Plasma fusion startup and shutdown
The shared sequence checks confinement, cooling and local protection before allowing a core to supply energy to SERAT.
Startup / Shutdown / Fault response Interactive replay
Starting conditions
The sequence starts in standby with the SERAT feed isolated. Confinement, cooling and independent local protection are checked.
Operating sequence
Verify readiness
Check vacuum, confinement field, primary cooling and local protection. A failed readiness check holds fuel admission and heating.
Form and confine plasma
Protected startup power heats the fuel. Shaped coils confine the ionized fuel within the vacuum vessel.
Extract released energy
Reactor components absorb released energy. The primary cooling circuit carries heat to the conversion interface.
Connect protected output
Connect conditioned output to SERAT after the permitted operating state is verified. Fuel and exhaust stay within reactor circuits.
Stop or trip safely
Stop fuel and heating and isolate the feed. Local protection discharges stored field energy and removes residual heat.
Hold and recovery
Loss of required cooling keeps startup on hold or trips an active core in the model. A new start repeats the readiness checks.
Model and references
Run the plasma core modelZENIT concept procedure. Models and replays use illustrative conditions.