SafeSpot winter outage
Prioritize essential services and keep the local picture usable when the grid and regional data link go down.
Fault response / Recovery Interactive replay
Starting conditions
The Critical Continuity SafeSpot exercise begins with a charged reserve. Grid power and the external data link fail while local instruments and the recorder are still available.
Operating sequence
Check local service status
Use the LSI view to check air, water, reserve power and the age of each available reading.
Allocate the reserve
Keep the exercise’s essential services selected. Compare the planned outage duration with the reserve estimate and review optional demand.
Verify any expired reading
If a reading expires, keep the affected service status unassessed while the operator checks the local indicator.
Restore reporting
Confirm the link and fresh readings before sharing regional status again. Retain the event record.
Try the decision
The data link returns, but the water-level reading has expired. What happens if the operator sends the last reported figure?
Forward the old figure
- The regional link is available again.
- The water reading is still stale. Its age prevents it from qualifying as current.
- Water availability stays unassessed until a fresh reading is verified.
Verify a fresh reading first
- The operator checks the local indicator and obtains a fresh sample.
- The time and source checks pass. The local record retains the earlier gap.
- The operator resumes regional reporting with the verified status.
Hold and recovery
If the reserve estimate falls short, review the optional loads and flag any remaining gap. Verify fresh evidence before updating an unassessed status.
Model and references
Try the SafeSpot outage exerciseZENIT concept procedure. Models and replays use illustrative conditions.