EARTH & SPACE / PROGRAM ATLAS
THE ZENIT PROGRAM / QI VANGUARD FLEETNORAK · QAC-1 / R3 · 15 NOV 2026

PLANETARY CRUISER / OWNER-NAMED DESIGN

Norak.
A planetary role.

A winged Qi cruiser for survey, rescue, crew transfer and logistics. Explore the lifting body, protected machinery and 25-region shield arrangement.

Norak is the vessel name selected by Fredrik Sommerseth Olsen. QAC-1 remains the class designation. Dimensions, mass and mission capacity are proposed reference inputs.

112 mOverall length
92 mStudy wingspan · 30 m hull beam
25 regionsFive shield layers × five sectors
3,816.0 tR3 loaded landing mass
PREPARING NORAK R3 MODEL

Norak / QAC-1 loaded R3 study geometry

Drag to orbit · Arrow keys to rotate · + / − to zoom

The rotatable R3 concept uses the updated hull envelope. Open Cutaway to see the loaded bays. The GLB below preserves the separate R1 design.

QAC-1 R3 / SURFACE OPERATIONS

Norak carries the surface team.

Norak is the Qi Fleet’s sole shipboard roadster carrier. Its R3 loadout pairs a battery-electric Scout and a fuel-cell Cargo roadster with six drones. The separate 40 t mission allowance is included in the loaded design.

Four ZD-P survey drones

Two map terrain, one surveys the environment and one is a ready spare. Flight depends on local atmosphere, gravity and qualification. Use as stationary surface instruments requires its own deployment approval.

Two ZD-R orbital relays

One working relay and one backup extend the fleet link. Both deploy and recover in space. With both released, landing mass falls to 3,810 t and the reference braking load to 39.27 MN.

Eight drone berths

Two banks of four positions flank a 6 m handling lane. Six positions are assigned and two stay empty for handling and maintenance. Drones and local fit-out add 66 t.

Roadster bay

12 × 9 × 4 m clear

  1. PR-01 Scout
  2. PR-H2 Cargo

Separate roadster egress

Drone bay

21 × 15 × 3 m clear

  1. ZD-P Mapping
  2. ZD-P Mapping
  3. ZD-P Environment
  4. ZD-P Spare

6 m handling lane

  1. ZD-R Working
  2. ZD-R Backup
  3. Empty
  4. Empty

Both bays need 1,377 m³ of clear space and a 35 m fore–aft run including the study separation. The 112 × 30 × 22 m hull and 92 m wingspan are provisional. Verify decks, locks, transfer paths and centre of gravity through unloading.

Fleet drone allocation ↗ · Planetary roadsters and their bay ↗

Mass, force and energy by operating case

Norak R3 engineering study figures
MeasureR3 studyBasis
Loaded landing mass3,816.0 tAll six drones stowed · 71.7 t above R2
Earth static support / braking37.42 / 39.33 MNBraking adds 0.5 m/s² of net upward acceleration
Highest single support demand13.27 MNWorst screened case with one interface unavailable
Two-minute hover4.18 GW · 139.29 MWhAir-moving lift benchmark at Earth sea level
500 m/s vacuum manoeuvre0.97 GW · 13.36 GWh64.13 t propellant · 13.77 h · 388 MW drive losses
Ship and bay services36.94 MWh/day678 kWh/day for drone standby and top-ups · 112 kW peak drone bay draw

The orbital example departs at 3,880.1 t including burn propellant. It applies the Qi Fleet propulsion cycle to Norak’s vacuum manoeuvre. GENI lift efficiency, installed reactor and thermal ratings, and full Earth entry and ascent remain open.

Loaded landing replay ↗ · Follow the full surface mission ↗

QAC-1 R3 / CARGO TRANSFER

Norak’s unloading hatches

The starboard drone hatch and aft vehicle hatch have separate paths outside the crew pressure boundary. The concept shows both openings and their proposed handling equipment.

R3 CARGO DECK · CONCEPT

A · drone transfer tray / B · vehicle lift and ramp

Drag or use the arrow keys to orbit. Use + or − to zoom.

Open cargo-deck geometry for access review. The tray and lift are shown at deck and lowered positions.
View the annotated unloading cutaway Norak’s teal starboard drone tray and amber aft vehicle lift follow distinct routes from their two cargo bays.

Surface unloading order

  1. Confirm stable support, isolation from the crew pressure volume, and clear areas for the tray and vehicle lift.
  2. Deploy one ZD-P for a terrain survey where flight is qualified. Use a stationary deployment if that mode is approved for the site.
  3. Lower Scout first, then Cargo. Recheck the load state and centre of gravity before the next release.

The openings are preliminary clear dimensions. The transfer pocket, lift sweep and hatch structure require fit and load checks against the landing supports, propulsion equipment and changes in centre of gravity.

Roadster release procedure ↗ · Roadster bay ↗ · Other Qi Fleet unloading models ↗

FLEET INTEGRATION

A planetary element alongside Groups A, B and C.

Transit with the fleet.

Norak takes a separately qualified external outboard slot under Zorak. The eight interceptors remain docked to their existing hosts during cruise and transmission.

Depart through a clear corridor.

The main fleet stages in space while Norak separates for planetary work. Atmospheric routes require their own entry, wake, weather and terrain separation.

Reserve the landing base.

One vessel occupies the final capture corridor. Norak retains onboard support until measured base support and structural handover are confirmed.

Qi fleet command and docking organization with Norak in an external planetary slot
Organization schematic. No station-keeping distance or validated shield overlap is assigned. Centri and Ranok are restored to their fleet roles in R2.

Existing fleet speed settings remain historical design ratings. Norak does not inherit a speed or IT-Jump rating by joining the roster; combined operations require a qualified shared envelope.

QI FLEET / RECONCILED PLANNING REGISTER

Current roles. One reconciled roster.

The reconciled register contains 17 crewed planning entries: the 14-vessel historical plate, restored Centri and Ranok roles, and Norak. Centri coordinates recovery and the central IT-Driver research interface under Zorak strategic command. Its CFH-M1 dimensions remain provisional; Ranok’s controlling physical specification remains unresolved. R3 drone assignments are Zorak 24, Anorak 16, Fronak 16 and Norak 6.

Qi fleet reference dimensions and masses
VESSELCLASSGROUPL × B × H / mREFERENCE MASS / tDOCKS / HOST
ZorakFlagshipC680 × 168 × 126690,000Araknok · Ferko
CentriCoordinationCoordination element520 × 124 × 86395,000 · studyVentral recovery interface; fit open
AnorakResearchA420 × 96 × 72210,000—
FronakResearchB400 × 92 × 69195,000—
RanokResearchResearch reserveNot establishedNot established—
HerkoCarrierA510 × 138 × 98390,000Zuma · Zarek
DerkoCarrierB510 × 138 × 98390,000Rekor · Jetnok
SorkoCarrierC525 × 142 × 102410,000Serko · Zotno
ZumaInterceptorA48 × 25 × 121,120Herko
ZarekInterceptorA48 × 25 × 121,120Herko
RekorInterceptorB46 × 24 × 111,050Derko
JetnokInterceptorB46 × 24 × 111,050Derko
SerkoInterceptorC44 × 23 × 10.5980Sorko
ZotnoInterceptorC44 × 23 × 10.5980Sorko
AraknokInterceptorC52 × 27 × 131,350Zorak
FerkoInterceptorC50 × 26 × 12.51,250Zorak
NorakCruiserPlanetary112 × 30 × 22 · 92 span3,816.0 · studyExternal slot

Archive dimensions and loaded masses are preliminary design references. Norak’s numbers are selected study inputs. Centri uses a recovered provisional proposal and Ranok remains unrated. The table uses the R3 fleet planning register.

EARTH / LANDING INTERFACE

A wider deck. A defined support path.

The archived R4 mesh represents the earlier fit for Norak’s 96 m length and 82 m span: a 150 × 130 m deck, a 116 × 102 m marked clear envelope, an adjustable four-point cradle and separate power/cooling service islands. These are selected layout dimensions; receiver compatibility, structural capacity and soil acceptance remain open.

Inspect the revised base in 3D ↗ · Play the loaded R3 landing replay ↗

In the R1 replay, at 3,000 t static support requires 29.420 MN and the reference 0.5 m/s² upward braking case requires 30.920 MN. Enlarging the structure does not increase the earlier ideal magnetic-force estimate. Norak’s default landing replay retains onboard support when that estimate is insufficient.

SHIELD / CURRENT VESSEL BASELINE

Five sectors in every layer.

L5 · OuterFore · Starboard · Aft · Port · Dorsal–ventral
L4 · Second outerFore · Starboard · Aft · Port · Dorsal–ventral
L3 · MiddleFore · Starboard · Aft · Port · Dorsal–ventral
L2 · Second innerFore · Starboard · Aft · Port · Dorsal–ventral
L1 · InnerFore · Starboard · Aft · Port · Dorsal–ventral

GENI schedules propulsion and shield demand against core, SERAT and thermal constraints. CMC remains separate from the reactor. NEXUS supervises; local controllers execute. AXIOM retains final physical veto authority and ZSA owns test/configuration acceptance.

REFERENCE DRAWING & EVIDENCE

The design, with its assumptions visible.

Dimensioned Norak top and side reference drawing with internal equipment envelopes and 25-region matrix
Owner-named Norak / QAC-1 reference design, 10 November 2026.

The R1 study checked 126 static vertical force/moment allocation cases. It establishes calculated demands for the sampled geometry; installed GENI force, power output, entry heating, aerodynamic stability, ascent, range and endurance remain unrated.

REFERENCE DRAWING: NORAK / QAC-1 R1 · NAMING DECISION: FREDRIK SOMMERSETH OLSEN · 10 NOV 2026
SHIELD: ZENIT-SHIELD-25-R1 · FLIGHT AND HARDWARE QUALIFICATION OPEN