Skip to Operations
EARTH & SPACE / PROGRAM ATLAS
← Operations catalogue

Space Zorak

Zorak fusion fuel and refuelling

How could Zorak’s twin reactors power a long voyage? A proposed fuel loop recovers what the plasma did not use. Onboard stock replaces what fused or could not be reused.

Normal operation / Approach and transfer Interactive replay

Starting conditions

The twin core study begins with a known onboard fuel reserve and an assumed recovery fraction.

Operating sequence

  1. Load and check the reserve

    Before departure, record the verified fresh fuel and set aside a contingency reserve. Compare the available stock with the next leg’s expected demand. If it falls short, reduce planned power use or arrange a measured transfer at a compatible supply depot.

  2. Meter both feeds

    Each core would have its own metered feed and isolation. Verified recovered fuel joins fresh fuel at the feed. Vacuum, magnetic confinement, primary cooling and local protection must be ready before a core admits fuel.

  3. Run Fusion A and B

    Heating forms a plasma inside each core. Magnetic coils confine it. Some of the fuel nuclei fuse and release energy. The sealed exhaust system collects unburned fuel, ash and impurities from the plasma.

  4. Recover unburned fuel

    A proposed processor separates and checks the unburned fuel before sending it back to the feed. Ash and unsuitable material remain contained. A failed check isolates the affected return. If safe containment or verified fuel supply cannot be maintained, the affected core shuts down.

  5. Convert fusion energy

    A closed primary cooling circuit carries heat to the conversion equipment. Conversion produces electricity, and a heat-rejection path carries away the remaining heat. Fuel and exhaust stay inside the reactor’s process circuits.

  6. Send power to SERAT

    Conditioned electricity travels from each core through its Local Fuse and the corresponding lane of the Central Bidirectional Fuse to SERAT. SERAT routes propulsion power through the Vector Accelerator to the stern drives, with separate feeds for other ship systems.

A crew works at two monitoring consoles aboard the Zorak concept vessel.
Zorak operations-room concept. The crew can review the state of a service and the evidence available to support an operating decision.

Hold and recovery

Check usable recovered stock and fresh fuel separately. Keep unverified recovered material out of the eligible supply.

Model and references

Open the interactive cycle

The model illustrates a proposed fuel-recovery loop for each core, based on the CORAC study. Zorak’s fuel mix, recovery equipment, and time between resupply stops remain open design questions.

ZENIT concept procedure. Models and replays use illustrative conditions.