Skip to the transition guide
EARTH & SPACE / PROGRAM ATLAS

Qi Vanguard Fleet / QFTP-24

Transition Phases

How does Zorak change the direction of thrust? What confirms that Jetnok has docked with Derko? The proposed Qi-Fleet Transition Protocol (QFTP-24) describes 24 changes of state and the checks that connect them.

Six transition categories

Open a phase list for its starting state, ending state and purpose. Physical qualification remains open across the register.

Three-quarter view of Zorak R2 with two cyan-lit propulsion assemblies at the aft ends of its wings.
Zorak R2 carries a separate drive in each propulsion wing.

Propulsion transitions

Zorak’s MAGTRANS transmissions change the direction of thrust. To brake, the design passes through neutral and confirms reverse lock before applying opposing thrust. Once relative motion is under control, the drives can hold position.

5 phases TP-01–TP-05
  1. TP-01
    Standby → Active propulsion

    The drive moves from a ready state to producing commanded thrust.

  2. TP-02
    Acceleration → Sustained cruise

    The ship ends its acceleration phase and settles into its planned cruise condition.

  3. TP-03
    Cruise → Controlled deceleration

    The selected maneuver now reduces speed relative to the destination or formation.

  4. TP-04
    Forward → Neutral → Reverse propulsion

    Thrust pauses through neutral until the transmission confirms reverse lock and exhaust clearance.

  5. TP-05
    Reverse propulsion → Station keeping

    After braking, small corrections hold the ship’s position relative to its reference.

Follow the MAGTRANS reverse sequence
Graph of Zorak’s reference pulse. Combined diverted power rises to 10 megawatts by 20 seconds and returns to zero at 180 seconds.
Zorak’s reference model returns both KETS branches to bypass at 180 seconds.

KETS transitions

The Kinetic Energy Transfer System (KETS) redirects surplus charged-particle energy to assist propulsion for a limited time. In Zorak’s modeled pulse, the two branches come online in stages. Bypass ends the assist while cooling continues.

4 phases TP-06–TP-09
  1. TP-06
    Normal propulsion → KETS preparation

    The recovery branches stay in bypass while the cooling loops and available energy are checked.

  2. TP-07
    KETS preparation → Boost activation

    The model brings branch A online first, then branch B. SERAT routes available electrical power to the drives.

  3. TP-08
    KETS boost → Bypass

    The pulse winds down and both branches stop diverting energy. The ship retains its motion.

  4. TP-09
    Bypass → Cooldown and normal propulsion

    Cooling continues until temperature and flow readings support recovery. A new pulse needs a fresh clearance.

Explore the KETS pulse model
Blue field contours surrounding the hull in ZENIT’s Outverse Shield activation concept film.
A concept-film visualization of Outverse coverage around a vessel.

Shield transitions

The Aurora design maps five layers across five hull sectors. GENI requests Outverse coverage for flight. At a docking port, it can request Inverse Mode in the facing regions and check their response before restoring Outverse coverage.

3 phases TP-10–TP-12
  1. TP-10
    Standby → Outverse Shield Mode

    GENI requests the outward field configuration. Local controllers check the response against the available power and cooling.

  2. TP-11
    Outverse → Inverse Shield Mode

    For docking, both craft select the facing port regions. Damping at that interface remains an experimental effect.

  3. TP-12
    Inverse → Outverse Shield Mode

    The controller withdraws the local Inverse request and checks feedback as outward coverage resumes.

Explore the 25-region shield map
A visiting spacecraft faces an open docking collar across a short gap, before the two interfaces meet.
An aligned approach still leaves a gap before mechanical capture.

Docking transitions

Jetnok first matches Derko’s motion using propulsion. The proposed Inverse Shield assist damps their final closing motion. A mechanical latch takes the load, and an independent latch reading confirms capture. The paired assist has been studied in simulation.

4 phases TP-13–TP-16
  1. TP-13
    Independent flight → Docking approach

    The visiting craft matches the host’s motion. Both sides check the selected port, alignment and readiness.

  2. TP-14
    Approach → Inverse Shield-assisted braking

    Inside the proposed capture range, the facing ports request controlled damping while monitoring closing speed.

  3. TP-15
    Controlled braking → Mechanical capture

    The latch engages within the capture limits. Independent feedback confirms that the connection can carry the load.

  4. TP-16
    Docked state → Release and independent flight

    After both sides confirm release and clearance, the visiting craft separates under its own control.

Explore the Qi docking demonstrator
Norak above cloud layers and a coastline, with the thin blue atmospheric limb visible beyond the wings.
Norak in a concept view of the upper atmosphere.

Earth–Space transitions

Norak and Marak are the two cruisers assigned this sequence. Their proposed Earth Mode uses atmospheric air and hydrogen combustion. The handover to Space Mode closes the atmospheric path and transfers propulsion control to MAGTRANS. Orbital ascent and reentry still require qualification.

6 phases TP-17–TP-22
  1. TP-17
    Ground standby → Atmospheric departure

    The runway concept begins with the cruiser on its landing gear and calls for a rolling takeoff.

  2. TP-18
    Departure → Atmospheric cruise

    The cruiser climbs and settles into wing-borne flight using Fusion-Assisted Atmospheric Propulsion (FAP).

  3. TP-19
    FAP Earth Mode → Space Mode

    The proposed interface hands over to the electromagnetic drive. The conditions for completing orbital ascent remain open.

  4. TP-20
    Space cruise → Atmospheric reentry

    The return study calls for stowing the space radiators and preparing the hull’s entry thermal protection.

  5. TP-21
    Reentry → FAP Earth Mode

    As atmospheric flight resumes, the design returns to air-breathing propulsion and aerodynamic control.

  6. TP-22
    Atmospheric descent → Runway landing

    Approach leads to touchdown, transfer of the load to the landing gear, and runway braking.

Compare the departure and return profiles
Several Qi Fleet vessels in formation inside overlapping blue envelopes in the IT-J02 concept film.
The IT-J02 concept film depicts synchronized fleet envelopes. Physical relocation remains undemonstrated.

IT-Jump transitions

ZENIT’s speculative Instant Teleportation Jump describes a single relocation event. Zorak retains strategic command while Centri coordinates fleet readiness. The recovery sequence calls for a new comparison of vessel positions and references before normal maneuvers resume.

2 phases TP-23–TP-24
  1. TP-23
    Conventional space travel → IT-Jump

    The concept brings the participating vessels onto a common reference and checks readiness for the proposed event.

  2. TP-24
    IT-Jump → Fleet recovery and synchronization

    The scenario checks arrival state and restores coordination across the formation before releasing propulsion.

Explore Centri’s fleet-readiness replay

Meet the cruisers

Norak takes survey teams to the surface. Marak brings supplies and carries patients. Both cruiser concepts are designed around the same journey between a runway on Earth and the fleet in space.

Norak

QAC-1Planetary exploration

Norak concept viewed from above the nose, showing its dark central spine, broad swept wings and twin tail fins.

Two roadsters give the survey team a way to explore beyond the landing site. Four survey drones cover the terrain, while two orbital relays keep the team in contact with the fleet.

Norak in the Model Atlas

Marak

QAC-2Planetary logistics and rescue

Marak concept viewed from above the nose, showing its long cockpit, swept wings and twin fins with gold markings.

Marak’s two cargo bays give supplies their own handling space alongside a dedicated patient-transfer area. The layout also reserves access for two roadsters to support surface missions.

Marak in the Model Atlas

Cruiser flight phases

Follow the Earth–Space transitions through the R26 departure and return studies for Norak and Marak. The conditions for switching modes and reaching orbit still need to be established.

Flight direction

Earth to space

  1. Runway departure

    Both designs start with a rolling takeoff. Each cruiser still needs its own takeoff thrust, distance and landing-gear load assessment.

  2. Atmospheric climb

    In Earth Mode, the wings provide lift. Fusion-Assisted Atmospheric Propulsion (FAP) uses outside air for hydrogen combustion in a flow path isolated from the fusion core.

  3. Propulsion handover

    As the air thins, the proposed FMI-1 interface coordinates the change from atmospheric exhaust control to the electromagnetic mode of the MAGTRANS-DM directional transmission.

  4. Space Mode

    In the space configuration, the atmospheric valve (APV-1) is closed and hydrogen combustion is off. The MAGTRANS drive uses its magnetic coupling chamber. Available thrust and heat rejection still need verification.

Space to Earth

  1. Prepare for entry

    The return study stows the space radiators and shifts heat management to the entry configuration. Each hull needs its own thermal protection and heat-storage assessment.

  2. Atmospheric braking

    Aerodynamic drag slows the cruiser as GENI monitors heating. KETS boost stays inhibited in the atmosphere. Inverse Shield braking remains experimental.

  3. Runway approach

    In wing-borne flight, the twin aft rudders provide directional control and the separate elevons control pitch and roll. The two cruisers have different reference approach speeds.

  4. Touchdown and rollout

    The landing gear must carry the touchdown and braking loads. Both designs call for independent and emergency braking. Actual stopping distances still need testing.