Earth Earth Fusion Facility

Earth Fusion Facility startup and trip

Follow the Earth core from standby to qualified delivery at the separate SERAT Energy Island.

Startup / Shutdown / Fault response Interactive replay

Starting conditions

The Earth core is in standby. The protected energy interface stays isolated while the model checks vacuum, confinement, cooling and local protection.

Operating sequence

  1. Review readiness

    Check the four prerequisite conditions shown in the core model.

  2. Establish plasma

    The conceptual core admits and heats fuel after readiness checks pass.

  3. Qualify the delivery path

    Follow heat extraction and conditioning before the separate SERAT Energy Island accepts supply.

  4. Observe a cooling fault

    The replay halts startup or trips the running core when required cooling is lost.

Earth fusion service hall with separated machinery and heat-transfer equipment.
Earth Fusion Facility concept. The separation between the reactor and heat-transfer equipment helps explain why the receiving path has its own checks.

Hold and recovery

Preserve local protection and check the cause of the fault. A later attempt starts with the readiness sequence again.

Model and references

Run the Earth core model

ZENIT concept procedure. Models and replays use illustrative conditions.