusters. These remain conceptual project records.

  9. CMC

    The Central Magnetic Core supports vessel reference, synchronization and compensation. It is neither the fusion source nor an additional energy supply.

  10. GENI

    GENI coordinates the authorized field-control interface. Power comes from the protected SERAT path; a control or reference link is not another source of energy.

Connections

  • Fusion A → Local Fuse A (Electrical / power interface)
  • Fusion B → Local Fuse B (Electrical / power interface)
  • Local Fuse A → Central Bidirectional Fuse (Electrical / power interface)
  • Local Fuse B → Central Bidirectional Fuse (Electrical / power interface)
  • Central Bidirectional Fuse → SERAT Power Corridor (Electrical / power interface)
  • SERAT Power Corridor → Vector Accelerator (Electrical / power interface)
  • Vector Accelerator → Main propulsion (Electrical / power interface)
  • CMC → Vector Accelerator (Reference / field interface)
  • GENI → Vector Accelerator (Information / control request)
06 / SPACE DIAGRAM

Seventeen vessels. Defined responsibilities.

The reconciled planning register, interceptor hosts, reserve research and local shield duties.

Select a block to explore its role
Seventeen vessels. Defined responsibilities.The reconciled planning register, interceptor hosts, reserve research and local shield duties. The current register contains 17 crewed planning entries. Connectors show command, coordination or docking allocation, not physical spacing. The 62 drones are assigned to Zorak, Anorak, Fronak and Norak; Ranok is a separate reserve research entry.Zorak: Zorak retains strategic command and fleet hazard decisions. Its assigned drone allocation is 24; Araknok and Ferko retain Zorak as host. Centri coordinates readiness and recovery without overriding local protection.01 / DATAZorakCommand flagship · 24 dronesAnorak & Fronak: Both research vessels carry 16 drones. Anorak carries five inspection drones and six planetary survey drones; Fronak carries three and eight respectively. Each carries three relays and two long-duration explorers.02 / DATAAnorak& FronakResearch vessels · 16 drones eachHerko: Herko carries Zuma and Zarek. Anorak is the Group A research vessel in the current fleet reference.03 / SYSTEMHerkoGroup A carrierDerko: Derko carries Rekor and Jetnok. Fronak is the Group B research vessel in the current fleet reference.04 / SYSTEMDerkoGroup B carrierSorko: Sorko remains near Zorak for anomaly-response readiness, with Serko and Zotno docked under the working doctrine.05 / SYSTEMSorkoGroup C carrierZuma · Zarek: Zuma and Zarek are the Group A interceptor pair. Interceptors remain docked during transmission and cruise in the working fleet doctrine.06 / SYSTEMZuma · ZarekDocked pair / HerkoRekor · Jetnok: Rekor and Jetnok are the Group B interceptor pair. This map describes allocation and docking, not physical distances or operating readiness.07 / SYSTEMRekor · JetnokDocked pair / DerkoSerko · Zotno: Serko and Zotno are assigned to Sorko in Group C. The pair remains weapon-safe while docked under the adopted doctrine.08 / SYSTEMSerko · ZotnoDocked pair / SorkoAraknok · Ferko: Araknok and Ferko are Zorak's interceptor reserve. The anomaly-response doctrine may assign them to an investigation unless flagship defence requires them.09 / SYSTEMAraknok · FerkoFlagship interceptor reserveCentri: Centri coordinates readiness, degraded coverage and recovery under Zorak. Its longitudinal CFH-M1 hull is provisional. Fleet coordination does not replace each vessel's independent protection.10 / DATACentriFleet coordination & recoveryRanok: Ranok retains the accepted reserve research role and a coordination interface with Centri. Its physical specification remains unresolved, with no new drone or interceptor allocation.11 / DATARanokReserve research vesselNorak: Norak stores two orbital relays and four planetary survey drones. Its roadster and drone bays support surface operations while the main fleet stages in space.12 / SYSTEMNorakQAC-1 planetary cruiser25-region shield watch: Each shielded vessel retains five layers across five hull sectors. Sensors report hazards and coil state, GENI requests feasible responses, CMC synchronizes and local controllers regulate. Protection ratings remain unassigned.13 / FIELD25-regionshield watchLocal sensing, control & recovery62 assigned drones: Drone Integration R3 assigns 16 Relay, 12 Deep-Space Survey/Inspection, 28 Planetary Survey and six Long-Duration Exploration drones. Host totals are Zorak 24, Anorak 16, Fronak 16 and Norak 6.14 / DATA62 assigned drones82 berths · 20 empty
Information / control requestScope / physical relationship

Swipe across the diagram to explore it, or open the full-size view.

SELECTED SYSTEM

Zorak

Zorak retains strategic command and fleet hazard decisions. Its assigned drone allocation is 24; Araknok and Ferko retain Zorak as host. Centri coordinates readiness and recovery without overriding local protection.

Read the complete text version
  1. Zorak

    Zorak retains strategic command and fleet hazard decisions. Its assigned drone allocation is 24; Araknok and Ferko retain Zorak as host. Centri coordinates readiness and recovery without overriding local protection.

  2. Anorak & Fronak

    Both research vessels carry 16 drones. Anorak carries five inspection drones and six planetary survey drones; Fronak carries three and eight respectively. Each carries three relays and two long-duration explorers.

  3. Herko

    Herko carries Zuma and Zarek. Anorak is the Group A research vessel in the current fleet reference.

  4. Derko

    Derko carries Rekor and Jetnok. Fronak is the Group B research vessel in the current fleet reference.

  5. Sorko

    Sorko remains near Zorak for anomaly-response readiness, with Serko and Zotno docked under the working doctrine.

  6. Zuma · Zarek

    Zuma and Zarek are the Group A interceptor pair. Interceptors remain docked during transmission and cruise in the working fleet doctrine.

  7. Rekor · Jetnok

    Rekor and Jetnok are the Group B interceptor pair. This map describes allocation and docking, not physical distances or operating readiness.

  8. Serko · Zotno

    Serko and Zotno are assigned to Sorko in Group C. The pair remains weapon-safe while docked under the adopted doctrine.

  9. Araknok · Ferko

    Araknok and Ferko are Zorak's interceptor reserve. The anomaly-response doctrine may assign them to an investigation unless flagship defence requires them.

  10. Centri

    Centri coordinates readiness, degraded coverage and recovery under Zorak. Its longitudinal CFH-M1 hull is provisional. Fleet coordination does not replace each vessel's independent protection.

  11. Ranok

    Ranok retains the accepted reserve research role and a coordination interface with Centri. Its physical specification remains unresolved, with no new drone or interceptor allocation.

  12. Norak

    Norak stores two orbital relays and four planetary survey drones. Its roadster and drone bays support surface operations while the main fleet stages in space.

  13. 25-region shield watch

    Each shielded vessel retains five layers across five hull sectors. Sensors report hazards and coil state, GENI requests feasible responses, CMC synchronizes and local controllers regulate. Protection ratings remain unassigned.

  14. 62 assigned drones

    Drone Integration R3 assigns 16 Relay, 12 Deep-Space Survey/Inspection, 28 Planetary Survey and six Long-Duration Exploration drones. Host totals are Zorak 24, Anorak 16, Fronak 16 and Norak 6.

Connections

  • Zorak → Anorak & Fronak (Information / control request)
  • Zorak → Herko (Information / control request)
  • Zorak → Derko (Information / control request)
  • Zorak → Sorko (Information / control request)
  • Zorak → Araknok · Ferko (Scope / physical relationship)
  • Herko → Zuma · Zarek (Scope / physical relationship)
  • Derko → Rekor · Jetnok (Scope / physical relationship)
  • Sorko → Serko · Zotno (Scope / physical relationship)
  • Zorak → Centri (Information / control request)
  • Centri → Ranok (Information / control request)
  • Centri → Norak (Information / control request)
  • Centri → 25-region shield watch (Information / control request)
07 / SPACE DIAGRAM

Five layers. Twenty-five coordinated regions.

Explore the restored original shield: five concentric layers across five controlled hull sectors.

Select a block to explore its role
Five layers. Twenty-five coordinated regions.Explore the restored original shield: five concentric layers across five controlled hull sectors. Each cell is a layer–sector address in the original vessel architecture. SERAT recovery, hull integrity monitoring and GENI coordination support all five layers. The map does not establish physical shield performance.L5 · OUTERL4 · SECOND OUTERL3 · MIDDLEL2 · SECOND INNERL1 · INNERFore: L5-FOR · Fore. First-contact attenuation and debris response. Monitor compression, impact load and ring current. Regional limits and combined field response require vessel-specific qualification.01 / FIELDForeL5-FORStarboard: L5-STB · Starboard. First-contact attenuation and debris response. Monitor compression, impact load and ring current. Regional limits and combined field response require vessel-specific qualification.02 / FIELDStarboardL5-STBAft: L5-AFT · Aft. First-contact attenuation and debris response. Monitor compression, impact load and ring current. Regional limits and combined field response require vessel-specific qualification.03 / FIELDAftL5-AFTPort: L5-PRT · Port. First-contact attenuation and debris response. Monitor compression, impact load and ring current. Regional limits and combined field response require vessel-specific qualification.04 / FIELDPortL5-PRTDorsal / ventral: L5-DV · Dorsal–ventral. First-contact attenuation and debris response. Monitor compression, impact load and ring current. Regional limits and combined field response require vessel-specific qualification.05 / FIELDDorsal / ventralL5-DVFore: L4-FOR · Fore. Deflection and directed dispersion. Monitor vector bias and temperature rise. Regional limits and combined field response require vessel-specific qualification.06 / FIELDForeL4-FORStarboard: L4-STB · Starboard. Deflection and directed dispersion. Monitor vector bias and temperature rise. Regional limits and combined field response require vessel-specific qualification.07 / FIELDStarboardL4-STBAft: L4-AFT · Aft. Deflection and directed dispersion. Monitor vector bias and temperature rise. Regional limits and combined field response require vessel-specific qualification.08 / FIELDAftL4-AFTPort: L4-PRT · Port. Deflection and directed dispersion. Monitor vector bias and temperature rise. Regional limits and combined field response require vessel-specific qualification.09 / FIELDPortL4-PRTDorsal / ventral: L4-DV · Dorsal–ventral. Deflection and directed dispersion. Monitor vector bias and temperature rise. Regional limits and combined field response require vessel-specific qualification.10 / FIELDDorsal / ventralL4-DVFore: L3-FOR · Fore. Spatial charge and load distribution. Monitor impedance and synchronization. Regional limits and combined field response require vessel-specific qualification.11 / FIELDForeL3-FORStarboard: L3-STB · Starboard. Spatial charge and load distribution. Monitor impedance and synchronization. Regional limits and combined field response require vessel-specific qualification.12 / FIELDStarboardL3-STBAft: L3-AFT · Aft. Spatial charge and load distribution. Monitor impedance and synchronization. Regional limits and combined field response require vessel-specific qualification.13 / FIELDAftL3-AFTPort: L3-PRT · Port. Spatial charge and load distribution. Monitor impedance and synchronization. Regional limits and combined field response require vessel-specific qualification.14 / FIELDPortL3-PRTDorsal / ventral: L3-DV · Dorsal–ventral. Spatial charge and load distribution. Monitor impedance and synchronization. Regional limits and combined field response require vessel-specific qualification.15 / FIELDDorsal / ventralL3-DVFore: L2-FOR · Fore. Harmonic stabilization and recovery. Monitor phase drift and reserve margin. Regional limits and combined field response require vessel-specific qualification.16 / FIELDForeL2-FORStarboard: L2-STB · Starboard. Harmonic stabilization and recovery. Monitor phase drift and reserve margin. Regional limits and combined field response require vessel-specific qualification.17 / FIELDStarboardL2-STBAft: L2-AFT · Aft. Harmonic stabilization and recovery. Monitor phase drift and reserve margin. Regional limits and combined field response require vessel-specific qualification.18 / FIELDAftL2-AFTPort: L2-PRT · Port. Harmonic stabilization and recovery. Monitor phase drift and reserve margin. Regional limits and combined field response require vessel-specific qualification.19 / FIELDPortL2-PRTDorsal / ventral: L2-DV · Dorsal–ventral. Harmonic stabilization and recovery. Monitor phase drift and reserve margin. Regional limits and combined field response require vessel-specific qualification.20 / FIELDDorsal / ventralL2-DVFore: L1-FOR · Fore. Crew/vessel protection and internal coherence. Monitor leakage, field stability and thermal-loop status. Regional limits and combined field response require vessel-specific qualification.21 / FIELDForeL1-FORStarboard: L1-STB · Starboard. Crew/vessel protection and internal coherence. Monitor leakage, field stability and thermal-loop status. Regional limits and combined field response require vessel-specific qualification.22 / FIELDStarboardL1-STBAft: L1-AFT · Aft. Crew/vessel protection and internal coherence. Monitor leakage, field stability and thermal-loop status. Regional limits and combined field response require vessel-specific qualification.23 / FIELDAftL1-AFTPort: L1-PRT · Port. Crew/vessel protection and internal coherence. Monitor leakage, field stability and thermal-loop status. Regional limits and combined field response require vessel-specific qualification.24 / FIELDPortL1-PRTDorsal / ventral: L1-DV · Dorsal–ventral. Crew/vessel protection and internal coherence. Monitor leakage, field stability and thermal-loop status. Regional limits and combined field response require vessel-specific qualification.25 / FIELDDorsal / ventralL1-DV

Swipe across the diagram to explore it, or open the full-size view.

SELECTED SYSTEM

Fore

L5-FOR · Fore. First-contact attenuation and debris response. Monitor compression, impact load and ring current. Regional limits and combined field response require vessel-specific qualification.

Read the complete text version
  1. Fore

    L5-FOR · Fore. First-contact attenuation and debris response. Monitor compression, impact load and ring current. Regional limits and combined field response require vessel-specific qualification.

  2. Starboard

    L5-STB · Starboard. First-contact attenuation and debris response. Monitor compression, impact load and ring current. Regional limits and combined field response require vessel-specific qualification.

  3. Aft

    L5-AFT · Aft. First-contact attenuation and debris response. Monitor compression, impact load and ring current. Regional limits and combined field response require vessel-specific qualification.

  4. Port

    L5-PRT · Port. First-contact attenuation and debris response. Monitor compression, impact load and ring current. Regional limits and combined field response require vessel-specific qualification.

  5. Dorsal / ventral

    L5-DV · Dorsal–ventral. First-contact attenuation and debris response. Monitor compression, impact load and ring current. Regional limits and combined field response require vessel-specific qualification.

  6. Fore

    L4-FOR · Fore. Deflection and directed dispersion. Monitor vector bias and temperature rise. Regional limits and combined field response require vessel-specific qualification.

  7. Starboard

    L4-STB · Starboard. Deflection and directed dispersion. Monitor vector bias and temperature rise. Regional limits and combined field response require vessel-specific qualification.

  8. Aft

    L4-AFT · Aft. Deflection and directed dispersion. Monitor vector bias and temperature rise. Regional limits and combined field response require vessel-specific qualification.

  9. Port

    L4-PRT · Port. Deflection and directed dispersion. Monitor vector bias and temperature rise. Regional limits and combined field response require vessel-specific qualification.

  10. Dorsal / ventral

    L4-DV · Dorsal–ventral. Deflection and directed dispersion. Monitor vector bias and temperature rise. Regional limits and combined field response require vessel-specific qualification.

  11. Fore

    L3-FOR · Fore. Spatial charge and load distribution. Monitor impedance and synchronization. Regional limits and combined field response require vessel-specific qualification.

  12. Starboard

    L3-STB · Starboard. Spatial charge and load distribution. Monitor impedance and synchronization. Regional limits and combined field response require vessel-specific qualification.

  13. Aft

    L3-AFT · Aft. Spatial charge and load distribution. Monitor impedance and synchronization. Regional limits and combined field response require vessel-specific qualification.

  14. Port

    L3-PRT · Port. Spatial charge and load distribution. Monitor impedance and synchronization. Regional limits and combined field response require vessel-specific qualification.

  15. Dorsal / ventral

    L3-DV · Dorsal–ventral. Spatial charge and load distribution. Monitor impedance and synchronization. Regional limits and combined field response require vessel-specific qualification.

  16. Fore

    L2-FOR · Fore. Harmonic stabilization and recovery. Monitor phase drift and reserve margin. Regional limits and combined field response require vessel-specific qualification.

  17. Starboard

    L2-STB · Starboard. Harmonic stabilization and recovery. Monitor phase drift and reserve margin. Regional limits and combined field response require vessel-specific qualification.

  18. Aft

    L2-AFT · Aft. Harmonic stabilization and recovery. Monitor phase drift and reserve margin. Regional limits and combined field response require vessel-specific qualification.

  19. Port

    L2-PRT · Port. Harmonic stabilization and recovery. Monitor phase drift and reserve margin. Regional limits and combined field response require vessel-specific qualification.

  20. Dorsal / ventral

    L2-DV · Dorsal–ventral. Harmonic stabilization and recovery. Monitor phase drift and reserve margin. Regional limits and combined field response require vessel-specific qualification.

  21. Fore

    L1-FOR · Fore. Crew/vessel protection and internal coherence. Monitor leakage, field stability and thermal-loop status. Regional limits and combined field response require vessel-specific qualification.

  22. Starboard

    L1-STB · Starboard. Crew/vessel protection and internal coherence. Monitor leakage, field stability and thermal-loop status. Regional limits and combined field response require vessel-specific qualification.

  23. Aft

    L1-AFT · Aft. Crew/vessel protection and internal coherence. Monitor leakage, field stability and thermal-loop status. Regional limits and combined field response require vessel-specific qualification.

  24. Port

    L1-PRT · Port. Crew/vessel protection and internal coherence. Monitor leakage, field stability and thermal-loop status. Regional limits and combined field response require vessel-specific qualification.

  25. Dorsal / ventral

    L1-DV · Dorsal–ventral. Crew/vessel protection and internal coherence. Monitor leakage, field stability and thermal-loop status. Regional limits and combined field response require vessel-specific qualification.

08 / EARTH DIAGRAM

Hydrogen combustion. Coordinated heat control.

Trace ZC-1's fuel and mechanical path separately from its SERAT and auxiliary interfaces.

Select a block to explore its role
Hydrogen combustion. Coordinated heat control.Trace ZC-1's fuel and mechanical path separately from its SERAT and auxiliary interfaces. Redrawn from the recovered combustion-only SERAT schematic. Functional placement is illustrative, not a packaging, manufacturing or safety-certification drawing.bounded local controlHydrogen storage: The current ZC-1 reference uses hydrogen storage feeding a protected fuel interface. The illustration does not select a tank rating or certify a pressure vessel.01 / FUELHydrogenstorageFuel inventoryHydrogen interface: The recovered SERAT-EV1-C plate includes local isolation, pressure regulation, flow measurement and leak detection. Pressure integrity and vapour handling retain their own scoped project references.02 / FUELHydrogeninterfaceIsolation · regulation · detectionHydrogen combustion engine: The current ZC-1 drivetrain baseline is hydrogen combustion. It is not the electric-motor drivetrain depicted in an older principles illustration.03 / FUELHydrogencombustion engineEngine-driven propulsionMechanical drivetrain: The engine supplies the mechanical propulsion path. Auxiliary batteries and converters in the control/thermal diagram do not change this into an electric-drive baseline.04 / SYSTEMMechanicaldrivetrainUseful road motionAuxiliary electrical supply: Starter and essential-service electrical interfaces support controllers, sensing, communications and cooling. Their presence does not establish traction-motor propulsion.05 / POWERAuxiliaryelectrical supplyProtected essential-service powerSERAT local control unit: SERAT coordinates the local coolant pumps, fans, bypass valves, recovery interfaces and protected service power. The recovered diagram separates engine and essential-electronics thermal loops.06 / DATASERAT localcontrol unitEnergy & thermal coordinationEngine & electronics loops: The primary loop serves the engine, while an essential thermal loop serves electronics and safety-support loads. Post-shutdown cooling and sectional isolation are part of the recovered concept.07 / HEATEngine &electronics loopsSeparated thermal dutiesHeat recovery & rejection: Useful heat may support cabin heating or preheat when compatible. Radiators retain a rejection role; the diagram makes no emissions, efficiency or measured recovery claim.08 / HEATHeat recovery& rejectionUseful cabin heat / radiators
Information / control requestHydrogen fuel pathHeat transferElectrical / power interfaceScope / physical relationship

Swipe across the diagram to explore it, or open the full-size view.

SELECTED SYSTEM

Hydrogen combustion engine

The current ZC-1 drivetrain baseline is hydrogen combustion. It is not the electric-motor drivetrain depicted in an older principles illustration.

Read the complete text version
  1. Hydrogen storage

    The current ZC-1 reference uses hydrogen storage feeding a protected fuel interface. The illustration does not select a tank rating or certify a pressure vessel.

  2. Hydrogen interface

    The recovered SERAT-EV1-C plate includes local isolation, pressure regulation, flow measurement and leak detection. Pressure integrity and vapour handling retain their own scoped project references.

  3. Hydrogen combustion engine

    The current ZC-1 drivetrain baseline is hydrogen combustion. It is not the electric-motor drivetrain depicted in an older principles illustration.

  4. Mechanical drivetrain

    The engine supplies the mechanical propulsion path. Auxiliary batteries and converters in the control/thermal diagram do not change this into an electric-drive baseline.

  5. Auxiliary electrical supply

    Starter and essential-service electrical interfaces support controllers, sensing, communications and cooling. Their presence does not establish traction-motor propulsion.

  6. SERAT local control unit

    SERAT coordinates the local coolant pumps, fans, bypass valves, recovery interfaces and protected service power. The recovered diagram separates engine and essential-electronics thermal loops.

  7. Engine & electronics loops

    The primary loop serves the engine, while an essential thermal loop serves electronics and safety-support loads. Post-shutdown cooling and sectional isolation are part of the recovered concept.

  8. Heat recovery & rejection

    Useful heat may support cabin heating or preheat when compatible. Radiators retain a rejection role; the diagram makes no emissions, efficiency or measured recovery claim.

Connections

  • Hydrogen storage → Hydrogen interface (Hydrogen fuel path)
  • Hydrogen interface → Hydrogen combustion engine (Hydrogen fuel path)
  • Hydrogen combustion engine → Mechanical drivetrain (Scope / physical relationship)
  • Hydrogen combustion engine → Engine & electronics loops (Heat transfer)
  • Auxiliary electrical supply → SERAT local control unit (Electrical / power interface)
  • SERAT local control unit → Engine & electronics loops (Information / control request)
  • Engine & electronics loops → Heat recovery & rejection (Heat transfer)
  • SERAT local control unit → Hydrogen interface (Information / control request)
  • SERAT local control unit → Heat recovery & rejection (Information / control request)
RECOVERED FROM THE DESIGN HISTORY

The drawings that came before.

Earlier concept plates, redrawn for clarity. The original illustrations remain available for comparison.

HISTORICAL REFERENCE

These earlier illustrations contain historical proposals and some superseded figures. Use the current maps above for the revised architecture; the notes below identify important differences. Browse the complete Originals collection ↗

ZPA-UNIFIED v2.0

Protected power architecture

Refined visual edition of the July 2026 ZPA-UNIFIED concept. Separate electrical, thermal and data roles are easier to follow; later SERAT interface requirements retain precedence.

Earlier integrated concept

Vessel systems architecture

This is a refined edition of the historical vessel diagram. It shows 25 regions, matching the restored Outverse design. See the current vessel map and Atlas for the latest system and vessel details.

ZTIA concept plate

Telemetric integrity architecture

Refined visual edition of the July 2026 ZTIA concept. Trust-anchor and authority proposals remain historical design material; the independent local-protection boundary stays explicit.

SERAT-EV1-C

ZC-1 SERAT unit schematic

Refined visual edition published on 10 November 2026. Follow the hydrogen-combustion drivetrain, separate engine and electronics cooling circuits, useful-heat recovery and protected auxiliary power. The original remains preserved in Originals; component sizing and physical verification remain open.

CONTINUE EXPLORING

Put the models in context.

Read the Earth and Space program references or explore the climate report.

Earth Program ↗Space Program ↗ZENIT & climate ↗
MODEL ATLAS

Full-size diagram