CORAC debris-defence reserve
The surface station’s dedicated reserve charges from available fusion electricity after protected services are supplied.
Normal operation / Fault response / Recovery Interactive replay
Starting conditions
Protected services have priority. The reserve study starts with its dedicated branch electrically separated.
Operating sequence
Supply protected loads
SERAT accounts for plant, crew and refuge demand before allocating electricity to station charging.
Charge the dedicated reserve
The station uses its own SERAT charging service. Charging pauses if fusion supply is unavailable.
Hold or isolate
Incoming-object alerts reach NEXUS and support the crew refuge procedure. AXIOM can isolate charging or the separate bay feed.
Account for safe recovery
The proposed bay uses the isolated reserve through its Weapon Fuse Chamber. Local cooling supports shutdown, and ZSA owns test authorization.
Hold and recovery
Suspend charging or isolate the branch when protected-load priority or verified readiness cannot be maintained.
Model and references
Open the interactive cycleReserve capacity, recharge time and interception performance remain qualification items.
ZENIT concept procedure. Models and replays use illustrative conditions.